# BJC Activity

# Job Costing Overview

# Job Costing Flow Diagram

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/D31image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/D31image.png)

# Job Costing Overview

#### Quote

Every job begins with a **Quote**, which provides the estimated cost of the work and serves as the basis for customer approval. Once approved, the quote can be promoted to a **Managed Job**—the central stage where production activities are tracked, coordinated, and monitored.

From there, you have two workflow options:

- **Option 1:** Proceed to a **Delivery Note** if items need to be dispatched, followed by an **Invoice**.
- **Option 2:** Go directly from **Managed Job** to **Invoice** if no delivery documentation is required.

Alternatively, you can initiate a job directly from the **Managed Job** stage. In this case, the system will automatically generate a corresponding quote, ensuring every job remains linked to a quote—regardless of where it begins.

Invoicing can be structured in two primary formats: percentage-based or usage-based. Each format can be further refined into actual or forecasted (predicted) invoicing. Multiple invoices can be issued under either approach, depending on project needs or billing cycles.

---

##### Manage Job

The **Managed Job** stage is the operational heart of your workflow—where production activities are created, tracked, and coordinated. You can initiate a job directly from this stage, and the system will automatically generate a corresponding **Quote**, ensuring every job remains linked to a quote regardless of where it begins. This maintains traceability and financial alignment across all job types.

Once a job is created, you have two management options:

- **Manage All Lines as a Single Function**:  
    This approach is ideal for **smaller jobs** with limited complexity. It allows you to control all job components in one place, streamlining updates and reducing overhead. However, caution is advised for **larger jobs**, as this method can obscure individual line-level visibility and make it harder to track progress or isolate issues.
- **Manage Job Line by Line**:  
    Recommended for **larger or multi-phase jobs**, this method gives you more control over each line item. You can monitor progress, allocate resources, and adjust timelines independently, ensuring better oversight and flexibility throughout the job lifecycle.

Within the Managed Job stage, you can also access and update key operational modules:

- **Time Sheets**: Record labour hours and assign them to specific job lines or phases. This supports accurate cost tracking and resource planning.
- **Stock Requests**: Generate requests for items not currently in stock. These requests trigger procurement workflows to ensure materials are available when needed.
- **GRV (Goods Received Voucher)**: Use GRVs to document partial dispatches, especially useful when some items are ready for delivery while others remain in production.
- **BOM (Bill of Materials)**: Manage and update BOMs to reflect the materials required for each job line. This ensures production teams have clear visibility into what’s needed and when.

Together, these tools provide a robust framework for managing jobs of any size, supporting both operational efficiency and financial accuracy

---

#### Delivery Note

Once a job, or part of a job is complete and ready for dispatch, a **Delivery Note** can be prepared to document the items being sent. This note serves as the formal record of what’s leaving your premises and when.

You can choose between two dispatch-to-invoice workflows:

- **One Delivery Note to One Invoice**: Ideal for single shipments or straightforward billing.
- **Multiple Delivery Notes to One Invoice**: Useful for staged deliveries that are consolidated into a single invoice for streamlined billing.

This flexibility ensures your dispatch and invoicing processes stay aligned with the pace and structure of the job.

---

#### Invoice

Invoicing can be structured in two primary formats: percentage-based or usage-based. Each format can be further refined into actual or forecasted (predicted) invoicing. Multiple invoices can be issued under either approach, depending on project needs or billing cycles.

Invoicing can be structured around two distinct approaches. **Forecasted** and **Actual,** each with its own implications for cost control and client expectations.

- **Forecasted Invoicing -** Forecasted invoicing is based on the original quote accepted by the client. This quote sets a fixed financial boundary for the job. Any costs incurred beyond the quoted amount are absorbed by the company, as the client has agreed to the scope and price upfront. This model is ideal for projects with clearly defined deliverables and minimal expected variation.
- **Usage/Actual Invoicing -** Actual invoicing reflects the real costs incurred during the job. It’s typically used for charge-up jobs, where billing is based on time, materials, or usage. If costs exceed the original quote, this is treated as scope creep, usually due to client-driven changes or additions. These adjustments are communicated and invoiced accordingly.

\- Invoices reflect **real item costs**, similar to a traditional invoice format.  
\- You can compare **quoted item costs and selling prices** against actuals and invoiced amounts.  
\- This model is ideal for jobs with variable scope or evolving material requirements.

- **Percentage-Based Invoicing -** Percentage invoicing allows you to bill progressively over the life of a job. It’s especially useful for long-term or multi-phase projects.
- You can issue an invoice **before the job starts**, based on an agreed percentage.  
    \- Costs are tracked against the quote, allowing you to compare **estimated vs actuals**.  
    \- This approach helps maintain **monthly profit and loss consistency**, supporting smoother financial reporting.

# Job Costing Quotes

# Creating a New Quote

<span class="ts10">Video training manual 2020 - </span>[Click Here](https://vimeo.com/412167002)

<span class="ts10">Video training manual 2016 - </span>[Click Here](https://vimeo.com/357005742)

<span style="color: rgb(45, 194, 107);">**<span class="ts15">Job Costing Module &gt; Activity &gt; New Quote</span>**</span>

<span style="color: rgb(0, 0, 0);"><span class="ts15">A job can be created from a Quote</span></span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/scaled-1680-/pH9image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/pH9image.png)

**Quote Details Tab**

<table border="1" id="bkmrk-quote-number-quote-n" style="border-collapse: collapse; width: 100%;"><colgroup><col style="width: 21.815%;"></col><col style="width: 78.2003%;"></col></colgroup><tbody><tr><td>Quote Number</td><td>Quote number will populate when the Quote is saved</td></tr><tr><td>Debtors

</td><td><div>Search and select the appropriate **Account (company)** or **Contact (individual)** from the list.</div></td></tr><tr><td>Debtors Name</td><td>Debtors Name will populate when the Quote is saved</td></tr><tr><td>Sales Rep</td><td>Select a Sales if required</td></tr><tr><td>Quote Date</td><td>Select Date </td></tr><tr><td>Valid Until Date  
</td><td>Select the date until which the quote is valid.

</td></tr><tr><td>Delivery Date</td><td><div>Select he date when the goods or services are expected to be delivered to the customer.</div></td></tr><tr><td>Quote Status </td><td><div>Automatically updates as the quote progresses through the approval process.</div></td></tr><tr><td>Description</td><td><div>A free-text field used to clearly identify the quote.</div></td></tr><tr><td>Reference</td><td><div>A customer-provided identifier used to track or link the quote</div></td></tr><tr><td>Order Number</td><td><div>A customer-provided number used to identify and track the order</div></td></tr><tr><td>Currency View</td><td><div>Displays the system’s default currency, with the option to switch between currencies if multi-currency is enabled.</div></td></tr><tr><td>Exchange Rate</td><td><div>The rate used to convert amounts from one currency to another</div></td></tr><tr><td>Comments</td><td><div>A free-text field used to add notes or additional information about the quote</div></td></tr></tbody></table>

**<span class="ts0">Address tab</span>**

<table border="1" id="bkmrk-address-type-the-def" style="border-collapse: collapse; width: 100%; height: 332.361px;"><colgroup><col style="width: 21.9719%;"></col><col style="width: 77.9242%;"></col></colgroup><tbody><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Address Type</td><td style="height: 29.8785px;"><div>The default address is automatically selected, but you can change it for the current quote if needed.</div></td></tr><tr style="height: 46.6667px;"><td style="height: 46.6667px;"><span class="ts0">Contact Person</span></td><td style="height: 46.6667px;"><div>The default contact is automatically selected, but you can change it for this quote. To edit the contact’s details, click the view button.</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Project

</td><td style="height: 29.8785px;"><div>Select the relevant project associated with the quote, if applicable.</div></td></tr><tr style="height: 46.6667px;"><td style="height: 46.6667px;">Division</td><td style="height: 46.6667px;"><div>The default division is automatically selected, but you can change the customer’s division within the company if needed.</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Region</td><td style="height: 29.8785px;"><div>The default region is automatically selected, but you can change the customer’s region if needed.</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Invoice Group</td><td style="height: 29.8785px;"><div>Select the customer’s invoice group.</div></td></tr></tbody></table>

**<span class="ts0">Extras tab</span>**

<table border="1" id="bkmrk-completion-date-the-" style="border-collapse: collapse; width: 100%; height: 358.542px;"><colgroup><col style="width: 22.5671%;"></col><col style="width: 77.329%;"></col></colgroup><tbody><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Completion Date</td><td style="height: 29.8785px;"><div>The date when the job is expected to be completed.</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Job No.</td><td style="height: 29.8785px;"><div>Assign a job number to the quote in advance.</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><span class="ts0">Attach Spec To Email</span></td><td style="height: 29.8785px;"><div>Allows you to include the specification document when sending the quote via email.</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><span class="ts0">Print Custom Fields</span></td><td style="height: 29.8785px;"><div>Includes custom fields in the printed quote (see Custom Fields tab).</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><span class="ts0">Please select the stock type</span></td><td style="height: 29.8785px;"><div>Select the type of stock for the item.</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><span class="ts0">Markup %</span></td><td style="height: 29.8785px;"><div>The percentage added to the cost price to determine the selling price.</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><span class="ts0">Text field</span></td><td style="height: 29.8785px;"><div>A free-text field used to enter additional details or information.</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><span class="ts0">Set Markup % Button</span></td><td style="height: 29.8785px;"><span class="ts0">Allows the user to change the mark-up on selected stock type lines.</span></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><span class="ts0">Remove lines button</span></td><td style="height: 29.8785px;"><div>Allows you to remove quote lines based on the selected stock type</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><span class="ts0">Zero Sell, Price</span></td><td style="height: 29.8785px;"><div>Allows you to set the selling price of the selected stock type lines to zero.</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Long Description</td><td style="height: 29.8785px;"><div>A detailed overview providing additional information about the quote.</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><span class="ts0">Custom Fields</span></td><td style="height: 29.8785px;"><div>Allows you to add and manage additional fields on the quote as needed.</div></td></tr></tbody></table>

##### <span class="ts15">Overall Quote View</span>

<span class="ts0">You will notice the bottom of the window the selling price, costs and profit that will be made on the job.</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/scaled-1680-/ghgimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/ghgimage.png)

##### <span class="ts15">Printing and Emailing of Quote</span>

<span class="ts0">You can email the quote off to the client or print out.</span>

- <span class="ts0">Click Print Quote</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/scaled-1680-/BgQimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/BgQimage.png)

The below window will provide you with options on what you want your quote to look like.

Click "**Continue**"

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/scaled-1680-/8fPimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/8fPimage.png)

<div id="bkmrk-you-can-choose-to-se">You can choose to send the quote, email it to yourself to include in an outbound message, or print a copy for your records.</div><div id="bkmrk--6"></div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/scaled-1680-/9eYimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/9eYimage.png)

# Promoting Quote to a Job

##### Promoting Quote to a Job

<div id="bkmrk-once-a-quote-is-acce">- Once a quote is accepted, it can be approved and converted into a job by clicking "**Approval Options**" and selecting "**Approve to Job**"

</div><div id="bkmrk--2"></div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/scaled-1680-/NJ3image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/NJ3image.png)

- Select the settings in the below screen for your Job
- Click "**Continue**"

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/scaled-1680-/Pnyimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/Pnyimage.png)

<table border="1" id="bkmrk-job-description-orde" style="border-collapse: collapse; width: 100%; height: 703.994px;"><colgroup><col style="width: 25.5433%;"></col><col style="width: 74.3528%;"></col></colgroup><tbody><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Job Description</td><td style="height: 29.8785px;"><div>A brief description to help identify the job.</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Order Number</td><td style="height: 29.8785px;">A unique reference number assigned to an order to help identify and track it.

</td></tr><tr style="height: 46.6667px;"><td style="height: 46.6667px;">Long Description </td><td style="height: 46.6667px;">A detailed explanation of an item, job, or order, providing more information beyond the short description.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Team</td><td style="height: 29.8785px;"><div>Used to assign a specific team to a job when teams are set up.</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Employee</td><td style="height: 29.8785px;">Used to assign a specific employee to a job.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Department</td><td style="height: 29.8785px;">Used to assign or identify the department responsible for a job.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Function</td><td style="height: 29.8785px;">  
</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Est Start Date</td><td style="height: 29.8785px;">The planned or expected date a job is scheduled to begin.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Group Activity </td><td style="height: 29.8785px;">  
</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Completion Date</td><td style="height: 29.8785px;">The date a job is completed or expected to be finished.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Delivery Date</td><td style="height: 29.8785px;">The date when goods or work are scheduled to be delivered or completed.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Create PO Drop Ship</td><td style="height: 29.8785px;">Generates a purchase order for items to be shipped directly from the supplier to the customer.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Allow To Exceed Quote Value</td><td style="height: 29.8785px;">Permits the final job or order cost to go over the originally quoted amount.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Allow To Exceed budget Qty</td><td style="height: 29.8785px;">Permits the quantity used or ordered for a job to exceed the originally budgeted amount.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Active Report Dates</td><td style="height: 29.8785px;">The date range selected to define which records or data are included in a report.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Use build Task Defaults</td><td style="height: 29.8785px;">  
</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Charge Up (SC)</td><td style="height: 29.8785px;">Applies an additional charge to a job or item over and above the accepted quote amount.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Pre-priced (CTC)</td><td style="height: 29.8785px;"><div>Indicates that the cost is fixed in advance, already included in the pricing, and cannot be exceeded without further approval.</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Assembly</td><td style="height: 29.8785px;">  
</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Lock Employee</td><td style="height: 29.8785px;">Prevents changes to the employee assigned to a job without the necessary permission or approval.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Warehouse</td><td style="height: 29.8785px;">Selects the warehouse location from which stock will be sourced for a job or order.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Job Link</td><td style="height: 29.8785px;">Used to link or associate one job with another related job.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">Service Card</td><td style="height: 29.8785px;">Used to print a job card with the details required to complete a job.

</td></tr></tbody></table>

A unique number automatically assigned to identify and track a job.

- Click "**OK**"

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/scaled-1680-/RYXimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/RYXimage.png)

- To view your job click on "**Manage Job**"

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/scaled-1680-/XWEimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-05/XWEimage.png)

# Manage Quantity on Job

**Manage Quantity on Job**

You can automatically manage quote lines by enabling the **Manage Qty on Job** option.

<div id="bkmrk-on-the-quote-header%2C">- On the quote header, go to the **Extras** tab
- Tick **Manage Qty on Job**

</div>This ensures that all lines added to the quote are automatically marked for **managed quantity on the job**.

**Updating Existing Quotes**

The **lightning bolt button** can be used to update older quotes, or quotes where the option was not selected when first created.

<div id="bkmrk-clicking-this-button">- Clicking this button will update all existing lines on the quote
- All lines will then have **Manage Qty on Job** applied

</div>**Default Behaviour**

<div id="bkmrk-by-default%2C-this-opt">- By default, this option is **unticked**
- This is because quotes are not always managed directly to a job, as their primary purpose is to **prepare and budget work before job execution**

</div><span class="ts0"> </span>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/4bVimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/4bVimage.png)

<span class="ts0"> </span>

<span class="ts0"> </span>Once lines are entered, the **Manage Quantity on Job** option will be automatically selected for each line.

<span class="ts0"> </span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/avFimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/avFimage.png)

<span class="ts0"> </span>

<div id="bkmrk-there-is-a-column-in">There is a **column indicator** that shows whether the **Manage Quantity on Job** option is selected for each line</div><span class="ts0"> </span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/paZimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/paZimage.png)

<span class="ts0"> </span>

<span class="ts0"> </span>Job lines are processed once they have been **managed**, marked as **Is Complete**, and their status updated to **Complete**

**Rule**

<div id="bkmrk-if-there-is-insuffic"><div>- If there is **insufficient stock available**, the line cannot be managed
- This includes situations where stock exists but **is not enough to fully cover the required quantity**

</div></div>In these cases, the line will remain **unmanaged on the job** until sufficient stock is available

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/tT5image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/tT5image.png)

<span class="ts0"> </span><span class="ts0"> </span>

<span class="ts0"></span>

# Quote Tabs Explained

<span style="color: rgb(45, 194, 107);">**Job Costing Module &gt;Activity &gt; Quotation**</span>

<div id="bkmrk-open-or-create-a-quo">1. **Open or Create a Quote**
    
    
    - Navigate to the **Quotes** section.
    - Click "**Add**" or open an existing one.
2. **Locate the Customer Field**
    
    
    - Look for a field labeled **Customer**, **Account**, or **Contact**.
3. **Save the Quote**
    
    
    - Click **Save** to lock in the selected customer.

</div><p class="callout info">Tips</p>

<div id="bkmrk-if-the-customer-isn%E2%80%99">- If the customer isn’t listed, you may need to **create a new customer record first**.
- Ensure you select the correct type (Account vs Contact) depending on your system’s setup.

</div>#### [![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/VITimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/VITimage.png)

#### Quote Tabs Explained Detailed

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/0LVimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/0LVimage.png)

<div id="bkmrk--2"></div>

##### Quote Detail Tab

This screen is used to create and manage customer quotes, capturing key details such as the customer, dates, pricing, and references, while allowing you to add and manage items included in the quote.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/7Bqimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/7Bqimage.png)

<table border="1" id="bkmrk-quote-automatically-" style="border-collapse: collapse; width: 100%; height: 462.111px;"><colgroup><col style="width: 17.4339%;"></col><col style="width: 82.672%;"></col></colgroup><tbody><tr style="height: 29.6875px;"><td style="height: 29.6875px;">**Quote**</td><td style="height: 29.6875px;">Automatically generated</td></tr><tr style="height: 46.4861px;"><td style="height: 46.4861px;">**Customer**</td><td style="height: 46.4861px;"><div><div>Choose the appropriate **Account (company)** or **Contact (individual)** from the list</div></div></td></tr><tr style="height: 29.6875px;"><td style="height: 29.6875px;">**Customer Name**</td><td style="height: 29.6875px;">Auto populates as customer is selected</td></tr><tr style="height: 29.6875px;"><td style="height: 29.6875px;">**Sales Rep**</td><td style="height: 29.6875px;">Select a sales rep for this customer </td></tr><tr style="height: 29.6875px;"><td style="height: 29.6875px;">**Quote Date**</td><td style="height: 29.6875px;">Usually todays date</td></tr><tr style="height: 29.6875px;"><td style="height: 29.6875px;">**Valid Until Date**</td><td style="height: 29.6875px;">**Select the date until which the quote is valid.**

</td></tr><tr style="height: 29.6875px;"><td style="height: 29.6875px;">**Delivery Date**</td><td style="height: 29.6875px;"><div>The date when the goods or services are expected to be delivered to the customer</div></td></tr><tr style="height: 29.6875px;"><td style="height: 29.6875px;">**Quote Status**</td><td style="height: 29.6875px;"><div>Automatically updates as the quote progresses through the approval process.</div></td></tr><tr style="height: 29.6875px;"><td style="height: 29.6875px;">**Description**</td><td style="height: 29.6875px;"><div>A free-text field used to clearly identify the quote.</div></td></tr><tr style="height: 29.6875px;"><td style="height: 29.6875px;">**Reference**</td><td style="height: 29.6875px;"><div>A customer-provided identifier used to track or link the quote.</div></td></tr><tr style="height: 29.6875px;"><td style="height: 29.6875px;">**Order Number**</td><td style="height: 29.6875px;"><div><div>A customer-provided number used to identify and track the order</div></div></td></tr><tr style="height: 29.6875px;"><td style="height: 29.6875px;">**Currency View**</td><td style="height: 29.6875px;"><div>Displays the system’s default currency, with the option to switch between currencies if multi-currency is enabled</div></td></tr><tr style="height: 29.6875px;"><td style="height: 29.6875px;"><div>**Exchange Rate**</div></td><td style="height: 29.6875px;"><div>The rate used to convert amounts from one currency to another.</div></td></tr><tr style="height: 29.6875px;"><td style="height: 29.6875px;"><div>**Comments**</div></td><td style="height: 29.6875px;"><div>A free-text field used to add notes or additional information about the quote.</div></td></tr></tbody></table>




##### Address Tab

<div id="bkmrk-the-address-tab-capt">The **Address tab** captures and allows editing of the customer’s delivery and contact details for the quote, including address information, contact person, and associated business details such as project, division, and branch.</div><div id="bkmrk--5"></div><div id="bkmrk--6"></div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/luvimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/luvimage.png)

<table border="1" id="bkmrk-address-type-the-def" style="border-collapse: collapse; width: 100%;"><colgroup><col style="width: 17.9101%;"></col><col style="width: 82.1958%;"></col></colgroup><tbody><tr><td>**Address Type**</td><td><div><div>The default address is automatically selected, but you can change it for the current quote if needed.</div></div></td></tr><tr><td>**Address Lines 1-4**</td><td>Address</td></tr><tr><td>**Address Code**</td><td>Postal Code</td></tr><tr><td>**VAT No.**</td><td>Customer Tax Number</td></tr><tr><td>**Contact Person**</td><td><div>The default contact is automatically selected, but you can change it for this quote. To edit the contact’s details, click the view button.</div></td></tr><tr><td>**Contact Number**</td><td>Customer Contact Persons Number</td></tr><tr><td>**Project**</td><td><div>Select the relevant project associated with the quote, if applicable.</div></td></tr><tr><td>**Division**</td><td><div><div>The default division is automatically selected, but you can change the customer’s division within the company if needed.</div></div></td></tr><tr><td>**Region**</td><td><div>The default region is automatically selected, but you can change the customer’s region if needed.</div></td></tr><tr><td>**Invoice Group**</td><td><div>Select the customer’s invoice group.</div></td></tr><tr><td>**Branch**</td><td>Company Branch</td></tr></tbody></table>

##### Extras Tab

<div id="bkmrk-the-extras-tab-provi">The **Extras tab** provides additional settings and controls for the quote, including job details, asset linking, costing options, reporting preferences, and sales lead tracking, allowing for better management of how the quote is processed, billed, and reported.</div><div id="bkmrk--9"></div><div id="bkmrk--10"></div><div id="bkmrk--11"></div><div id="bkmrk--12"></div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/fH1image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/fH1image.png)

<table border="1" id="bkmrk-1-job-number-2-compl" style="width: 100%;"><colgroup><col style="width: 4.52871%;"></col><col style="width: 18.3532%;"></col><col style="width: 77.1073%;"></col></colgroup><tbody><tr><td>1</td><td>**Job Number**</td><td>Clicking '**Assign JN**' at this stage will generate a Job Number for the quote, which will automatically carry over once the quote is approved and converted into a actual job.</td></tr><tr><td>2</td><td>**Completion Date**</td><td>This is the date that you are expected to be able to complete this Job</td></tr><tr><td>3</td><td>**Asset Item**</td><td>The **Asset Item** field links a company-owned asset (e.g., printer, scanner, laptop) to a specific job or quote. This ensures equipment used is tracked, recorded, and associated with the job for better visibility and management.</td></tr><tr><td>4</td><td>**Customer Status**</td><td>Options "On Hold"</td></tr><tr><td>5</td><td>**Assembly**</td><td>“**Assembly**” refers to an internal process where components or materials are prepared, combined, or staged before installation or delivery. It’s not billed separately to the customer but contributes to your overall job cost.</td></tr><tr><td>6</td><td>**Charge Up (SC)**</td><td>**Charge Up (SC)”** means the customer is billed for actual time and materials used, including any extras beyond the initial scope. Charge Up allows you to invoice for additional costs incurred during the job.</td></tr><tr><td>7</td><td>**Prepaid (Cost to Company)**</td><td>**"Prepaid**” refers to the quoted amount for the job, the fixed charge agreed to by the customer. You can’t invoice beyond this amount, so any extra time, materials, or costs that exceed the quote become your internal expense, or ‘**Cost to Company (CTC)**</td></tr><tr><td>8</td><td>**Assign JN**</td><td>Clicking '**Assign JN**' at this stage will generate a Job Number for the quote, which will automatically carry over once the quote is approved and converted into a actual job.</td></tr><tr><td>9</td><td>**Long Description**</td><td>Here you can write a description of the job being done.</td></tr><tr><td>10</td><td>**Print Custom Fields**</td><td>Includes custom fields in the printed quote (see Custom Fields tab).</td></tr><tr><td>11</td><td>**Manage Qty on Job**</td><td>The **“Manage Qty on Job”** tick box automatically transfers and manages item quantities when a quote is converted into a job, ensuring quantities remain accurate without manual adjustment.</td></tr><tr><td>12</td><td>**Exclude from Reports**</td><td>This flag will assist when running reports on quote values, allowing us to exclude certain quotes (effectively treating them as zero).</td></tr><tr><td>13</td><td>**Quote Total Description**</td><td>  
</td></tr><tr><td>14</td><td>**Sales Lead**</td><td>If this quote originated from a tracked **Sales Lead**, the associated Sales Lead number will be displayed here. Updating the Probability percentage will automatically sync the change with the corresponding Sales Lead.</td></tr><tr><td>15</td><td>**Sales Lead Follow up Date** </td><td> Updating the **Follow up** the system will automatically sync the change with the corresponding Sales Lead follow up date.</td></tr><tr><td>16</td><td>**Quote Estimate**</td><td>  
</td></tr><tr><td>17</td><td>**Probability**</td><td>If this quote originated from a tracked **Sales Lead**, the associated Sales Lead number will be displayed here. Updating the Probability percentage will automatically sync the change with the corresponding Sales Lead.</td></tr><tr><td>18</td><td>**Paging**</td><td>If your line items span multiple pages and require navigation using the page up/down arrows, clicking the Paging Box will disable paging, allowing you to scroll through all items in a continuous view.</td></tr><tr><td>19</td><td>**Dimension**</td><td>  
</td></tr><tr><td>20</td><td>**Show/Hide**</td><td>Allows you to **control which sections or fields are visible** on the screen. This can help simplify the interface by hiding fields that are not relevant to your workflow.

</td></tr></tbody></table>

##### Link Tab

Below is an overview of the fields available under the **Link Tab** on the quote screen:

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/BgQimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/BgQimage.png)

<table border="1" id="bkmrk-1-customer-link-cust" style="width: 100%;"><colgroup><col style="width: 4.40953%;"></col><col style="width: 15.4912%;"></col><col style="width: 80.0885%;"></col></colgroup><tbody><tr><td>1</td><td>**Customer Link**</td><td>- **Customer Link:** Use this tab when completing work on behalf of another company.
- If you're quoting for a client of one of your customers, you can link that end client here.
- When the quote is sent, your customer will see which of their clients the quote relates to.

</td></tr><tr><td>2</td><td>**Address Type**</td><td>This defines the **type of address** being used (for example, billing, delivery, or site address). Selecting the correct type ensures the quote is applied to the right location.

</td></tr><tr><td>3-6</td><td>**Address line 1-4**</td><td>These fields capture the **full address details** associated with the quote. You can enter street, suburb, city, and any additional location information required.

</td></tr><tr><td>7</td><td>**Address code**</td><td>A reference code used to identify saved or standard addresses.

</td></tr><tr><td>8</td><td>**Deposit Paid**</td><td>Enter the **value of the deposit** paid. This amount will be **automatically deducted from the total quote value**, giving a more accurate balance owing.

</td></tr><tr><td>9</td><td>**Deposit Amount**</td><td>Tick this box if the customer has already made a **deposit payment**. This flags the quote so the system knows part payment has been received.

</td></tr><tr><td>10</td><td>**Deposit Date**</td><td>Record the exact **date the deposit was received**. This is useful for tracking payments and keeping financial records accurate.

</td></tr><tr><td>11</td><td>**Paging**</td><td>When a quote contains a large number of line items, they may be split across multiple pages.

<div>- With **Paging enabled**, you scroll through all items in one continuous list
- With Paging off, you use **page navigation arrows** to move between pages  
    This helps improve visibility depending on your preference.

</div></td></tr><tr><td>12</td><td>**Dimension**</td><td>  
</td></tr><tr><td>13</td><td>**Show/Hide**</td><td>Allows you to **control which sections or fields are visible** on the screen. This can help simplify the interface by hiding fields that are not relevant to your workflow.

</td></tr></tbody></table>

##### Shipping Tab

Below is a detailed overview of the fields available under the **Shipping tab** on the quote screen:

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/aLMimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/aLMimage.png)

<table border="1" id="bkmrk-1-2-3-4-5-6-7-8-9-10" style="width: 100%;"><colgroup><col style="width: 4.29036%;"></col><col style="width: 17.8682%;"></col><col style="width: 77.8306%;"></col></colgroup><tbody><tr><td>1</td><td>**Shipping Method**</td><td>Select the **method of delivery** for the order (e.g. courier, pickup, freight). This helps define how the goods will be sent to the customer.

</td></tr><tr><td>2</td><td>**Shipping Date**</td><td>Enter the **date (and time)** the order is scheduled to be shipped. This is useful for planning dispatch and providing accurate delivery expectations.

</td></tr><tr><td>3</td><td>**Send Email**</td><td>Tick this option if you want the system to **send a notification email** related to the shipment (e.g. confirmation or dispatch details).

</td></tr><tr><td>4</td><td>**Shipping Location** </td><td>Specifies the **destination location** the goods are being shipped to. This may differ from the billing address if the customer has multiple delivery sites.

</td></tr><tr><td>5</td><td>**Internal Delivery** </td><td>Used when the delivery is being handled **internally by your own team or vehicles**, rather than an external courier.

</td></tr><tr><td>6</td><td>**Delivery Company**</td><td>Select or enter the **external courier or freight company** responsible for delivering the shipment (e.g. NZ Post, Mainfreight).

</td></tr><tr><td>7</td><td>**Tracking Number**</td><td>Enter the **tracking number** provided by the courier. This allows both your team and the customer to track the shipment progress.

</td></tr><tr><td>8</td><td>**Frozen**</td><td>Enter the **tracking number** provided by the courier. This allows both your team and the customer to track the shipment progress.

</td></tr><tr><td>9</td><td>**Paging**</td><td>When there are many line items:

<div>- **Paging enabled**: all items appear in one continuous, scrollable list
- Paging disabled: items are split across multiple pages and require navigation  
    This helps improve visibility depending on your preference.

</div></td></tr><tr><td>10</td><td>**Dimension**</td><td>  
</td></tr><tr><td>11</td><td>**Show/Hide**</td><td>Allows you to **customise the screen view** by showing or hiding certain fields or sections, helping keep the interface clean and relevant.

</td></tr></tbody></table>

##### Action Tab

Below is a detailed overview of the fields and functions available under the **Action tab** on the quote screen:

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/Ftcimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/Ftcimage.png)

<table border="1" id="bkmrk-1-2-3-4-5-6-7-8-9-10-1" style="width: 100%; height: 803.864px;"><colgroup><col style="width: 4.52871%;"></col><col style="width: 18.9406%;"></col><col style="width: 76.5199%;"></col></colgroup><tbody><tr style="height: 46.5057px;"><td style="height: 46.5057px;">1</td><td style="height: 46.5057px;">**Stock Type**</td><td style="height: 46.5057px;">Allows you to filter or apply actions to a specific **type of stock** (e.g. all items, stock items only, or non-stock items). This ensures changes are applied only where needed.

</td></tr><tr style="height: 46.5057px;"><td style="height: 46.5057px;">2</td><td style="height: 46.5057px;">**Update Value**</td><td style="height: 46.5057px;">Determines whether pricing updates are applied **including or excluding VAT**. This is important for maintaining accurate pricing calculations depending on how your system is set up.

</td></tr><tr style="height: 103.551px;"><td style="height: 103.551px;">3</td><td style="height: 103.551px;">**Rounding Up**</td><td style="height: 103.551px;">Controls how pricing values are rounded:

<div>- **Round Up** or **Round Down**
- Or choose **No Rounding**  
    This ensures your final pricing is clean and consistent (e.g. avoiding uneven decimal values

</div></td></tr><tr style="height: 103.551px;"><td style="height: 103.551px;">4</td><td style="height: 103.551px;">**Rounding Down**</td><td style="height: 103.551px;">Controls how pricing values are rounded:

<div>- **Round Up** or **Round Down**
- Or choose **No Rounding**  
    This ensures your final pricing is clean and consistent (e.g. avoiding uneven decimal values

</div></td></tr><tr style="height: 46.5057px;"><td style="height: 46.5057px;">5</td><td style="height: 46.5057px;">**Mark-Up %**</td><td style="height: 46.5057px;">Enter the desired **markup percentage** to apply to selected line items. This is used to calculate selling prices based on cost.

</td></tr><tr style="height: 46.5057px;"><td style="height: 46.5057px;">6</td><td style="height: 46.5057px;">**Set Mark-Up %**</td><td style="height: 46.5057px;">Applies the entered **markup percentage** across selected items. This is a quick way to update pricing in bulk.

</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">7</td><td style="height: 29.7017px;">**Remove Lines**</td><td style="height: 29.7017px;">Removes selected **line items** from the quote. Useful for cleaning up or adjusting the quote quickly.

</td></tr><tr style="height: 46.5057px;"><td style="height: 46.5057px;">8</td><td style="height: 46.5057px;">**Zero Sell, Price**</td><td style="height: 46.5057px;">Sets the **selling price to zero** for selected items. This may be used for complimentary items, warranty replacements, or no-charge components.

</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">9</td><td style="height: 29.7017px;">**Incl. Cost on Reports**</td><td style="height: 29.7017px;">When enabled, this includes **cost values in reports**, allowing for visibility of margins and profitability.

</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">10</td><td style="height: 29.7017px;">**Attach Specs to Email**</td><td style="height: 29.7017px;">Tick this option to **include product specifications** when emailing the quote to the customer.

</td></tr><tr style="height: 46.5057px;"><td style="height: 46.5057px;">11</td><td style="height: 46.5057px;">**Set to Supplier Costs**</td><td style="height: 46.5057px;">Updates selected items so their pricing reflects the **supplier cost** directly. Useful when recalculating pricing based on updated supplier pricing.

</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">12</td><td style="height: 29.7017px;">**Update Labour Cost**</td><td style="height: 29.7017px;">Refreshes or updates the **labour cost values** associated with the quote.

</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">13</td><td style="height: 29.7017px;">**Set to System cost**</td><td style="height: 29.7017px;">Resets pricing to the **system’s default cost values**, ensuring consistency with your pricing database.

</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">14</td><td style="height: 29.7017px;">**Set Sell Price**</td><td style="height: 29.7017px;">Allows you to **manually set or update the selling price** for selected items.

</td></tr><tr style="height: 63.3097px;"><td style="height: 63.3097px;">15</td><td style="height: 63.3097px;">**Paging**</td><td style="height: 63.3097px;">When dealing with many line items:

<div>- **Paging enabled**: view all items in one continuous scroll
- Paging disabled: items are divided across multiple pages  
    This improves navigation depending on your preference.

</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">16</td><td style="height: 29.7017px;">**Dimension**</td><td style="height: 29.7017px;">  
</td></tr><tr style="height: 46.5057px;"><td style="height: 46.5057px;">17</td><td style="height: 46.5057px;">**Show/Hide**</td><td style="height: 46.5057px;">Allows you to **customise the screen view** by showing or hiding certain fields or sections, helping keep the interface clean and relevant.

</td></tr></tbody></table>



##### Docs Tab

This tab displays a list of all **documents that have been attached to the quote**. These could include files such as specifications, images, PDFs, or any supporting documentation relevant to the job.

This tab provides **instant access to upload documents in any format (PDF, Word, Excel, etc.)** or retrieve **relevant files previously attached** to this quote.

Each document listed will typically show details such as:

<div id="bkmrk-document-name-or-num">- **Document name or number**
- **Type of document**
- **Description**
- **Date created**
- **User who uploaded it**

</div>**Key Functions**

<div id="bkmrk-attachments-%28top-lef">- **Attachments (top left button)**  
    Allows you to **add new documents** to the quote. This is where you upload files that need to be linked or sent with the job or quote.
- **Add / Open / Print / Remove**  
    These options allow you to:
    
    
    - **Add** new documents
    - **Open** existing attachments
    - **Print** attached files
    - **Remove** documents if they are no longer required

</div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/0eDimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/0eDimage.png)

---

#### **Adding Stock Items to Quote**

This screen is used to add a stock item to a quote, define pricing, quantities, and control how the item is handled for the job, invoicing, and reporting.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/qWDimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/qWDimage.png)

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/LVXimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/LVXimage.png)

**Item &amp; Quantity Details**

<table border="1" id="bkmrk-stock-item-select-yo" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; width: 100%;"><colgroup><col style="width: 18.4724%;"></col><col style="width: 81.5168%;"></col></colgroup><tbody><tr><td>**Stock Item**</td><td>Select your **stock item** from the drop-down menu

</td></tr><tr><td>**Description**</td><td>At this stage you can change the **Description** if needed

</td></tr><tr><td>**Qty**</td><td>Add the **Quantity** you require of this item

</td></tr><tr><td>**Manage Qty on Job**</td><td>Controls whether the **quantity is actively tracked and managed** when the quote is converted to a job.

</td></tr><tr><td>**Warehouse**</td><td>Select the **Warehouse** you wish to sell this item form

</td></tr></tbody></table>

<div id="bkmrk-pricing">**Pricing**</div><div id="bkmrk--18"></div><table border="1" id="bkmrk-selling-ex-gst-price" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; width: 100%; height: 215.724px;"><colgroup><col style="width: 18.4724%;"></col><col style="width: 81.5168%;"></col></colgroup><tbody><tr style="height: 46.5057px;"><td style="height: 46.5057px;">**Selling Ex GST**</td><td style="height: 46.5057px;">Price per item does **not include** the 15% Goods and Services Tax. You add GST on top of the listed amount.

</td></tr><tr style="height: 46.5057px;"><td style="height: 46.5057px;">**Selling Inc GST**</td><td style="height: 46.5057px;">Price per item **includes** the 15% Goods and Services Tax. The GST is already built into the total amount shown.

</td></tr><tr style="height: 46.5057px;"><td style="height: 46.5057px;">**Sub Total Selling**</td><td style="height: 46.5057px;">Total price of total quantity of item that does **not include** the 15% Goods and Services Tax. You add GST on top of the listed amount.

</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**VAT (GST) Value**</td><td style="height: 29.7017px;">Total GST only on total quantity of items

</td></tr><tr style="height: 46.5057px;"><td style="height: 46.5057px;">**Selling Total**</td><td style="height: 46.5057px;">Total price of total quantity of item **includes** the 15% Goods and Services Tax. The GST is already built into the total amount shown.

</td></tr></tbody></table>

**Line Details**

<table border="1" id="bkmrk-line-reference-seque" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; width: 100.714%;"><colgroup><col style="width: 18.3971%;"></col><col style="width: 81.5924%;"></col></colgroup><tbody><tr><td>**Line Reference**</td><td></td></tr><tr><td>**Sequence No.**</td><td>You can change the Sequence in the quote for this item

</td></tr></tbody></table>

**Units &amp; Discounts**

<table border="1" id="bkmrk-uom-type-these-are-c" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; width: 100.238%;"><colgroup><col style="width: 18.4528%;"></col><col style="width: 81.5415%;"></col></colgroup><tbody><tr><td>**UOM Type**</td><td>These are custom configuration settings applied during setup, tailored specifically to your product formats (e.g., Per Roll, Per Unit, Pack).

</td></tr><tr><td>**UOM**</td><td>These are custom configuration settings applied during setup, tailored specifically to your product formats (e.g., 1000 per roll, 6 per pack).

</td></tr><tr><td>**Line Discount**</td><td>You can apply a discount to this item

</td></tr><tr><td>**VAT (GST)Type**</td><td>If this item is GST exempt or a Non-GST item it can be changed here

</td></tr></tbody></table>

**Margin &amp; Costing**

<table border="1" id="bkmrk-mark-up-%25-at-this-st" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; width: 101.071%;"><colgroup><col style="width: 18.4528%;"></col><col style="width: 81.5415%;"></col></colgroup><tbody><tr><td>**Mark up %**</td><td>At this stage you can increase your **profit %**

</td></tr><tr><td>**Cost Per Unit**</td><td>This is the **total cost** to produce or buy one item. It helps you set prices and track profitability.

</td></tr><tr><td>**Profit Cost/Unit**</td><td>This is **how much profit** you make on each item sold after subtracting its cost.</td></tr><tr><td>**Total Cost**</td><td>This s the **full amount spent** to produce or purchase a set of items or complete a job.</td></tr></tbody></table>

**Cost Behaviour**

<table border="1" id="bkmrk-zero-cost-on-job-the" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; width: 101.071%;"><colgroup><col style="width: 18.4528%;"></col><col style="width: 81.5415%;"></col></colgroup><tbody><tr><td>**Zero Cost on Job**</td><td>These ticks will be automatically on or off based on the setup if the item. When the item is promoted to a Job, its initial cost is cleared and recalculated progressively as the job is built—ensuring you have an accurate final cost at completion.

</td></tr><tr><td>**Zero Cost on Invoice**</td><td>As with the Cost on job, these ticks will be automatically on or off based on the setup if the item. When the item is promoted to a Job, its initial cost is cleared and recalculated progressively as the job is built—ensuring you have an accurate final cost at completion.

</td></tr></tbody></table>

**Visibility &amp; Reporting**

<table border="1" id="bkmrk-show-on-print-flag-f" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; width: 101.071%;"><colgroup><col style="width: 18.4528%;"></col><col style="width: 81.5415%;"></col></colgroup><tbody><tr><td>**Show on Print**</td><td></td></tr><tr><td>**Flag for Report**</td><td></td></tr></tbody></table>

**Organisation &amp; Scheduling**

<table border="1" id="bkmrk-division-select-a%C2%A0di" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; width: 101.071%;"><colgroup><col style="width: 18.4528%;"></col><col style="width: 81.5415%;"></col></colgroup><tbody><tr><td>**Division**</td><td>Select a **division** within of a company that focuses on one area of work.

</td></tr><tr><td>**Region**</td><td>Select a **region** the job will fall under, it can include multiple cities or towns and often has its own local government or identity.

</td></tr><tr><td>**Days from Start**</td><td>Use this field to schedule when this item should begin—set as a number of days from the job’s start date.</td></tr><tr><td>**Weight Per Unit**</td><td>This is determined at setup</td></tr></tbody></table>

**People &amp; Projects**

<table border="1" id="bkmrk-sales-rep-you-are-ab" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; width: 101.071%;"><colgroup><col style="width: 18.4528%;"></col><col style="width: 81.5415%;"></col></colgroup><tbody><tr><td>**Sales Rep**</td><td>You are able to allocate someone who promotes and sells a company’s products or services to customers. They often handle quotes, follow-ups, and customer relationships, helping drive revenue and build trust.</td></tr><tr><td>**Project**</td><td>You can Link a quote to a specific project</td></tr><tr><td>**Employee Assigned**</td><td>Refers to the specific person responsible for completing a task or project. It helps track accountability, scheduling, and communication.</td></tr></tbody></table>

**Dates &amp; Supplier Info**

<table border="1" id="bkmrk-lead-time-this-is-th" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; width: 101.071%;"><colgroup><col style="width: 18.4528%;"></col><col style="width: 81.5415%;"></col></colgroup><tbody><tr><td>**Lead Time**</td><td>This is the amount of time between starting a process and completing it. It usually refers to how long it takes from placing an order to receiving the goods or service.</td></tr><tr><td>**Order Date**</td><td>This is the day a customer places an order for goods or services.</td></tr><tr><td>**Reminder Date** </td><td>This is the day you plan to check in after sending the quote.</td></tr><tr><td>**Required Date**</td><td>This is the day the customer wants the goods or service delivered</td></tr><tr><td>**Supplier**</td><td>This is the company that provides goods or services to another business</td></tr></tbody></table>

**Purchasing Options**

<table border="1" id="bkmrk-drop-ship-ticking-th" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; width: 101.071%;"><colgroup><col style="width: 18.4528%;"></col><col style="width: 81.5415%;"></col></colgroup><tbody><tr><td>**Drop Ship**</td><td>Ticking this box enables you to generate a Purchase Order on the fly—complete with all relevant details, so you don’t need to build one from scratch when drop-shipping an item.

</td></tr><tr><td>**RFQ (Request for Quote)**</td><td>Ticking this box allows you to generate a Request for Quote on the fly—pre-filled with all relevant details, so you don’t need to start from scratch when requesting updated pricing for an item.

</td></tr><tr><td>**PO Qty**</td><td>Enter the quantity here for which you want to generate a Purchase Order or Request for Quote.

</td></tr></tbody></table>

**Supplier Costing**

<table border="1" id="bkmrk-item-cost-this-shows" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; width: 101.071%;"><colgroup><col style="width: 18.4528%;"></col><col style="width: 81.5415%;"></col></colgroup><tbody><tr><td>**Item Cost**</td><td>This shows the actual cost of the item

</td></tr><tr><td>**Item Code**</td><td>This is the suppliers item code

</td></tr><tr><td>**Supplier Discount**</td><td>Shows if you received a discount on this item when purchased form supplier

</td></tr><tr><td>**Last Updated**</td><td>This is the date the cost was last updated for this item

</td></tr><tr><td>**Latest Cost**</td><td> Similar to Item cost, this shows the actual cost of the item at that date

</td></tr></tbody></table>

**Internal Notes**

<table border="1" id="bkmrk-internal-note-use-th" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; width: 101.071%;"><colgroup><col style="width: 18.4528%;"></col><col style="width: 81.5415%;"></col></colgroup><tbody><tr><td>**Internal Note**</td><td><div>Use this field to add **private comments or internal details** related to the job, quote, or project.  
These notes are **for internal use only** and are **not visible to the customer**, making it ideal for internal communication and instructions.</div></td></tr></tbody></table>

---

#### **Approve Quote to Job**

Quotes must go through approval stages to ensure they are reviewed internally and accepted by the customer before being converted into a job.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/4vMimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/4vMimage.png)

**Internal Approval**

This stage is for internal review and sign-off.  
It ensures pricing, margins, and job details are checked and approved within the business before sending to the customer.

<div id="bkmrk-customer-approval">**Customer Approval**</div>Once internally approved, the quote is provided to the customer for acceptance.  
This confirms the customer agrees to the scope, pricing, and terms.

<div id="bkmrk-approve-to-job">**Approve to Job**</div>After customer approval, selecting **“Approve to Job”** converts the quote into an active job.  
The job is then available in **Manage Job** and becomes part of the live workload.


##### Approved to job

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/Cecimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/Cecimage.png)

<table border="1" id="bkmrk-quote-number-this-is" style="width: 100%;"><colgroup><col style="width: 4.17219%;"></col><col style="width: 13.5829%;"></col><col style="width: 82.2581%;"></col></colgroup><tbody><tr><td>1</td><td>**Quote Number**</td><td>This is the Quote number linked</td></tr><tr><td>2</td><td>**Customer**</td><td>Customers Name</td></tr><tr><td>3</td><td>**Description**</td><td>This will be specific to the Job as an easy identifier in a list</td></tr><tr><td>4</td><td>**Long Description**</td><td>Here you can be more specific to the job</td></tr><tr><td>5</td><td>**Quote Date**</td><td>This is the date of the Quote </td></tr><tr><td>6</td><td>**Branch** </td><td>You can select a specific branch that this is linked to if you had these set up at the start</td></tr><tr><td>7</td><td>**Order Number**</td><td>Customer Order Number</td></tr><tr><td>8</td><td>**Team** </td><td>You can select a team if these have been setup</td></tr><tr><td>9</td><td>**Employee**</td><td>Refers to the specific person responsible for completing a task or project. It helps track accountability, scheduling, and communication.</td></tr><tr><td>10</td><td>**Department**</td><td>Add a department if this has been setup for your company </td></tr><tr><td>11</td><td>**Function** </td><td>  
</td></tr><tr><td>12</td><td>**Est Start Date**</td><td>Date estimated for Job to start</td></tr><tr><td>13</td><td>**Group Activity** </td><td>  
</td></tr><tr><td>14</td><td>**Completion Date**</td><td>Date Estimated for Job to be completed</td></tr><tr><td>15</td><td>**Delivery Date**  
</td><td>Date that the item is expected to be delivered to your customer</td></tr><tr><td>16</td><td>**Create PO Drop Ship**</td><td>This is to allow you to create a PO from the Job once its started.</td></tr><tr><td>17</td><td>**Allow to Exceed Quote Value**</td><td>Ticking this box allows actual job costs to exceed the quoted value. This is helpful when unexpected expenses arise during production or service delivery, and you want the system to continue tracking costs without treating the quote as a strict limit. If left unticked, a new quote must be created to include any additional costs.</td></tr><tr><td>18</td><td>**Allow to Exceed Budget Qty**</td><td>Ticking this box allows the actual quantity used in the job to exceed the budgeted amount. This is useful when additional units are required during production or service delivery. If left unticked, you’ll need to produce a new quote to add more units.</td></tr><tr><td>19</td><td>**Activate Report Dates**</td><td>This will allow you to be able to report on this job</td></tr><tr><td>20</td><td>**Use Build Task Defaults**</td><td>When you create a build task default, you can specify alternative warehouses or item sources. Once a quote is converted into a job, the system will apply the defaults set in your build template. This ensures that materials are drawn from the designated warehouse rather than the main warehouse, allowing for more precise inventory control—especially when working with a master warehouse setup.

</td></tr><tr><td>21</td><td>**Charge Up (SC)**</td><td>**Charge Up (SC)** means the customer is billed for actual time and materials used, including any extras beyond the initial scope. Charge Up allows you to invoice for additional costs incurred during the job.  
</td></tr><tr><td>22</td><td>**Prepaid (CTC)**</td><td>**Prepaid** refers to the quoted amount for the job, the fixed charge agreed to by the customer. You can’t invoice beyond this amount, so any extra time, materials, or costs that exceed the quote become your internal expense, or ‘**Cost to Company (CTC)**

</td></tr><tr><td>23</td><td>**Warehouse**</td><td>All stock will come from the Warehouse selected here </td></tr><tr><td>24</td><td>**Job Link**</td><td>You may find that you already have a job for this customer, and this is a sub job, to can select this job form the drop-down menu link to two or more jobs.</td></tr><tr><td>25</td><td>**Assembly**</td><td>“**Assembly**” refers to an internal process where components or materials are prepared, combined, or staged before installation or delivery. It’s not billed separately to the customer but contributes to your overall job cost.</td></tr><tr><td>26</td><td>**Lock Employee**</td><td>You can lock the employee assigned to this job so it cannot be changed without your knowledge.</td></tr></tbody></table>

####   

# Quote Statuses

<span style="color: rgb(45, 194, 107);">**Job Costing &gt; Activity &gt; Job New Quote Search**</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/6Hhimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/6Hhimage.png)

##### Preparation

This is the stage where a quote has been created.  
*Path:*

##### All

Displays quotes across all status stages. It is not recommended to search using this status.

##### Scope Creep Quote

This applies when a quote is created from a job using the **Scope Creep Quote** function. The quote is considered to be in the preparation stage and must progress through all approval stages.

##### Requesting Internal Approval

This status indicates the quote has moved from **Preparation** to **Internal Approval**.  
*Path: Job Costing &gt; Activity &gt; Job Internal Quote Approval*

##### Internal Approval

This is the stage where the quote is undergoing internal review and approval.

##### Job Customer Quote Approval

This status means the quote has progressed from **Preparation** or **Internal Approval** to **Customer Approval**.  
*Path: Job Costing &gt; Activity &gt; Job Customer Quote Approval*

##### Customer Approved

This status indicates the quote has been approved (from Preparation, Internal Approval, or Customer Approval) and converted into an active job. The job is now available under **Manage Job**, essentially forming part of the order book.  
*Path: Job Costing &gt; Activity &gt; Manage Job*

##### Internal Rejection

This occurs when a quote is rejected during the **Internal Approval** stage.

##### Customer Rejection

This occurs when a quote is rejected during the **Customer Approval** stage.

<div id="bkmrk-cancelled">Cancelled</div>This status applies when a quote is cancelled at any stage of the quote process.

# Quote - Exclude from Reports

This flag will assist when running reports on quote values, allowing us to exclude certain quotes (effectively treating them as zero).

This will work in conjunction with the **Prepriced** tick box.

**Rules:**

<div id="bkmrk-quote-created-from-a">1. **Quote created from a job (Prepriced already ticked):**
    
    
    - If a quote is created from a job where the Prepriced tick is already selected, then the **“Exclude from Reports”** tick should automatically be applied.
2. **Quote (.1) created from a job (Prepriced added later):**
    
    
    - If a quote is created from a job and the user selects the Prepriced tick (when it was not previously selected), then the **“Exclude from Reports”** tick should also be applied.
3. **New standalone quote:**
    
    
    - If a new quote is created (not from a job) and the user selects Prepriced, **no action is required** — do not apply the **“Exclude from Reports”** tick.

</div><span class="ts0"> </span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/WbWimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/WbWimage.png)

# Job Costing Quote Detail Report

<span class="ts0">**<span style="color: rgb(45, 194, 107);">Job Costing &gt; Reports&gt; Job Quote Detail Report</span>**</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/UKnimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/UKnimage.png)

- <span class="ts0"> Double click to open report</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/nriimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/nriimage.png)

##### Statuses

<table border="1" id="bkmrk-preparation%C2%A0-this-is" style="border-collapse: collapse; width: 100%;"><colgroup><col style="width: 17.9242%;"></col><col style="width: 81.9719%;"></col></colgroup><tbody><tr><td>**Preparation**

</td><td>This is the stage where a quote has been created.</td></tr><tr><td>**Scope Creep Quote**

</td><td>This applies when a quote is created from a job using the **Scope Creep Quote** function. The quote is considered to be in the preparation stage and must progress through all approval stages.</td></tr><tr><td>**All**

</td><td>Displays quotes across all status stages. It is not recommended to search using this status</td></tr><tr><td>**Requesting Internal Approval**

</td><td>This status indicates the quote has moved from **Preparation** to **Internal Approval**.  
*Path: Job Costing &gt; Activity &gt; Job Internal Quote Approval*</td></tr><tr><td>**Internal Approval**

</td><td>This is the stage where the quote is undergoing internal review and approval.</td></tr><tr><td>**Job Customer Quote Approval**

</td><td>This status means the quote has progressed from **Preparation** or **Internal Approval** to **Customer Approval**.  
*Path: Job Costing &gt; Activity &gt; Job Customer Quote Approval*</td></tr><tr><td>**Customer Approved**

</td><td>This status indicates the quote has been approved (from Preparation, Internal Approval, or Customer Approval) and converted into an active job. The job is now available under **Manage Job**, essentially forming part of the order book.

*Path: Job Costing &gt; Activity &gt; Manage Job*

</td></tr><tr><td>**Internal Rejection**

</td><td>This occurs when a quote is rejected during the **Internal Approval** stage.</td></tr><tr><td>**Customer Rejection**

</td><td>This occurs when a quote is rejected during the **Customer Approval** stage.</td></tr><tr><td>**Cancelled**

</td><td>This status applies when a quote is cancelled at any stage of the quote process.</td></tr></tbody></table>

# Manage Job

# Managing a Job

#### **Job Management**

**<span style="color: rgb(45, 194, 107);">Job Costing &gt; Activity &gt; Manage Job</span>**

- <span style="color: rgb(0, 0, 0);">Type in your Job number   
    Click **Search** </span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/l3Bimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/l3Bimage.png)

Each job line consists of multiple columns, with each column providing specific details about the job.

<p class="callout info">You can rearrange the columns in the order that the information is most relevant to you by simply dragging and dropping them into your preferred order as shown below.</p>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/Yqcimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/Yqcimage.png)

<table border="1" id="bkmrk-to-invoice-you-can-c" style="border-collapse: collapse; width: 100%; height: 661.25px;"><colgroup><col style="width: 14.8986%;"></col><col style="width: 85.0905%;"></col></colgroup><tbody><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**To Invoice**</td><td style="height: 29.7017px;">You can click on the dot to change the icon to a thumbs up to send this line for invoicing</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Notes**</td><td style="height: 29.7017px;"><span style="color: rgb(0, 0, 0);">You can add notes for internal records.</span></td></tr><tr style="height: 46.5057px;"><td style="height: 46.5057px;">**Line Type**</td><td style="height: 46.5057px;">This refers to where the line came from, the example above is from a Quote but can come from a CTC (Cost to Company) or a SC (Scope Creep)</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Required Date**</td><td style="height: 29.7017px;">This is the date the Job is to be completed by</td></tr><tr style="height: 46.5057px;"><td style="height: 46.5057px;">**Job Item Progress**</td><td style="height: 46.5057px;">This is used for Production Tracking</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**QT No.**</td><td style="height: 29.7017px;">This is the Quote number the line was added from</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**B-Status**</td><td style="height: 29.7017px;">This will show a different icon to show whether the Job has been started, in progress or completed</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Due**</td><td style="height: 29.7017px;">Will show you how many days are given to complete Job</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Days Required**</td><td style="height: 29.7017px;">This will show you have may days is needed to complete this Job Line Item</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Item Status**</td><td style="height: 29.7017px;">This will show if the line is a Stock, Service or Custom Item using Icons</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Related To**</td><td style="height: 29.7017px;">This will show if the line is a Stock, Service or Custom Item</td></tr><tr style="height: 46.5057px;"><td style="height: 46.5057px;">**On Hand Qty**</td><td style="height: 46.5057px;">This will show you how many of the specific item you have on hand to do the job, it will highlight if you do not have enough stock to complete the job</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Budget Qty**</td><td style="height: 29.7017px;">This shows you what you had initially quoted </td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Actual** </td><td style="height: 29.7017px;">This Quantity indicates the quantity used for the job</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Balance**</td><td style="height: 29.7017px;">This is the Quantity that is left over from the Budget Quantity </td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Exceeded**</td><td style="height: 29.7017px;">This will show you the quantity you have exceeded over the Budget Quantity </td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Est Qty**</td><td style="height: 29.7017px;">This is usually the same as tour Budget Qty</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Delivered Qty**</td><td style="height: 29.7017px;">This is how many of this line item has been completed and actually dispatched to the customer</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Line Status**</td><td style="height: 29.7017px;">This speaks to the Job Item Status and B-Status which shows job progress</td></tr><tr style="height: 46.5057px;"><td style="height: 46.5057px;">**Job Line Description**</td><td style="height: 46.5057px;">This is the description form the quote detailing what the line item is</td></tr></tbody></table>



##### **Manage Job by Line**








Managing one line at a time within a workflow keeps you in control by ensuring each task is handled deliberately and accurately. This method reduces errors, simplifies troubleshooting, and creates a clear audit trail. It’s the recommended approach for maintaining consistency, accountability, and professional standards across every job.

- **Double click** on a job line
- Update your usage amount for this item

As shown below the main things you will be looking at is the following

<table border="1" id="bkmrk-available-stock-qty-" style="border-collapse: collapse; width: 100%;"><colgroup><col style="width: 16.2063%;"></col><col style="width: 83.7828%;"></col></colgroup><tbody><tr><td>Available Stock Qty</td><td>Shows you all available stock</td></tr><tr><td>Budget Qty</td><td>This is what was Quoted</td></tr><tr><td>Actual Qty</td><td>This is how many have been used</td></tr><tr><td>Balance Qty</td><td>This is how many you have left to use from your Quote amount</td></tr><tr><td>Usage</td><td>This is an open field where you will put in the quantity being used</td></tr></tbody></table>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/S8iimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/S8iimage.png)

- Click **Save and Close**

You can now see that the line is active, and you’ll notice updated **quantities** and **statuses** reflecting the latest changes.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/DPBimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/DPBimage.png)

If you've made an error and need to adjust the quantity, simply double-click the Job Line again. To decrease the quantity, enter a minus sign (–) in front of the amount you're reducing, as shown below.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/pAuimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/pAuimage.png)

---

##### **UnManage Line/All**

<div id="bkmrk-unmanage-all-will-re">**Unmanage All** will reverse managed quantities, less any quantities that have already been invoiced.</div><div id="bkmrk-if-a-line-has-been-i">If a line has been invoiced, it cannot be unmanaged, as it has already been processed out of the system.</div><div id="bkmrk-to-remove-job-lines-">To remove job lines from a job, use all three of the actions listed below.</div><div id="bkmrk--1"></div><div id="bkmrk-a-unmanage-all-items"><table border="1" id="bkmrk-a-unmanage-all-items-1" style="border-collapse: collapse; width: 100%;"><colgroup><col style="width: 16.4622%;"></col><col style="width: 83.5378%;"></col></colgroup><tbody><tr><td class="align-center">A</td><td>Unmanage All items on a job</td></tr><tr><td class="align-center">B</td><td>Clear Line History

Only works if the Managed Actual quantity equals zero

</td></tr><tr><td class="align-center">C</td><td>Delete Job Line

Only works if there are no Line History entries

</td></tr></tbody></table>

</div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-04/scaled-1680-/j75image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-04/j75image.png)

- Actions can be applied to either a selected line or all lines in the grid.
- “All lines in grid” will operate based on the currently filtered data.
- If a line cannot be processed, it will be skipped and the system will continue with the next line.

---

**<span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em;">Adding a New Line to a Job</span>**

To add a new item to a job, you have three options:

1. **Scope Creep** – This can be added manually and will be charged to the customer. It’s recorded as a cost to company and included in the overall job cost.
2. **Cost to Company** – Also added manually, this option absorbs the cost internally without charging the customer. It’s useful for goodwill gestures or internal adjustments.
3. **Quote** – If the customer has accepted a quote for the additional work, it follows the same process as the initial quote but is linked to the existing job rather than creating a new one.

See below where you will find these options.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/WLUimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/WLUimage.png)

The screen to add **Scope Creep** or **Cost to Company** looks the same and essentially works the same.

- Click on **Scope Creep** or **Cost to Company**

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/Q6mimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/Q6mimage.png)

- Select your **Item** from the dropdown menu
- Add your **Quantity**
- Click **Save &amp; Close**

  
[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/PBEimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/PBEimage.png)

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/757image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/757image.png)

To add a new line to the job from Quote:

- Click on **Quote**

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/5m2image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/5m2image.png)

Creating a quote from within a Job similarly to starting one via **Job Costing &gt; Activity &gt; Quote** in the main menu. However, because it originates from a job, it will automatically be linked to that job. This connection is visible in the **Extras** tab.

Quotes created this way will also include a **“.1” suffix** after the original quote number, this indicates that the quote is an **extension or variation** of the original, tied directly to the job.

If you create a quote from the main menu instead, it will generate a **new quote number**. You can still manually link it to a job by entering the job number, but creating it from within the job acts as a convenient shortcut.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/oYdimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/oYdimage.png)

Once customer approval is received and the quote is approved to the job, the corresponding line will be added to the job record. The quote number will appear with a **“.1” suffix** appended to the original quote number, this provides a quick visual cue that the item represents **additional work** beyond the original quote.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/tXeimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/tXeimage.png)

##### **Viewing the Quotes on a Job**

To view all quotes on a job clock on the "**Sales Docs**" tab. Here you will see any outstanding quote as well as quotes that have been approved.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/99Oimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/99Oimage.png)

##### **Move Job to Invoice**

Once the job is fully completed and all line items have been managed, you can click the “Thumbs Up” icon at the top tabs, labeled “Ready to Invoice.”

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/aokimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/aokimage.png)

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/Stjimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/Stjimage.png)

# Job Search Screen Explained

#### **Job Search Screen**

Searching for Jobs -<span style="color: rgb(22, 145, 121);"> <span style="color: rgb(45, 194, 107);">**Job Costing &gt; Activity &gt; Manage Job**</span></span>

<div id="bkmrk-this-screen-is-used-">This screen is used to find and review jobs within the Job Costing Module. It includes a variety of filters at the top that allow users to quickly search for jobs using whatever information they have available. These filters provide flexibility, enabling users to perform broad searches with minimal details (such as a name or date) or narrow searches using specific criteria.</div>This area only searches for Jobs with a Job status of

- Not Started
- Started
- In Progressing

##### **Search Button**

![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/32Qimage.png)

The **Search** button is used to run the search once you have entered your desired criteria.

After selecting or entering the relevant filters (such as job number, customer, date range, or status), clicking **Search** will display all jobs that match those criteria in the results grid below.

**Basic Search Tab**

![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/LReimage.png)

<table border="1" id="bkmrk-job-number-if-you-kn" style="border-collapse: collapse; width: 100%;"><colgroup><col style="width: 21.815%;"></col><col style="width: 78.2003%;"></col></colgroup><tbody><tr><td>**Job Number**</td><td><div>If you know the exact job reference</div></td></tr><tr><td><div>**Customer From / To**</div></td><td><div>Filter jobs for a specific customer or range of customers</div></td></tr><tr><td>**Quote Number**</td><td><div>Locate jobs linked to a specific quote</div></td></tr><tr><td><div>**Order Number**</div></td><td><div>Search using the related order reference</div></td></tr><tr><td><div>**Short Description**</div></td><td><div>Search by keywords describing the job</div></td></tr><tr><td><div>**Date Type**</div></td><td><div>Choose which date you want to filter by (e.g., Start Date)</div></td></tr><tr><td><div>**Date From / Date To**</div></td><td><div>Define a date range to refine results</div></td></tr><tr><td><div>**Job Status**</div></td><td><div>Filter by status (e.g., All, Active, Completed)</div></td></tr></tbody></table>

#####  

##### **Job Search Grid Columns Explained**


<span style="color: rgb(45, 194, 107);">**Job Costing &gt; Activity &gt; Manage Job**</span>

- Click **Search**

The Job Search screen displays results in a grid format. Each row represents a job record, and the columns provide key information about that job.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/saRimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/saRimage.png)

The grid is **customisable**, allowing users to choose which columns are visible based on their needs.

Customise columns in the grid:

<div id="bkmrk-hover-your-mouse-ove">- Hover your mouse over any **column header** in the grid
- A **downward arrow** will appear on the right-hand side of the header
- Click on this arrow to open a menu
- Select **“Columns”** from the list
- A full list of available column options will then be displayed
- Tick will show a column or untick to hide it

</div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/wspimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/wspimage.png)

**Reordering Columns**

<div id="bkmrk-columns-can-also-be-">- Columns can also be rearranged to suit your preferred layout
- Simply **click and hold a column header**, then **drag and drop it** into the desired position
- This allows you to organise the grid in a way that best fits your workflow

</div><table border="1" id="bkmrk-status-displays-the-" style="border-collapse: collapse; width: 100%; height: 1062.29px;"><colgroup><col style="width: 21.0195%;"></col><col style="width: 78.8766%;"></col></colgroup><tbody><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Status**</div></td><td style="height: 29.7017px;"><div>Displays the current status of the job</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Delivery Address 1 / 2**</div></td><td style="height: 29.7017px;"><div>Shows the delivery location details</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Asset**</div></td><td style="height: 29.7017px;"><div>Links the job to a specific asset, if applicable</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Division**</div></td><td style="height: 29.7017px;"><div>Indicates the business division associated with the job</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Reopened**</div></td><td style="height: 29.7017px;"><div>Identifies jobs that have been reopened after completion</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Assembly**</div></td><td style="height: 29.7017px;"><div>Indicates if the job involves assembly components</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Job Link**</div></td><td style="height: 29.7017px;"><div>Provides a reference or link to related jobs</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Payment / Retention**</div></td><td style="height: 29.7017px;"><div>Displays payment or retention-related information</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Estimated Start Date**</div></td><td style="height: 29.7017px;"><div>Planned start date for the job</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Invoice Group**</div></td><td style="height: 29.7017px;"><div>Groups jobs for invoicing purposes</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Charge Up**</div></td><td style="height: 29.7017px;"><div>Indicates whether the job is chargeable</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Project**</div></td><td style="height: 29.7017px;"><div>Links the job to a broader project</div></td></tr><tr style="height: 35.625px;"><td style="height: 35.625px;"><div>**Prepriced**</div></td><td style="height: 35.625px;"><div>Shows if pricing has been predefined</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**BOM / BOM Item**</div></td><td style="height: 29.7017px;"><div>Displays Bill of Materials and related items</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Activity Group**</div></td><td style="height: 29.7017px;"><div>Categorises the job under a specific activity</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Internal Job**</div></td><td style="height: 29.7017px;"><div>Flags jobs that are internal (non-customer facing)</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Job Manager**</div></td><td style="height: 29.7017px;"><div>Shows the person responsible for the job</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Comment**</div></td><td style="height: 29.7017px;"><div>Allows for additional notes or remarks</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Budget Selling**</div></td><td style="height: 29.7017px;"><div>Budgeted revenue for the job</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Actual Selling**</div></td><td style="height: 29.7017px;"><div>Actual revenue recorded</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Variance**</div></td><td style="height: 29.7017px;"><div>Difference between budget and actual values</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Invoiced Selling**</div></td><td style="height: 29.7017px;"><div>Amount that has been invoiced</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Memo**</div></td><td style="height: 29.7017px;"><div>Additional internal notes or messages</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Att (Attachments)**</div></td><td style="height: 29.7017px;"><div>Indicates if documents or files are attached to the job</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Due**</div></td><td style="height: 29.7017px;"><div>Displays due dates or overdue indicators</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Job Status**</div></td><td style="height: 29.7017px;"><div>Current status of the job (e.g. in progress, completed)</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Team**</div></td><td style="height: 29.7017px;"><div>The team assigned to the job</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Info**</div></td><td style="height: 29.7017px;"><div>Additional job-related information or quick access details</div></td></tr><tr style="height: 46.5057px;"><td style="height: 46.5057px;"><div>**WIP O/S (Work in Progress Outstanding)**</div></td><td style="height: 46.5057px;">Value of work still in progress</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**% Completed**</td><td style="height: 29.7017px;"><div>Progress percentage of the job</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Completion Date**</div></td><td style="height: 29.7017px;"><div>Date the job was completed</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Delivery Date**</div></td><td style="height: 29.7017px;"><div>Scheduled or actual delivery date</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Region**</div></td><td style="height: 29.7017px;"><div>Geographic area linked to the job</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Start Date**</div></td><td style="height: 29.7017px;"><div>When the job began</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Approved Date**</div></td><td style="height: 29.7017px;"><div>Date the job was approved</div></td></tr></tbody></table>

#####  

##### **Expanded Search Fields**

<div id="bkmrk-when-the-expand-%28con">When the **Expand (Contract)** option is selected, additional search filters become available. These provide more advanced ways to refine your search results.</div>![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/5ksimage.png)

![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/3Ypimage.png)

<table border="1" id="bkmrk-status-%2F-position-fi" style="border-collapse: collapse; width: 100%; height: 464.966px;"><tbody><tr style="height: 46.6667px;"><td style="height: 46.6667px;"><div>**Status / Position**</div></td><td style="height: 46.6667px;"><div>Filter jobs based on their current status or stage within the workflow</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><div>**Division**</div></td><td style="height: 29.8785px;"><div>Search for jobs linked to a specific business division</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><div>**Region**</div></td><td style="height: 29.8785px;"><div>Narrow results by geographic location or branch</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><div>**Project**</div></td><td style="height: 29.8785px;">Locate jobs associated with a particular project</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><div>**Payment / Retention**</div></td><td style="height: 29.8785px;"><div>Filter based on payment terms or retention details</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><div>**Reference**</div></td><td style="height: 29.8785px;"><div>Search using any external or internal reference number</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><div>**Asset Item**</div></td><td style="height: 29.8785px;"><div>Find jobs linked to a specific asset or item</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><div>**Order By**</div></td><td style="height: 29.8785px;"><div>Sort the results based on selected criteria (e.g., date, job number)</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><div>**Assembly**</div></td><td style="height: 29.8785px;"><div>Filter jobs related to specific assemblies or grouped components</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><div>**Charge Up**</div></td><td style="height: 29.8785px;"><div>Identify jobs based on charge-up rules or settings</div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><div><div>**Prepriced**</div></div></td><td style="height: 29.8785px;"><div><div>Filter jobs that have predefined pricing applied</div></div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><div><div>**Job Manager**</div></div></td><td style="height: 29.8785px;"><div><div>Search for jobs assigned to a specific manager</div></div></td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;"><div><div>**Invoice Group (Inv Group)**</div></div></td><td style="height: 29.8785px;"><div><div>Locate jobs grouped for invoicing purposes</div></div></td></tr></tbody></table>

These additional filters are especially useful when:

<div id="bkmrk-working-with-large-v">- Working with **large volumes of jobs**
- Needing to **pinpoint very specific records**
- Performing **reporting or detailed analysis**

</div>They allow users to move beyond basic searches and **fine-tune results with greater accuracy and control**.

---

##### **Manage Job Button**

![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/MrRimage.png)

The **Manage Job** button (highlighted in the toolbar at the top) is used to **open a selected job into the full job management screen**.

<div id="bkmrk-to-use-this-button%3A-">- To use this button:
    
    
    1. Highlight a job line from the results grid below
    2. Click **Manage Job**
- This will open the **Manage Job screen**, where you can:
    
    
    - View full job details
    - Update job information
    - Manage tasks, timelines, and progress
    - Access related documents and financials

</div>---



#####  

##### **Views Button**

The **Views** button allows users to change how the job information is displayed after running a search. Instead of only viewing jobs in a standard list, users can choose different layouts depending on their needs.

![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/DOsimage.png)

<div id="bkmrk-overview-options">- **Overview Option**

</div>This screen allows you to control how the Job Workflow overview is displayed, helping you plan and track jobs over a selected time period.

<div id="bkmrk-click-the-search-but">Click the **Search button (magnifying glass icon)** at the top of the screen to open the search fields.</div>![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/9THimage.png)

This screen allows you to control how the **Job Workflow overview** is displayed, helping you plan and track jobs over a selected time period.

<table border="1" id="bkmrk-view-the-first-view-" style="border-collapse: collapse; width: 100%; height: 298.785px;"><tbody><tr style="height: 29.8785px;"><td style="height: 29.8785px;">**View**

</td><td style="height: 29.8785px;">The first **View** dropdown lets you choose which date the workflow is based on:

**- Estimated Start Date - Completion Date - Delivery Date**

This determines how jobs are positioned and displayed in the workflow timeline.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">**Column Width**

</td><td style="height: 29.8785px;">\- This setting controls the **width of the columns** in the workflow display.  
\- Increasing the value makes columns wider, while decreasing it makes them narrower.

Useful for adjusting the layout to fit your screen or improve readability.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">**Date Range (Date From / Date To)**

</td><td style="height: 29.8785px;">- Defines the **overall date range** of jobs to include in the workflow.  
- Only jobs within this selected period will be displayed.</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">**Debtor Filter**

</td><td style="height: 29.8785px;">\- Used to filter jobs for a **specific customer (debtor)**.  
\- If left **blank**, the system will display **all jobs**.  
\- If a customer has multiple jobs, you can select them here to narrow down the results.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">**View (Duration)**

</td><td style="height: 29.8785px;">The second **View** option controls how far ahead you can plan:

\- You can display the workflow for up to **12 weeks in advance**

This helps with forward planning and scheduling.

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">**Start Date**

</td><td style="height: 29.8785px;">\- Defines the **starting point of the workflow view**

\- This is typically set to **today’s date**, but can be adjusted if needed

</td></tr><tr style="height: 29.8785px;"><td style="height: 29.8785px;">**Action Buttons**

</td><td style="height: 29.8785px;">**- Search** – Applies the selected filters and displays the workflow

**- Close** – Exits the screen

**- Clear** – Resets all fields

</td></tr></tbody></table>

Once you have applied your desired filters and clicked **Search**, the results screen will appear as shown below.

This screen displays the results of your search in a **workflow (timeline) view**, organised by date.

Each column represents a specific date, and the jobs returned from your search criteria are displayed under their scheduled or estimated start dates.

![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/Kujimage.png)

**Key Features:**

**Job Display** – Each job appears as a card showing key details such as:

\- Job name or description  
\- Job number  
\- Status indicators (icons and colours)  
\- Start and completion dates  
\- Assigned team

**Date-Based Layout** – Jobs are arranged in columns by date, making it easy to see what work is scheduled on each day.

**Drag-and-Drop Functionality** – Users can click and drag jobs from one date column to another to reschedule or reorganise the workflow.

**Visual Status Indicators** – Colours and icons provide a quick view of job progress, delays, or completion status.

- **Calendar Option**

The **Calendar View** displays jobs in a familiar calendar layout, making it easy to see when work is scheduled across specific days.

<div id="bkmrk-key-features%3A-1">**Key Features:**</div><div id="bkmrk-jobs-are-displayed-o">Jobs are displayed on the calendar by their selected date (e.g., Start Date), so you can quickly see what is planned and when.</div><div id="bkmrk-view-options-%E2%80%93-you-c">**View Options** – You can switch between:</div>**- Day** – View jobs scheduled for a single day  
**- Week** – See jobs across a full week  
**- Month** – Get an overview of jobs across the entire month

<div id="bkmrk-navigation-%E2%80%93-use-the">**Navigation** – Use the arrows or date selector to move between different days, weeks, or months.</div><div id="bkmrk-drag-and-drop-functi-1">**Drag-and-Drop Functionality** – Jobs can be easily dragged from one date to another to reschedule them.</div><div id="bkmrk-visual-indicators-%E2%80%93-">**Visual Indicators** – Jobs are shown as coloured blocks, helping you quickly identify and differentiate between them.</div><div id="bkmrk--15">  
</div>![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/sR4image.png)

- **Gantt Chart View**

The **Gantt Chart View** provides a detailed timeline of all jobs, allowing users to visually track progress, duration, and scheduling across a timeline.

![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/YmWimage.png)

**- Timeline Display** – Each job is represented as a horizontal bar stretched across the dates it is scheduled for, making it easy to see how long a job will take and when it is due.

**- Job Details Panel** – On the left-hand side, key information is displayed in columns, including:

Job Name  
Job Number  
Estimated Start Date  
Customer Name  
Description

**- Date Grid (Right Side)** – The timeline on the right shows days and weeks, with job bars positioned according to their scheduled start and end dates.

**- Visual Progress Tracking** – The length and position of each bar clearly indicate:

Job duration  
Overlaps with other jobs  
Gaps in scheduling

**- Drag-and-Drop Functionality** – Jobs can be moved along the timeline to adjust scheduling, allowing users to easily reschedule or reorganise workloads.

**- Zoom Option** – The zoom control allows users to adjust how much detail is displayed in the timeline (e.g., viewing a shorter or longer time period).

---



#####  

##### **Start Job Button**

The **Start Job** button allows you to manually start a job.

![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/Jwtimage.png)

<div id="bkmrk-in-most-cases%2C-a-job">- In most cases, a job will **start automatically** as soon as a job line is managed or worked on.
- However, there may be situations where you want to **start the job before managing any lines**.

</div>In this case, you can simply:

<div id="bkmrk-select-the-job-from-">1. Select the job from the list
2. Click the **Start Job** button

</div>This will activate the job without needing to work on any job lines first.

---



#####  

##### **New Job Button**

The **New Job** button is used to create a job directly, without first creating or promoting a quote.

![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/ZAOimage.png)

When this option is selected, a new job is started “on the fly,” allowing users to quickly set up and begin working on a job straight away.

<div id="bkmrk-direct-job-creation-">- **Direct Job Creation** – Create a job immediately without needing an existing quote
- **Automatic Background Process** – The system will automatically create a blank quote in the background
- **Linked Records** – This quote is linked to the job and can be accessed later under the **Quotes** section
- **Flexible Workflow** – Ideal for situations where work needs to begin quickly without following the full quote-to-job process

</div>---



#####  

##### **Create Reminder Button**

The **Create Reminder** button allows you to set a reminder for a selected job.

![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/V80image.png)

To use this feature:

<div id="bkmrk-select-a-job-from-th">1. 1. Select a job from the list
    2. Click **Create Reminder**
    3. Enter the reminder details (e.g., date, time, and notes)

</div>This is useful for setting follow-ups, deadlines, or any important actions related to a job.

---



#####  

##### **Ready for Invoice**

The **Ready for Invoice** button is used to mark a job as ready to be invoiced.

When selected, it simply adds a **thumbs-up icon** to the job in the results grid, providing a clear visual indicator that the job is complete and ready for billing.

![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/QfDimage.png)

<div id="bkmrk-visual-indicator-%E2%80%93-a">- **Visual Indicator** – Adds a thumbs-up icon to the job line
- **Quick Status Update** – Clearly shows that the job is ready to be invoiced
- **No Complex Process** – This is a simple flag and does not generate an invoice automatically
- **Easy Tracking** – Helps users quickly identify which jobs are ready for the invoicing stage

</div>---



#####  

##### **Functions Button**

The **Functions** tab provides access to a range of additional actions that can be performed on a selected job. These are typically used for maintenance, updates, or managing specific job settings.

![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/pCpimage.png)

<table border="1" id="bkmrk-close-or-cancel-job-" style="border-collapse: collapse; width: 100%;"><tbody><tr><td>**Close or Cancel Job**</td><td><div>Allows you to close a completed job or cancel a job that is no longer required</div></td></tr><tr><td>**Job BOM**</td><td><div>Opens or manages the materials associated with the job</div></td></tr><tr><td>**Import Delivery / Completion Dates**</td><td><div>Used to update job delivery or completion dates in bulk</div></td></tr><tr><td>**Recalculate Job**

</td><td><div>Refreshes and recalculates job costs and related figures to ensure accuracy</div></td></tr><tr><td>**Update Percentage Complete**

</td><td><div>Updates the job’s progress bar percentage based on current activity</div></td></tr><tr><td>**Payment / Retention**</td><td><div>Manages payment details, including any retention amounts held or released</div></td></tr><tr><td>**Change Customer on Job**</td><td><div>Allows you to update or correct the customer linked to the job</div></td></tr></tbody></table>

<div id="bkmrk-open-the-gantt-chart"></div>

# Manage Job Line Edit and reassign

Double-click a **Job** to open it. Within the job, double-click a **job line** to edit or reassign it.

This is the main screen where a Job line is managed

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/osOimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/osOimage.png)

**Restrictions**

You cannot edit the line if:

<div id="bkmrk-the-line-is-locked-t">1. The line is **locked**
2. The item has been marked for **invoice or delivery note**

</div>You cannot change **cost or quantity** if the item is a:

<div id="bkmrk-stock-item-fixed-ass">- **Stock item**
- **Fixed asset**

</div>**Reassignment Rules (Sell Price)**

When reassigning to a new parent:

<div id="bkmrk-the-line-will-adopt-">- The line will adopt the **sell price of the new parent**
- If the item is a **stock category (SC) or quote line**, it will use its own **sell price**
- If the new parent is a **Cost to Company (CTC)** item, the **sell price will be removed** from the line

</div><span class="ts0"></span>

# Unmanage All Job Lines

The **“Unmanage All”** function will reverse any managed quantities on job lines, reducing them back to an unmanaged state based on what has not yet been invoiced.

<div id="bkmrk-any-quantities-alrea">- Any quantities already **invoiced cannot be unmanaged**, as they are finalised in the system
- Only **non-invoiced quantities** will be adjusted

</div>To fully remove or reset job lines, use the available actions provided below in combination.

<table border="1" id="bkmrk-a-unmanage-all-items"><colgroup><col></col><col></col></colgroup><tbody><tr><td class="align-center">**A**</td><td>UnManage All items on a job</td></tr><tr><td class="align-center">**B**</td><td>Clear Line History

Only works if the Managed Actual quantity equals zero

</td></tr><tr><td class="align-center">**C**</td><td>Delete Job Line

Only works if there are no Line History entries

</td></tr></tbody></table>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-04/scaled-1680-/j75image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-04/j75image.png)

Actions can be applied to either **selected lines** or **all lines within the grid**.

<div id="bkmrk-all-lines-in-grid-%E2%80%93-">- **All Lines in Grid** – This option will apply the action only to the lines currently visible, based on the applied filters
- If a line cannot be processed (e.g. due to system restrictions), it will be **skipped automatically**, and the action will continue on the remaining lines

</div>This ensures efficient processing without interruption when working with multiple job lines.

# Manage Job Functions Tab Explained  - Detailed

#### Functions Tab

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2024-07/scaled-1680-/bTrimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2024-07/bTrimage.png)

<table border="1" id="bkmrk-manage-all-%C2%A0-import-" style="border-collapse: collapse; width: 100%;"><colgroup><col style="width: 21.2964%;"></col><col style="width: 78.8272%;"></col></colgroup><tbody><tr><td>**Manage All**</td><td>The **Manage All** button is used to manage **all lines on the job at once**.

</td></tr><tr><td>**Import**</td><td>The **Import** button is used to **upload job lines from a file into the job**.

</td></tr><tr><td>**New Stock Request**</td><td>The **New Stock Request** button is used to create a **request for stock items required for a job**.

</td></tr><tr><td>**Create PO**</td><td>The **Create PO** screen is used to generate **purchase orders for items required on a job**.</td></tr><tr><td>**Create BOM**</td><td>The **Create BOM** screen is used to add a **Bill of Materials to a job**, bringing in a predefined set of items.

</td></tr><tr><td>**Verify task stock**</td><td>  
</td></tr><tr><td>**Task Stock Request**</td><td>  
</td></tr><tr><td>**Delete Task**</td><td>The **Delete Task** button is used to remove a **task from the job**.

</td></tr><tr><td>**Add to Picking Slip**</td><td>The **Add to Picking Slip** button is used to assign **selected job lines to a picking slip** for warehouse processing.

</td></tr><tr><td>**Planned Timelog**</td><td><div>Allows you to Generate a planned time logs for each **employee based** on the entries in the **Job Line tab**, allowing future work to be scheduled and tracked effectively.</div></td></tr><tr><td>**Copy to Job**</td><td>The **Copy to Job** button allows you to **copy selected job line(s) to another job**.

</td></tr><tr><td>**Clear Line History**</td><td>  
</td></tr><tr><td>**Delete Job Line**</td><td>  
</td></tr><tr><td>**Change Line Type**</td><td>  
</td></tr><tr><td>**CTC to SC**</td><td>  
</td></tr><tr><td>**Support Log**</td><td>  
</td></tr><tr><td>**Time Log**</td><td>  
</td></tr><tr><td>**Quick Time Log**</td><td>  
</td></tr><tr><td>**Checklist**</td><td>  
</td></tr><tr><td>**Complete**</td><td>  
</td></tr></tbody></table>










---

##### Manage All

The **Manage All** button is used to manage **all lines on the job at once**.

When selected, a confirmation window will appear asking if you want to proceed. You can also choose to **include wastage items**.

Click **Yes** to continue and apply actions to all job lines, or **No** to cancel.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/gsrimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/gsrimage.png)

---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">Import Button - Line Import</span>


The **Import** button is used to **upload job lines from a file into the job**.

This feature is ideal when importing a **recipe or BOM set up for a single unit**. The multiplier allows you to scale the quantities automatically during import, saving time and ensuring accuracy.

When selected, the Job Import screen will open where you can:

<div id="bkmrk-choose-a-file-to-imp">- Choose a file to import
- Set a **quantity multiplier** (if required)
- Click **Upload** to import the lines

</div>Only valid items will be imported, and any errors can be reviewed using **Show Errors**.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/sCCimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/sCCimage.png)

**File Upload &amp; Import Process**

<div id="bkmrk-click-the-select-fil">- Click the **Select File** button to open the file browser and locate the file you want to import.
- Click **Upload** to send the file to the server and start the import process.

</div>
**Quantity Multiplier Option**

<div id="bkmrk-you-have-the-option-">- You have the option to **multiply quantities during import**. This will adjust both the **budget quantity** and the **managed quantity**.
- The default value is **1**, but this can be changed **before uploading the file**.

</div>**Please Note**

<div id="bkmrk-the-file-must-be-in-">- The file must be in **.CSV format** using **semi-colon (;) separation**
- The file must include **headers**, however these will be ignored during import
- If any errors occur, they will be recorded in the **log**
    - Please correct the errors and restart the import process

</div><span class="ts0"> </span>**Import Rules**

<div id="bkmrk-the-csv-file-must-us">1. The **CSV file must use semi-colon (;) separation**
2. **Stock items** take cost from the item setup, regardless of any cost entered in the file
3. **Stock items** take the selling price from the Excel file
4. If the stock item selling price is blank, it defaults to the **item setup value**
5. **Custom and Service items** take both cost and selling price from Excel
6. If cost and selling are blank for Custom or Service items, values default to **item setup**
7. If a **Service item** uses time allocation and an employee rate is set, cost is taken from **user setup rates (1, 2, or 3)**
8. If cost is set to **zero (0)**, it will be imported as zero
9. If **Managed Qty** is blank, the line is added as **Not Started**
10. If **Managed Qty** has a value, the line is added as **Active**
11. If there is **no stock on hand**, the line will be added but **not managed**
12. If the **Required Date** is blank, the system uses the **current date**
13. Dates must be in the format: **YYYY-MM-DD** (e.g. 2020-04-05)
14. If the **Employee field** is blank, it will remain blank
15. The **Employee field** uses the **login ID**
16. If the **Rate field** is blank (with an employee), it remains blank
17. Set **Rate to 1, 2, or 3** to use the corresponding user setup rate
18. If both **Employee and Rate** are set for a Service item, cost is taken from the **user setup rate**
19. **Description** is imported from Excel
20. If Description is blank, it defaults from **item setup**
21. Set **Is Complete = 1** to mark the line as complete
22. For stock items, the correct **Warehouse Code** must be provided
23. **Drawing** is a free text field
24. **Comment** is a free text field

</div><span class="ts0"> </span>

<span class="ts0"> </span>**CSV File Template**

<div id="bkmrk-field-header-example"><table class="align-c tbl0"><tbody><tr class="row0"><td class="cell26">**<span class="ts11">Field Header</span>**

</td><td class="cell27">**<span class="ts11">Example</span>**

</td><td class="cell28">**<span class="ts11">Required or Not</span>**

</td></tr><tr class="row0"><td class="cell26"><span class="ts0">Type</span>

</td><td class="cell27"><span class="ts0">CTC or SC</span>

</td><td class="cell28"><span class="ts48">Required</span>

</td></tr><tr class="row0"><td class="cell26"><span class="ts0">ItemCode</span>

</td><td class="cell27"><span class="ts0">MGPEN001</span>

</td><td class="cell28"><span class="ts48">Required</span>

</td></tr><tr class="row0"><td class="cell29"><span class="ts0">Description</span>

</td><td class="cell30"><span class="ts0">Pen with Red and Yellow dots</span>

</td><td class="cell31"></td></tr><tr class="row0"><td class="cell29"><span class="ts0">Budgetqty</span>

</td><td class="cell30"><span class="ts0">5</span>

</td><td class="cell31"><span class="ts48">Required</span>

</td></tr><tr class="row0"><td class="cell29"><span class="ts0">Cost</span>

</td><td class="cell30"><span class="ts0">10</span>

</td><td class="cell31"></td></tr><tr class="row0"><td class="cell29"><span class="ts0">Selling</span>

</td><td class="cell30"><span class="ts0">20</span>

</td><td class="cell31"></td></tr><tr class="row0"><td class="cell26"><span class="ts0">WarehouseCode</span>

</td><td class="cell27"><span class="ts0">MAST</span>

</td><td class="cell28"><span class="ts48">Required </span><span class="ts0">if a stock item</span>

</td></tr><tr class="row0"><td class="cell32"><span class="ts0">LineRef</span>

</td><td class="cell33"><span class="ts0">Line Reference</span>

</td><td class="cell34"><span class="ts0"> </span>

</td></tr><tr class="row0"><td class="cell29"><span class="ts0">Required Date</span>

</td><td class="cell30"><span class="ts0">2020-04-06</span>

</td><td class="cell31"></td></tr><tr class="row0"><td class="cell29"><span class="ts0">Employee Login</span>

</td><td class="cell30"><span class="ts0">Malcolm</span>

</td><td class="cell31"></td></tr><tr class="row0"><td class="cell26"><span class="ts0">Rate</span>

</td><td class="cell27"><span class="ts0">1 or 2 or 3</span>

</td><td class="cell28"><span class="ts0"> </span>

</td></tr><tr class="row0"><td class="cell29"><span class="ts0">Is Complete</span>

</td><td class="cell30"><span class="ts0">1</span>

</td><td class="cell31"></td></tr><tr class="row0"><td class="cell29"><span class="ts0">Drawing</span>

</td><td class="cell30"><span class="ts0">1170-780-112-456</span>

</td><td class="cell31"></td></tr><tr class="row0"><td class="cell29"><span class="ts0">Comment</span>

</td><td class="cell30"><span class="ts0">Check the pen colours</span>

</td><td class="cell31"></td></tr></tbody></table>

</div>---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">New Stock Request</span>


The **New Stock Request** button is used to create a **request for stock items required for a job**.

This screen allows you to:

<div id="bkmrk-enter-a-reference-an">- Enter a **reference and description** for the request
- Select the **requested by** user and required date
- Add the **stock items and quantities needed**
- Link the request to the **job number**

</div>Once completed, the request can be saved and sent for processing, allowing the store team to supply the required items for the job.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/1XTimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/1XTimage.png)

- Basic Tab

<table border="1" id="bkmrk-complete-to-store-%C2%A0-" style="border-collapse: collapse; width: 100%;"><colgroup><col style="width: 18.8272%;"></col><col style="width: 81.2964%;"></col></colgroup><tbody><tr><td>**Stock Request No**</td><td><div>System-generated number for the request</div></td></tr><tr><td>**Reference**</td><td><div>Optional reference for internal tracking</div></td></tr><tr><td>**Description**</td><td><div>Brief details about the stock request</div></td></tr><tr><td>**Storeman**</td><td><div>Select the staff member responsible for the request</div></td></tr><tr><td>**Requested By**</td><td><div>Shows the current status of the request (e.g. Requested)</div></td></tr><tr><td>**Sort By**</td><td><div>How items are arranged (e.g. Stock Code)</div></td></tr><tr><td><div>**Date Created**</div></td><td><div>When the request was created</div></td></tr><tr><td><div><div>**% Complete**</div></div></td><td><div><div>Progress of the request</div></div></td></tr><tr><td>**Date Req. By**</td><td><div>Required date for the items</div></td></tr><tr><td>**Document Type**</td><td><div>Type of record (e.g. Job)</div></td></tr><tr><td>**Job Number**</td><td><div>Links the request to a specific job</div></td></tr><tr><td>**Select**</td><td><div>**(Actual / CTC / SC):** Determines costing/selection method</div></td></tr></tbody></table>

- Item Grid (Botton Section)

This screen ensures all required stock for a job is formally requested, tracked, and supplied by the store team.

<table border="1" id="bkmrk-code-item-code-descr" style="border-collapse: collapse; width: 100%; height: 238.375px;"><colgroup><col style="width: 22.0834%;"></col><col style="width: 78.0358%;"></col></colgroup><tbody><tr style="height: 29.7969px;"><td style="height: 29.7969px;"><div>**Code**</div></td><td style="height: 29.7969px;">Item Code</td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;">**Description**</td><td style="height: 29.7969px;"><div>Item details</div></td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;"><div>**Item Type**</div></td><td style="height: 29.7969px;"><div>Type of item (e.g. stock, service)</div></td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;"><div>**Line Reference**</div></td><td style="height: 29.7969px;"><div>Reference per line</div></td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;"><div>**Quantity**</div></td><td style="height: 29.7969px;"><div>Number of items requested</div></td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;"><div>**Date Req. By**</div></td><td style="height: 29.7969px;"><div>Required date per item</div></td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;"><div>**UOM**</div></td><td style="height: 29.7969px;">Unit of measure</td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;"><div><div>**Warehouse / Bin Location**</div></div></td><td style="height: 29.7969px;"><div>Where the item is stored</div></td></tr></tbody></table>

- Scan Tab

The **Scan** tab works the same as the Basic tab but is designed for **barcode scanning**.

<div id="bkmrk-scan-barcode%3A-scan-o">- **Scan Barcode:** Scan or enter the item barcode to quickly add it to the request
- **Last Item / Last Result:** Displays the most recently scanned item and result
- **Scan Log:** Shows a history of scanned items

</div>Items scanned are automatically added to the **item grid below**, removing the need to manually search and enter stock codes.

**Purpose:** Speeds up stock requests by allowing items to be added using a barcode scanner.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/1ALimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/1ALimage.png)

---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">Create PO</span>


The **Create PO** screen is used to generate **purchase orders for items required on a job**.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/Pmyimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/Pmyimage.png)

<table border="1" id="bkmrk-grouping-select-none" style="border-collapse: collapse; width: 100%; height: 329px;"><colgroup><col style="width: 19.568%;"></col><col style="width: 80.5556%;"></col></colgroup><tbody><tr style="height: 86.8281px;"><td style="height: 86.8281px;">**Grouping**</td><td style="height: 86.8281px;">Choose how items are grouped when creating POs:

<div>- **None** (no grouping)
- **Creditors** (group by supplier)

</div></td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;">**Description**</td><td style="height: 29.7969px;"><div>Enter a description for the purchase order(s) </div></td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;">**Creditor**</td><td style="height: 29.7969px;">Select or update the **supplier** for the items

</td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;">**Show Not Started**</td><td style="height: 29.7969px;"><div>Displays items not yet processed</div></td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;">**Show No Creditor**</td><td style="height: 29.7969px;">Shows items without a supplier assigned</td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;">**Show Zero Items**</td><td style="height: 29.7969px;">Includes items with zero quantity</td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;">**Show PO Items**</td><td style="height: 29.7969px;">Shows items already linked to a PO</td></tr><tr style="height: 63.3906px;"><td style="height: 63.3906px;">**Create POs/**

**Close**

</td><td style="height: 63.3906px;"><div>Select the required items from the grid</div><div>Click **Create POs** to generate purchase order(s)</div><div>**Close** to exit the screen</div></td></tr></tbody></table>

---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">Create BOM</span>

This screen allows you to quickly **add multiple predefined items to a job** using a selected BOM, saving time and ensuring consistency.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/YKOimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/YKOimage.png)

<table border="1" id="bkmrk-bom-type-choose-basi" style="border-collapse: collapse; width: 100%;"><colgroup><col style="width: 16.7263%;"></col><col style="width: 83.3929%;"></col></colgroup><tbody><tr><td><div>**BOM Type**  
</div></td><td><div>Choose **Basic** or **Advanced**, which determines which BOM list is available</div></td></tr><tr><td><div>**Result Item**  
</div></td><td><div>Select the BOM item you want to apply (based on the chosen BOM type)</div></td></tr><tr><td><div>**Description**</div></td><td><div>Displays or allows entry of the BOM description</div></td></tr><tr><td><div>**Bill of Materials**  
</div></td><td>Select the specific BOM record if multiple exist

</td></tr><tr><td><div>**Quantity**</div></td><td><div>Number of times the BOM will be applied</div></td></tr><tr><td><div>**Warehouse**</div></td><td><div>Select the warehouse the items will be drawn from</div></td></tr><tr><td><div>**Projected Date**  
</div></td><td><div>Expected date for the BOM items</div></td></tr><tr><td><div>**Machine**</div></td><td><div>Optional field for linking to a machine</div></td></tr><tr><td><div>**Job No Link**  
</div></td><td>Confirms the job the BOM will be added to

</td></tr><tr><td><div>**Manage Job**  
</div></td><td><div>Apply the BOM and manage the lines immediately</div></td></tr><tr><td><div><div>**CTC / SC**  
</div></div></td><td>Choose how the BOM is costed (Cost to Company or Scope Creep)

</td></tr><tr><td><div><div>**Actions**</div></div></td><td><div><div>**Save &amp; Close:** Apply the BOM and exit</div><div>**Save:** Save without closing</div><div>**Close:** Exit without saving</div><div>**Manage BOM:** Open BOM management (if available)</div></div></td></tr></tbody></table>

---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">Verify Task Stock </span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/LhNimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/LhNimage.png)

---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">Task Stock Request</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/GXKimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/GXKimage.png)

---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">Delete Task</span>

The **Delete Task** button is used to remove a **task from the job**.

<div id="bkmrk-you-must-first-selec">- You must first select a **task from the Tasks section** (left panel)
- The button will only work when a **task is highlighted/selected**

</div>When clicked, a confirmation message will appear:

<div id="bkmrk-click-yes-to-delete-">- Click **Yes** to delete the task
- Click **No** to cancel

</div>**Note:** Only tasks (not standard job lines) can be deleted using this button.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/LWlimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/LWlimage.png)

---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">Add a Picking Slip</span>

This function allows you to **send selected job items to the warehouse** so they can be picked and prepared for the job.

<div id="bkmrk-you-must-first-highl">- You must first **highlight the job line(s)** you want to add
- Clicking the button opens the **Add To Picking Slip** screen

</div>**On this screen you can:**

<div id="bkmrk-select-an-existing-p">- Select an existing **Picking Slip** or create a new one
- Choose whether to add items from a **Quote** or **Stock Request**
- View the selected items in the top grid
- Add items to the picking slip using **Add / Add All / Add Per Quote**

</div>The bottom grid shows the items that have been added to the picking slip.

**Actions:**

<div id="bkmrk-remove-%2F-remove-all%3A">- **Remove / Remove All:** Remove items from the picking slip
- **Edit:** Modify selected lines
- **Print:** Print the picking slip
- **Close:** Exit the screen

</div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/ZMjimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/ZMjimage.png)

---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">Planned Time Log</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/OhKimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/OhKimage.png)

---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">Copy to Job</span>

This function lets you **reuse job lines across different jobs**, saving time and ensuring consistency.

<div id="bkmrk-you-must-first-highl-1">- You must first **highlight the line item(s)** you want to copy
- Clicking the button opens the **Copy Job lines to other job** screen

</div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/5VDimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/5VDimage.png)

<table border="1" id="bkmrk-copy-to-new-job%3A-sel" style="border-collapse: collapse; width: 100%;"><colgroup><col style="width: 50.0596%;"></col><col style="width: 50.0596%;"></col></colgroup><tbody><tr><td>**Copy to new Job:**</td><td>Select the job you want to copy the line(s) to</td></tr><tr><td>**Quote Lines:**</td><td>Tick to copy as **quote lines**</td></tr><tr><td>**Scope Creep (SC) Lines:**</td><td>Tick to copy as **scope creep lines**</td></tr><tr><td>**Cost to Company (CTC):**</td><td>Tick to copy as **cost to company lines**</td></tr><tr><td>**Quantity Type:**</td><td>Choose how the quantity is copied:

\- For example, **Balance** will copy only the remaining quantity

</td></tr><tr><td>**Actions**</td><td>- **Continue:** Copies the selected line(s) to the chosen job
- **Close:** Exits without copying

</td></tr></tbody></table>

---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">Clear Line History</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/eBdimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/eBdimage.png)

---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">Delete Job Line</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/nMBimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/nMBimage.png)

---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">Change Line Type</span>

?????

---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">CTC to SC</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/nuOimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/nuOimage.png)

---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">Create RFQ</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/Ml8image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/Ml8image.png)

---

##### <span style="color: rgb(34, 34, 34); font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 1.4em; font-weight: 400;">Production Tracking</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/bAtimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/bAtimage.png)

---

##### Replace Item

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/XJMimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/XJMimage.png)

---

##### Manage All

The **“Unmanage All”** function will reverse any managed quantities on job lines, reducing them back to an unmanaged state based on what has not yet been invoiced.

<table border="1" id="bkmrk-a-unmanage-all-items" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px;"><tbody><tr><td class="align-center">**A**</td><td>UnManage All items on a job</td></tr><tr><td class="align-center">**B**</td><td>Clear Line History

Only works if the Managed Actual quantity equals zero

</td></tr><tr><td class="align-center">**C**</td><td>Delete Job Line

Only works if there are no Line History entries

</td></tr></tbody></table>

<div id="bkmrk-any-quantities-alrea"></div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/tf8image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/tf8image.png)

---

##### Move to Job

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/Aoeimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/Aoeimage.png)

---

##### Support Log

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/lGCimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/lGCimage.png)

---

##### Time Log

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/s1uimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/s1uimage.png)

---

##### Quick Time Log

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/7fuimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/7fuimage.png)

---

##### Create Checklist

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/Y3Dimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/Y3Dimage.png)

---

##### Checklist

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/QiBimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/QiBimage.png)

---

##### Complete

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/AMCimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/AMCimage.png)

# Job Costing Screens Defined

### Manage Job - Buttons Explained

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/NrEimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/NrEimage.png)

<table border="1" id="bkmrk-info-%C2%A0-workflow-read" style="width: 99.6428%;"><tbody><tr><td style="width: 24.876%;">**Info**</td><td style="width: 75.1462%;">This screen is used to add and manage **internal notes for a job**.

<div>- Enter notes in the main text area (with formatting options available)
- **Save** to store notes against the job
- **From Template** to insert **pre-set templates**
- **Print Notes** to include notes in printed documents
- **Close** to exit

</div></td></tr><tr><td style="width: 24.876%;">**Workflow**</td><td style="width: 75.1462%;">This screen allows you to control how the Job Workflow overview is displayed, helping you plan and track jobs over a selected time period.

</td></tr><tr><td style="width: 24.876%;">**Ready for Invoice**</td><td style="width: 75.1462%;">When selected, it simply adds a **thumbs-up icon** to the job in the results grid, providing a clear visual indicator that the job is complete and ready for billing.

</td></tr><tr><td style="width: 24.876%;">**Functions**</td><td style="width: 75.1462%;">The **Functions** tab provides access to a range of additional actions that can be performed on a selected job. These are typically used for maintenance, updates, or managing specific job settings.

</td></tr><tr><td style="width: 24.876%;">**View Doc**</td><td style="width: 75.1462%;">When you select a document in the Sales Doc or Purchase Doc tab and click **View Doc**, the document will open in a new screen.

</td></tr><tr><td style="width: 24.876%;">**Print Doc**</td><td style="width: 75.1462%;">When you select a document in the Sales Doc or Purchase Doc tab and click **Print Doc**, it will open a print selection screen.

From there, click **Continue** to either **print or email the document**.

</td></tr><tr><td style="width: 24.876%;">**Print Reports**</td><td style="width: 75.1462%;">The **Print Reports** button provides a dropdown list of available job reports.

Select the required report (e.g. Job Card, Job Analysis, Cost Report), and it will open ready for printing or review.

This allows quick access to different reports related to the selected job.

</td></tr></tbody></table>


### Manage Job - Tab Explained

#### **Basic Tab Overview**

The **Basic** tab provides a high-level overview of the job and contains the key fields required to manage and update core job information.

The **Basic tab** is used to:

<div id="bkmrk-view-and-update-key-">- View and update key job details
- Track job progress and status
- Assign responsibility and references
- Capture essential operational and administrative information

</div>It acts as the central point for managing the most important aspects of a job before moving into more detailed tabs (such as Dates, Address, or Progress).


[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2024-07/scaled-1680-/2Rzimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2024-07/2Rzimage.png)

<table border="1" id="bkmrk-completed-%C2%A0-charge-u" style="width: 100.357%; height: 415.824px;"><colgroup><col style="width: 18.333%;"></col><col style="width: 81.561%;"></col></colgroup><tbody><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Completed**</td><td style="height: 29.7017px;"><div>This controls the **overall progress of the job**- Can be updated manually to reflect how far along the job is
- Helps with tracking timelines and reporting

The small controls beside it allow for **quick adjustments** without typing</div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Charge Up (SC) Tick**</td><td style="height: 29.7017px;"><div><div>When ticked, this indicates the job is **chargeable to the customer**</div></div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Assembly Tick**</td><td style="height: 29.7017px;"><div><div>Used when the job involves **building or assembling components**</div></div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Prepriced (CTC) Tick**</td><td style="height: 29.7017px;"><div><div>Indicates the job has **fixed or predefined pricing**, meaning costs are not calculated dynamically</div></div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Internal Job Tick**</td><td style="height: 29.7017px;"><div><div>Marks the job as **internal use only**, meaning it is not billed to a customer</div></div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Sub Job Link**</td><td style="height: 29.7017px;"><div><div>Allows you to **connect this job to another related job**, useful for larger projects split into parts</div></div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Comment**</td><td style="height: 29.7017px;"><div><div>Used to add **important notes, instructions, or context**- This is useful for keeping **communication clear between users or teams**

</div></div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Short Description**</td><td style="height: 29.7017px;"><div><div>A **brief summary** of the job for quick identification</div></div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Reference**</td><td style="height: 29.7017px;"><div><div>Any **additional identifier or note** provided by the customer or internally</div></div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Order No**</td><td style="height: 29.7017px;"><div><div>Links the job to a **customer order or purchase order**</div></div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Sales Rep**</td><td style="height: 29.7017px;"><div><div>The **person responsible for the sale or account**</div></div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Status/Position**</td><td style="height: 29.7017px;"><div><div><div>Shows where the job sits within the **workflow or process stage**</div></div></div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;"><div>**Team**</div></td><td style="height: 29.7017px;"><div><div><div>The **group or department** responsible for completing the job</div></div></div></td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">**Asset Item**</td><td style="height: 29.7017px;"><div><div><div>Links the job to a **specific asset or item**, if required - Includes lookup options to quickly **search and attach records**

</div></div></div></td></tr></tbody></table>


##### Job Percentage Complete

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/8cLimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/8cLimage.png)

The job completion percentage is calculated by comparing the **total budgeted quantity** to the **total actual quantity completed**.

This value is displayed in blue; however, it may not always accurately reflect the true completion status. In such cases, the user may need to adjust it manually.

The percentage can be updated by clicking the **arrow button** or selecting a value from the **dropdown menu**.

If the **tick box is enabled**, the percentage will automatically update each time the job is saved. If the tick box is disabled, the percentage will remain unchanged and must be updated manually by the user.

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2962).png)

A single button is available to **update the completion percentage across all jobs simultaneously**.

This function will only apply to jobs where the **tick box is enabled**. Jobs with the tick box disabled will **not be updated automatically** and must be adjusted manually by the user.


#### **Filter Tab Overview**

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2024-07/scaled-1680-/r2Fimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2024-07/r2Fimage.png)

<table border="1" id="bkmrk-item-code-%C2%A0-descript" style="width: 99.7619%;"><colgroup><col style="width: 21.1245%;"></col><col style="width: 78.8905%;"></col></colgroup><tbody><tr><td>**Item Code**</td><td> </td></tr><tr><td>**Description**</td><td>  
</td></tr><tr><td>**Department**</td><td>  
</td></tr><tr><td>**Function**</td><td>  
</td></tr><tr><td>**Req Date From and To**</td><td>  
</td></tr><tr><td>**Quote No**</td><td>  
</td></tr><tr><td>**Show Locked Lines Tick**</td><td>  
</td></tr><tr><td>**Employee**</td><td>  
</td></tr><tr><td>**Line Type**</td><td>  
</td></tr><tr><td>**Line Reference**</td><td>  
</td></tr><tr><td>**Line Status**</td><td>  
</td></tr><tr><td>**Group Name**</td><td>  
</td></tr><tr><td>**Update Lines**</td><td>  
</td></tr><tr><td>**Clear Filter**</td><td>  
</td></tr><tr><td>**Delete Range**</td><td>  
</td></tr></tbody></table>

#### **Progress Tab Overview**

The **Progress tab** provides a summary of job performance, with totals calculated based on values entered in the **Scheduling tab** (task activity groups).

**![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3731).png)**

<table border="1" id="bkmrk-total-sell-budget-th" style="border-collapse: collapse; width: 100%;"><colgroup><col style="width: 21.3637%;"></col><col style="width: 78.7446%;"></col></colgroup><tbody><tr><td>**Total Sell Budget**

</td><td>- This value is initially populated when a quote is promoted to a job.
- It represents the **total sell value (excluding)** from the quote.
- This figure **can be manually updated** if required.

</td></tr><tr><td>**Total Cost Budget**

</td><td>- Also populated when the quote is promoted to a job.
- Represents the **total cost value (excluding)** from the quote.
- This figure **can be manually updated**.

</td></tr><tr><td>**Activity Job Progress %**

</td><td><div>- Calculated as the **sum of percentage completion** entered in the Scheduling tab for task activity groups.
- Reflects overall job progress.

</div></td></tr><tr><td>**Activity Sell Budget Sum**

</td><td><div>- The **total of all sell values** assigned to task activity groups in the Scheduling tab.

</div></td></tr><tr><td>**Invoiced to Date**

</td><td>- The **total value of all processed invoices**.
- Displayed as the **sell value excluding GST**.

</td></tr><tr><td>**Potential to Invoice**

</td><td>- Calculated as:  
    **Activity Sell Budget – Invoiced to Date**
- Indicates remaining value available to invoice.

</td></tr><tr><td>**Invoiced % to Date Sum**

</td><td><div>- The **total percentage already invoiced**, based on percentages entered on task activity lines.

</div></td></tr><tr><td>**Value to Invoice**

</td><td><div>- The **calculated value ready to be invoiced**, based on the invoicing percentages selected on task activity lines.

</div></td></tr><tr><td>**Total Hours**

</td><td><div>- A **manual entry field** used to record the total hours required for the job.

</div></td></tr></tbody></table>

<div id="bkmrk--1"></div>#### **Manage Job - Notes Tab**

The Notes for Manage Job has been upgraded to the new text format

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/scaled-1680-/CFqimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/CFqimage.png)

# Job Bill of Materials Process (BOM)

#### **<span class="ts2">The Job Bill of Material (BOM)</span>**

<div id="bkmrk-this-process-enables">This process enables you to produce a BOM resultant item using a job, ensuring accurate control of the final item cost, including all applicable labour and service costs.</div><div id="bkmrk-"></div><span class="ts0">Process Steps:</span>

<div id="bkmrk-quotecreate-and-prep">**Quote**  
Create and prepare the initial job quote.</div><div id="bkmrk-manage-jobconvert-th">**Manage Job**  
Convert the approved quote into an active job and manage it accordingly.</div><div id="bkmrk-add-labour-and-servi">**Add Labour and Service Costs**  
Include any relevant labour or additional service costs to ensure the total job cost is accurate.</div><div id="bkmrk-process-job-bom-and-">**Process Job BOM and Close**  
Process the Job BOM to generate the resultant item, then close the job.</div><div id="bkmrk--1"></div><div id="bkmrk--2"></div><div id="bkmrk--3"></div><div id="bkmrk--4"></div>#### <span style="color: rgb(35, 111, 161);">**Job Bill Of Material (BOM) Process**</span>

<div id="bkmrk--5"></div>![job_bom_updated.png.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/embedded-image-9vrwbxfz.png)

#### <span class="ts4">Resultant Item Setup</span>

<span style="color: rgb(45, 194, 107);">Go to **Inventory &gt; Configuration &gt; Inventory Setup**</span>

<div id="bkmrk-click-add-enter-an-i">- Click **Add**
- Enter an **Item Code** (ensure it aligns with your existing inventory coding convention)
- Enter the required **Item Description**
- Select the correct **Group Code**
- Click **Save**
- Navigate to the **Bill of Material** tab

</div><span class="ts0"> </span><span class="ts12"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2458).png)

- Select the **BOM Item** checkbox
- Click **Save and Close**

<div id="bkmrk--7"></div><span class="ts12"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2459).png)

#### <span class="ts0"> </span><span class="ts4">Setup the BOM item</span>

<span class="ts0">Go to setup the Bill of Materials item</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2476).png)

<span class="ts0"> </span>

#### <span class="ts4">Capture Quote - Job Costing</span>

<span style="color: rgb(45, 194, 107);"><span class="ts0"> </span><span class="ts0">J**ob Costing &gt; Activity &gt;Quotation**</span></span>

- Enter the **GST Production Account Code**
- Enter the **Description** and **Reference**
- Enter the **Order Number**
- Click the **Address** tab

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2460).png)

- Enter the required **Division**
- Enter the required **Region**
- Enter the **Invoice Group** (if applicable)

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2461).png)

- Click **Save**
- Select the **Add** tab
- Choose the **Stock Code** or enter the description for the resultant item to be produced
- Enter the required **Quantity**
- Enter the estimated **Cost Price -** Do **not** enter a selling price

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2462).png)

- Click **Save and Close**
- Click the **Approval Options** dropdown
- Select **Customer Approval** – this must be selected to ensure correct reporting
- Select **Approve to Job**

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2463).png)

<div id="bkmrk-once-approve-to-job-">Once **Approve to Job** has been selected, this screen will appear</div><div id="bkmrk--12"></div><div id="bkmrk-ensure-the-appropria">Ensure the appropriate options are selected based on how you want to control and manage the job</div><div id="bkmrk--13"></div><span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2464).png)

<div id="bkmrk-ensure-the-exceed-qu">Ensure the **Exceed Quantities** and **Value** options are selected.</div><div id="bkmrk-%28this-allows-quantit">  
*(This allows quantities and values to exceed the original job budget where required)*</div><div id="bkmrk--14"></div>- Click **Continue**
- Click **OK**

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(973).png)

#### <span class="ts4">Manage Job</span>

<span style="color: rgb(45, 194, 107);">**<span class="ts11">Job Costing &gt; Activity &gt; Manage Job</span>**</span>

- Enter the **Job Number**
- Select the required **Production Job**
- Click **Manage Job**
- Click the **Cost to Company** button

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2465).png)

- Enter the **Item Code** of the stock item being used to produce this BOM item
- Enter the required **Quantity**
- Click **Save and New** to add another item

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2466).png)

<div id="bkmrk-continue-adding-all-"><div class="fai-CopilotMessage__content r1izxv8h ___7qar2c0 fcthzvy" dir="auto" id="bkmrk-continue-adding-all--1"><div><div dir="auto"><div class="___1vve6yh f22iagw f1vx9l62 f122n59 f3bhgqh f1mnxvew fly5x3f"><div class="___j4vmuw0 f22iagw f1vx9l62 f1869bpl fly5x3f fbc6vix"><div data-fui-focus-visible="" data-testid="loading-message" tabindex="-1"><div><div><div class="___1yop6mf f336tjw f9ijwd5 fz7g6wx fod5ikn f1s184ao" id="bkmrk-continue-adding-all--2"><div class="___1y7j18r f10pi13n ftgm304"><div aria-hidden="true" class="___1j4t0a1 f1lmfglv f1abmfm4" data-message-type="Chat" data-testid="markdown-reply" dir="auto"><div class="___1obcdld f22iagw f1vx9l62 f1i1t7jz fk15e71 f1k953kz f137keqj f1rncccw f1stllg3 f1w4kmmc f1tric3v f10dk5ic fx8cdsv f16nlwsl f1eookvz fhjrts3 fqugt2f f18d18k8 f1v1vhmp f1hdmul3 f198vjnp f2dshw1 fjpjndq fnmj2pj ffrrb40 f1mon110 fhajzam fimndk6 fxv4dng fb1rn9k f59wlhv f1xmfh30 f18yf5o5 fmr6chf fw8qy2q ff161sd f1qr7t77 f1yyogn1 foogchg fp5872b f1tpb8gf f1hdgrc8 f1vatr43 frkxccd f9pdzkb f158oiaz ft5kggy f5l4ui7 f13j03li f18xdoka f8off4e f1go6zfc f128n2ra f1jpxw2j f1lwd9n0 fy0b8hm f1g2633v fx4kvgi fkvolse f1gxrt3a f1os76ua f1js9cnw f1g87ej0 freluf8 f1yggaq6 f2i3chp f1151osp florpoh f35kzfz ftp9m57 f1e288vi fz62hnz fixvuys f1nmofwh fc1c6mv f18a2er7 fhvkrdl fhxnn68 f1oce4bo fvhlfan f7tc0t0 f1ngf1n2 ffrzq6x f1yjiq2m f1aqdgql f1huvaf f10ij78l f1k94sa4 fkmfumq f1jvzkyl f1eu24ob f1xbfc1f fmf0lwf f107dsy8 f3w566c f4648sl f13zpkng f7unjfp f8p1rz fzu6h1w f1i1bi6h f1smo7hi f1sk1xod f1kgogdq f1gjktkp ft608jz f19dd9cz fg3xr24 fhd155k f1b8gl2e fg4b9ou flb4lo fdicbfk fgwcyh1 f1jbds0d f1fb9uea f1stuka4 fcrtu6g fwqh0xn f11w66yg f6e0e65 f1vvgu0 f1607507 fgct6un f1ec1nbe f1m9bycv f1ntoah8 f1b694rt faql4r2 fpjuhzh fmavl6h f1d9bsk fmzhlt0 f145l92p fwkyaqm f129obh1 f19la9g f127w39w fr0ux9m fxhidck f1cu4h9j f1wnbo7v f1eueg4z fy9c24f f1h2o91j f1iw08fq">- Continue adding all items required to produce the resultant item

</div></div></div></div></div></div></div></div></div></div></div></div><div class="fai-CopilotMessage__footnote r1bn3aft ___7qar2c0 fcthzvy">  
</div></div><span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2467).png)

<div id="bkmrk-you-can-check-stock-">You can check stock on hand for both the component items and the resultant item by navigating to:  
<span style="color: rgb(45, 194, 107);">**Inventory &gt; Analysis &gt; Stock Enquiry**</span></div><div id="bkmrk--16"></div><span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2468).png)

- Manage the stock items added to the job
- Double-click the relevant line and enter the **quantity used**

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2469).png)

Once all stock items have been processed, review the job lines to ensure they are accurate and have been correctly managed

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2470).png)

Ensure all timesheets from relevant staff have been submitted and are ready for capture, or have already been entered into the system

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2471).png)

- Check the costing analysis of the job
- Open the job
- Select the **Print** tab
- Click the **Job Total Analysis** button

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2472).png)

Click the **Managed Totals** tab

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2473).png)

- <span class="ts0"> </span><span class="ts0">Click the **View Details** Button</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2474).png)

<div id="bkmrk-review-the-details-t">Review the details to ensure everything is accurate.</div><div id="bkmrk--18"></div><div id="bkmrk-once-all-lines-have-">Once all lines have been verified and the job is ready to be completed: - Close all open windows
- Return to the **Job Search** screen
- Search for the job, then click the **Extras** dropdown
- Select the **Job BOM** button

</div><span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2475).png)

- Enter the **Resultant Item Code**
- Enter the **Quantity** to be produced
- Click **Save**
- Click **Process**

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2477).png)

<span class="ts12"> </span>

<span class="ts12"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(989).png)

- <span class="ts12"> Verify the BOM Item Stock</span>

<span class="ts12"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(990).png)

You will notice that the **resultant item stock on hand** has now been updated and increased accordingly

<span class="ts12"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(990).png)

# File Upload & Import Process

<div id="bkmrk-click-the-select-fil">Click the **Select File** button to open the file browser and locate the file you want to import.</div><div id="bkmrk-click%C2%A0upload-to-send">Click **Upload** to send the file to the server and start the import process.</div><div id="bkmrk-"></div>**Quantity Multiplier Option**

<div id="bkmrk-you-have-the-option-"><div>- You have the option to **multiply quantities during import**. This will adjust both the **budget quantity** and the **managed quantity**.
- The default value is **1**, but this can be changed **before uploading the file**.

**When to Use**</div></div>This feature is ideal when importing a **recipe or BOM set up for a single unit**. The multiplier allows you to scale the quantities automatically during import, saving time and ensuring accuracy.

<p class="callout info">**Please Note**</p>

<div id="bkmrk-the-file-must-be-in-">- The file must be in **.CSV format** using **semi-colon (;) separation**
- The file must include **headers**, however these will be ignored during import
- If any errors occur, they will be recorded in the **log**
    - Please correct the errors and restart the import process

</div>##### **Import Rules**

<div id="bkmrk-the-csv-file-must-us">1. The **CSV file must use semi-colon (;) separation**
2. **Stock items** take cost from the item setup, regardless of any cost entered in the file
3. **Stock items** take the selling price from the Excel file
4. If the stock item selling price is blank, it defaults to the **item setup value**
5. **Custom and Service items** take both cost and selling price from Excel
6. If cost and selling are blank for Custom or Service items, values default to **item setup**
7. If a **Service item** uses time allocation and an employee rate is set, cost is taken from **user setup rates (1, 2, or 3)**
8. If cost is set to **zero (0)**, it will be imported as zero
9. If **Managed Qty** is blank, the line is added as **Not Started**
10. If **Managed Qty** has a value, the line is added as **Active**
11. If there is **no stock on hand**, the line will be added but **not managed**
12. If the **Required Date** is blank, the system uses the **current date**
13. Dates must be in the format: **YYYY-MM-DD** (e.g. 2020-04-05)
14. If the **Employee field** is blank, it will remain blank
15. The **Employee field** uses the **login ID**
16. If the **Rate field** is blank (with an employee), it remains blank
17. Set **Rate to 1, 2, or 3** to use the corresponding user setup rate
18. If both **Employee and Rate** are set for a Service item, cost is taken from the **user setup rate**
19. **Description** is imported from Excel
20. If Description is blank, it defaults from **item setup**
21. Set **Is Complete = 1** to mark the line as complete
22. For stock items, the correct **Warehouse Code** must be provided
23. **Drawing** is a free text field
24. **Comment** is a free text field

</div>**CSV File Template**

Below is the required structure for the CSV import file. Ensure the file is saved with **semi-colon (;) separators**.

```
ItemCode;Description;Quantity;Cost;Selling;ManagedQty;RequiredDate;Employee;Rate;IsComplete;WarehouseCode;Drawing;Comment

ITEM001;Sample Stock Item;10;;25.00;10;2026-06-01;jbloggs;1;0;MAIN;DRW001;Standard item
SERV001;Labour Task;5;50.00;75.00;5;2026-06-02;asmith;2;0;;;Installation work
CUST001;Custom Item;2;20.00;40.00;;2026-06-03;;;0;;Custom ref;Special notes
```

**Field Overview**

<div id="bkmrk-itemcode-%E2%80%93-stock%2C-se">- **ItemCode** – Stock, Service, or Custom item code
- **Description** – Item description (optional if using item setup)
- **Quantity** – Budget quantity
- **Cost** – Cost value (rules apply depending on item type)
- **Selling** – Selling price
- **ManagedQty** – Quantity to manage on the job
- **RequiredDate** – Format: YYYY-MM-DD
- **Employee** – User login ID
- **Rate** – 1, 2, or 3 (user setup rate)
- **IsComplete** – 1 = Complete, 0 = Not complete
- **WarehouseCode** – Required for stock items
- **Drawing** – Free text field
- **Comment** – Free text field

**Key Notes**</div><div id="bkmrk-leave-fields-blank-w">- Leave fields blank where not applicable
- Ensure formatting matches the rules provided
- Validate data before importing to reduce errors

</div>

# Job Management Letter/Note Template

##### Where to find Job Management Letter Templates

There are two places within the Job management where you can pull in templates to record job information and Notes. These templates are set up in CRM Module.

<span style="color: rgb(45, 194, 107);">**CRM &gt; Configuration &gt; Email Template**</span>

- Use the email drop-down below to filter the Job Management templates.
- Click "Add" to add a new template

<div id="bkmrk-"></div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-04/scaled-1680-/Sybimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-04/Sybimage.png)

##### Creating a new Template for Job Managing

Add the below for your template as shown below:

- **Code**
- **Description**
- Choose the type "**Manage Job**"
- Add your template, here you will be able to design your template by adding text, images, grids, links etc.
- Click "**Save &amp; Close**"

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-04/scaled-1680-/wlsimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-04/wlsimage.png)

##### Where to Add a Job Management Letter Templates

Job costing has two locations where the templates can be pulled in.

**<span style="color: rgb(45, 194, 107);">Job Costing Module &gt; Activity &gt; Manage Job</span>**

- Search for the job you are wanting to add a template to.

<span style="color: rgb(45, 194, 107);">**[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-04/scaled-1680-/uVOimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-04/uVOimage.png)**</span>

<span style="color: rgb(0, 0, 0);">**Notes (Add template here)**</span>

- **Double Click** on the job line to open the job
- Click on "**Notes**"
- Click on "**From Template**" a widow will open with a dropdown
- Select your template from the dropdown to populate the text box.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-04/scaled-1680-/PAaimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-04/PAaimage.png)

**Info (Add template here)**

- Click on "**Info**"
- Click on "**From Template**" a widow will open with a dropdown
- Select your template from the dropdown to populate the text box.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-04/scaled-1680-/V83image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-04/V83image.png)

<div id="bkmrk-supports-job%E2%80%91related"></div>

# Closing or Cancel Job

##### Closing a Job

<span style="color: rgb(45, 194, 107);">**Job Costing &gt; Activity &gt; Manage Job**</span>

A job is automatically closed upon issuing a final invoice. However, if invoicing is complete and the job remains open due to outstanding purchase orders or quotes, it can be manually closed as needed.

- **Close** all the open documents (Quotes, PO, Delivery Notes)
- **Highlight** the job line you want to close
- Click "**Functions**" dropdown at the top left of the screen
- Click "**Close or Cancel Job**"

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/EYHimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/EYHimage.png)

<div id="bkmrk-this-screen-is-used--1">This screen is used to close a job. You select how it’s being closed, confirm it, and then click OK. The job and customer details are already filled in automatically.</div><div id="bkmrk--1"></div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/W95image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/W95image.png)

**Auto-populated information**

These details are pulled through from the job:

<div id="bkmrk-job-no-%E2%80%93-displays-th">- **Job No** – Displays the job being closed (e.g. JOB5312)
- **Customer** – Shows the customer linked to the job
- **Details** – Additional job information (if applicable)

**Closing setup**</div>**Close Type**

<div id="bkmrk-used-to-select-how-t">- Used to select how the job is being closed financially or operationally
- Example shown: **Stock write off**

**Type of Close**</div>Choose one of the following options:

<div id="bkmrk-close-job-%E2%86%92-standard">- **Close Job** → Standard closing of the job
- **Cancel Job** → Use if the job is no longer going ahead
- **Completed** → Confirms the job has been fully finished

**Linked Job (optional)**</div><div id="bkmrk-allows-you-to-link-t">- Allows you to link this job to another if required
- Options like: 
    - **CTC (Cost to Company)**
    - **SC (Scope Creep)**
- Additional fields (Item, Description, Cost, Selling) will activate if used

**Confirm Close**</div><div id="bkmrk-confirm-close-%28check">- **Confirm Close (checkbox)**  
    👉 Must be ticked to finalise the job closure

**Actions**</div><div id="bkmrk-ok-%E2%86%92-completes-the-j">- **OK** → Completes the job closing process
- **Show O/S Docs** → Displays any outstanding documents (must usually be resolved before closing)
- **Cancel** → Exits without closing the job

</div>

# Reopening a Job

This manual outlines recent system changes designed to identify when a job has been reopened.

When searching for jobs, reopened jobs will be clearly indicated in the grid:

<div id="bkmrk-the-row-will-be-high">- The row will be highlighted in green
- A **Reopened** column will display the date and time the job was reopened

</div><span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2448).png)

<span class="ts0"> </span>

**Lock Lines**

When a job is closed, all associated lines—whether managed or not—are locked.

If the job is later reopened, these existing lines will remain locked and cannot be edited.  
Only new lines can be added to the job.

<span class="ts0"> </span>

**Job Reopened Indicators**

When opening a reopened job, the system clearly highlights this status for visibility.

<div id="bkmrk-a-reopened-indicator">- A **Reopened indicator** is displayed in the top left corner of the job screen
- Any lines that were locked upon reopening are clearly identified

</div>This ensures users can easily recognise that the job has been reopened and understand which lines can no longer be edited

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2449).png)

<span class="ts0"> </span>

**Refresh Grids**

You can now refresh job tabs without needing to close and reopen the job.

Simply click on the **All Job Lines Level tree view**, and the system will automatically refresh all job tabs, including the line items.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2450).png)

<div id="bkmrk--2"></div>

# Manage Job Statuses

##### **Job Statuses**

Job statuses indicate the current stage of a job, helping users track progress, manage workflows, and ensure accurate reporting.

<table border="1" id="bkmrk-status-details-notst" style="border-collapse: collapse; width: 100%; height: 353.938px;"><colgroup><col style="width: 30.1853%;"></col><col style="width: 69.9383%;"></col></colgroup><tbody><tr style="height: 29.7969px;"><td style="height: 29.7969px;">**Status**</td><td style="height: 29.7969px;">**Details**</td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;">**<span class="ts0">NotStarted</span>**</td><td style="height: 29.7969px;"><div>The job has been created but not yet begun. It is unmanaged and has no active work or progress. </div></td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;">**Started**</td><td style="height: 29.7969px;"><div>The job is in progress. This typically means managed lines have been added or work has commenced. </div></td></tr><tr style="height: 57.7812px;"><td style="height: 57.7812px;">**<span class="ts0">Completed</span>**</td><td style="height: 57.7812px;"><div>The job has been finished and closed.  
A final invoice will usually trigger the job to move to this status.</div></td></tr><tr style="height: 57.7812px;"><td style="height: 57.7812px;">**<span class="ts0">Closed</span>**</td><td style="height: 57.7812px;"><div>- The job has been manually closed.
- This may occur if the job is no longer required, the customer is no longer active, or costs (such as stock or labour) cannot be recovered.
- Jobs are closed using the **Job Close** function.

</div></td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;">**Cancelled**</td><td style="height: 29.7969px;">- <span class="ts0">Job is cancelled</span>
- <span class="ts0">Job created was a mistake</span>
- <span class="ts0">Job was NotStarted and needs to be taken off the list</span>

</td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;">**JobBOM**</td><td style="height: 29.7969px;"><div>The job is being used to produce a **Bill of Materials**.  
In this case, the job acts like a “recipe” to build or assemble a final product from components.</div></td></tr><tr style="height: 29.7969px;"><td style="height: 29.7969px;">**InProcessing**</td><td style="height: 29.7969px;"><div>An error has occurred while completing the job, usually during invoicing.  
These jobs should be reviewed and corrected.  
To resolve, manually close the job and update the status to **Completed**, **Closed**, or **Cancelled** as appropriate.</div></td></tr></tbody></table>

When running reports, you can filter jobs based on their status, such as **Started** or **Completed**.

<div id="bkmrk-started-jobs-%E2%80%93-these">- **Started Jobs** – These are active jobs that are currently in progress
- **Completed Jobs** – These are jobs that have been finished and closed

</div>This allows for accurate tracking of work in progress versus completed work.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3733).png)

---

##### **Correcting an Incorrect Job Status**

If a job has been closed or marked with the wrong status, it can be corrected by updating the job status.

<div id="bkmrk-you-can-toggle-betwe">- You can **toggle between Closed and Completed** as required
- To make this change, navigate to **Job History** and update the status accordingly

</div>This ensures the job reflects the correct stage for accurate tracking and reporting.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3734).png)

<span class="ts0"> </span>

---

#####  

##### **In Processing Status Change**

This status occurs when an issue arises during invoicing, preventing the job from being completed.

Typically, the invoice has processed correctly, but the job has failed to update to a completed status.

To correct this:

<div id="bkmrk-manually-close-the-j">- Manually **close the job**
- Update the status to **Completed**

</div>This ensures the job is properly finalised for accurate reporting and tracking.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2023-10/scaled-1680-/6Ryimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2023-10/6Ryimage.png)

<span class="ts0"> </span>

<span class="ts0"> </span>

---

#####  

##### **<span class="ts15">Job Manage status search</span>**

<span style="color: rgb(45, 194, 107);">**<span class="ts15">Job Costing &gt; Activity &gt; Manage Job</span>**</span>

<span class="ts0">Due date colours is based on Completion date to current date</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2258).png)

---

##### **Job Status Line Due Date**

<span style="color: rgb(45, 194, 107);">**<span class="ts15">Job Costing &gt; Activity &gt; Manage Job</span>**</span>

Due date colours are based on the **Completion Date compared to the current date**.  
These visual indicators help quickly identify whether a job is on track, approaching its deadline, or overdue.

<div id="bkmrk-icon-details%C2%A0-past-3"><table class="tbl1"><tbody><tr class="row0"><td class="cell0"><span class="ts11">Icon</span>

</td><td class="cell1"><span class="ts14">Details</span><span class="ts14"> </span>

</td></tr><tr class="row0"><td class="cell2">![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2869).png)

</td><td class="cell3"><span class="ts12">Past 30 days from Due date based on current date</span><span class="ts12"> </span>

</td></tr><tr class="row0"><td class="cell2">![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2883).png)

</td><td class="cell3"><span class="ts12">Before 30 days from due date based on current date</span><span class="ts12"> </span>

</td></tr><tr class="row0"><td class="cell2">![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2882).png)

</td><td class="cell3"><span class="ts12">Past 7 days from the Due date based on current date</span><span class="ts12"> </span>

</td></tr><tr class="row0"><td class="cell2">![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2893).png)

</td><td class="cell3"><span class="ts12">Due date is on today’s date</span><span class="ts12"> </span>

</td></tr><tr class="row0"><td class="cell2">![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2881).png)

</td><td class="cell3"><span class="ts12">Future 7 days from current date to due date</span><span class="ts12"> </span>

</td></tr><tr class="row0"><td class="cell2">![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2864).png)

</td><td class="cell3"><span class="ts12">Anything after 7 days up to 30 days in the future</span><span class="ts12"> </span>

</td></tr><tr class="row0"><td class="cell2">![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2867).png)

</td><td class="cell3"><span class="ts12">After 30 days in the future</span><span class="ts12"> </span>

</td></tr></tbody></table>

</div><div id="bkmrk--6"></div><span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2955).png)

---

##### **Job Status Lines Indicators**

<span style="color: rgb(45, 194, 107);">**<span class="ts15">Job Costing &gt; Activity &gt; Manage Job</span>**</span>

Line statuses provide a clear visual way to track progress by comparing planned (budgeted) quantities against actual usage, while also indicating whether a line has been completed. These colour-coded indicators make it easy to quickly see if a line is on track, completed, or exceeding plan.

<div id="bkmrk-icon-%C2%A0-details%C2%A0-not-"><table class="tbl1"><tbody><tr class="row0"><td class="cell0"><span class="ts11">Icon</span>

</td><td class="cell6"></td><td class="cell7"><span class="ts14">Details</span><span class="ts14"> </span>

</td></tr><tr class="row0"><td class="cell2">![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2872).png)

</td><td class="cell8"><span class="ts0">Not Started</span>

</td><td class="cell9">No activity has been recorded on the line.

<div>- No quantities have been allocated or processed
- The line has not been worked on yet
- Serves as a clear indicator that action is still required

</div></td></tr><tr class="row0"><td class="cell2">![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2873).png)

</td><td class="cell8"><span class="ts0">In Progress</span>

</td><td class="cell9">**In Progress (Green)**  
Work has begun and the line is actively being managed.

<div>- Quantities are being used or updated
- Actual usage is still below the budgeted amount
- Indicates the job is progressing as planned

</div></td></tr><tr class="row0"><td class="cell2">![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2956).png)

</td><td class="cell8"><span class="ts0">Qty Reached</span>

</td><td class="cell9">**Qty Reached (Blue with Tick)**  
The planned work has been completed exactly as expected.

<div>- Actual quantity equals the budgeted quantity
- No overuse or shortfall
- The tick confirms the target has been met

</div></td></tr><tr class="row0"><td class="cell2">![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2957).png)

</td><td class="cell8"><span class="ts0">Qty Exceeded</span>

</td><td class="cell9">The line has gone beyond the original plan.

<div>- Actual quantity is greater than the budgeted amount
- May indicate additional usage, cost overruns, or scope changes
- Should be reviewed for accuracy or approval

</div></td></tr><tr class="row0"><td class="cell2">![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2958).png)

</td><td class="cell8"><span class="ts0">Is Complete</span>

</td><td class="cell9">The line has been manually marked as finished.

<div>- No further updates are expected
- Confirms the line is finalised, regardless of quantities

</div></td></tr></tbody></table>

</div>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2955).png)

---

##### **Manage Line Status Indicators**

**<span class="ts2">Job Line Status Word</span>**

<span style="color: rgb(45, 194, 107);">**<span class="ts15">Job Costing &gt; Activity &gt; Manage Job</span>**</span>

<span class="ts0"> </span><span class="ts0">Line status comes in three types</span>

### **Line Status Types**

<div id="bkmrk-not-started-%28red%29the">- **Not Started (Red)**  
    The line has not yet been actioned. No work or quantities have been recorded.
- **Started (Green)**  
    The line is actively in progress. Work has begun and is being managed.
- **Completed (Blue)**  
    The line has been finished. All required work has been completed and marked accordingly.

</div><span class="ts0"> </span><span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2261).png)

# Print Job Card

<span style="color: rgb(45, 194, 107);">**<span class="ts15">Job Costing&gt; Activity&gt; Quotation</span><span class="ts15">&gt; Print /Export</span>**</span>

<span class="ts0">Select A quote that has a job number and select print job Card form the drop-down arrow.</span>

<span class="ts15"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(54).png)

<span class="ts0"> </span>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/JTvimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/JTvimage.png)

---

#### Print Service Card

<span style="color: rgb(45, 194, 107);">**<span class="ts15">Job Costing &gt; Activity&gt; Quotation</span><span class="ts15">&gt; Print /Export</span>**</span>

<table border="1" id="bkmrk-print-a-service-card"><colgroup><col></col><col></col></colgroup><tbody><tr><td><span class="ts0">Print a service card</span></td><td><span class="ts0">Select a quote with a job number and print a service card from the drop-down menu</span></td></tr></tbody></table>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(56).png)

---

#### Print Job Header

<span class="ts2">Select Job Header Print Help</span>

**<span style="color: rgb(45, 194, 107);"><span class="ts15">Job Costing &gt; Activity&gt; Quotation</span><span class="ts15">&gt; Print /Export</span></span>**

<table border="1" id="bkmrk-generate-generates-a"><colgroup><col></col><col></col></colgroup><tbody><tr><td><span class="ts7">Generate</span></td><td><span class="ts7">Generates a print layout according to the information contained in that specific Job History Item</span></td></tr></tbody></table>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(50).png)

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(51).png)

# Changing the Warehouse on Job Lines

There may be instances where an incorrect warehouse has been selected on a job line and needs to be updated.

To change the warehouse, access the line through the **Job Detail Line** button and make the required update.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2453).png)

<span class="ts0"> </span>Return to the **Job Lines** screen.

- Locate the job line with the incorrect warehouse.
- Select (highlight) the relevant line.
- Click the **Job Detail** button.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2454).png)

- <span class="ts0"> </span>Highlight the job line you want to change.
- Click the **Edit Split** button.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2456).png)

- <span class="ts0"> </span>Update the **Warehouse** field as required.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2457).png)

<span class="ts0"> </span>

<span class="ts0"> </span>

<span class="ts0"></span>

# Change customer on Job

<span style="color: rgb(45, 194, 107);">**System Configuration &gt; Security &gt; System Utilities**</span>

The system provides a utility that allows you to **change the customer on an existing job**, provided certain conditions are met.

<div id="bkmrk-the-customer-can%C2%A0onl">- <div>The customer can **only be changed if NO invoices have been created or processed** against the job.</div>
- <div></div>If invoices exist, this utility will not be applicable.

</div>How to:

<div id="bkmrk-double-click-on-the-">- Double click on the "**Change Customer on Job**" utility

</div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/NMmimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/NMmimage.png)

You will get a prompt that to confirm you want to change the customer.

- Click "**Yes**"

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/XDtimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/XDtimage.png)

- Select the **job number** you want to change
- Select the **New Customer**
- Click "**Change"**

["![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/mTDimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/mTDimage.png)

you will then get a pop up to say that the customer has been updated

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/8rGimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/8rGimage.png)

# Reassign Job and Editing of the Cost Price

Double-click a **Job** to open it. Within the job, double-click a **job line** to edit or reassign it.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/S8Kimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/S8Kimage.png)

<div id="bkmrk-allows-you-to-edit-t">- Allows you to edit the **cost price** of a managed line
- Allows you to **reassign the job line** to another parent line
- Allows you to change the **employee assigned** to the managed line

</div><div id="bkmrk--1"></div>##### **Restrictions**

You cannot edit the line if:

<div id="bkmrk-the-line-is-locked-t">1. The line is **locked**
2. The item has been marked for **invoice or delivery note**

</div>You cannot change **cost or quantity** if the item is a:

<div id="bkmrk-stock-item-fixed-ass">- **Stock item**
- **Fixed asset**

</div><div id="bkmrk--2"></div>##### **Reassignment Rules (Sell Price)**

When reassigning to a new parent:

<div id="bkmrk-the-line-will-adopt-">- The line will adopt the **sell price of the new parent**
- If the item is a **stock category (SC) or quote line**, it will use its own **sell price**
- If the new parent is a **Cost to Company (CTC)** item, the **sell price will be removed** from the line

</div>

# Create Reminder

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/iOSimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/iOSimage.png)

The **“Create Reminder”** button (highlighted with the bell icon in the top toolbar) is used to set up reminders for a job.

When you click this button, it allows you to:

<div id="bkmrk-schedule-a-follow-up">- Schedule a **follow-up action**
- Set a **date and time** for the reminder
- Add notes about what needs to be done
- Ensure important tasks or jobs are not missed

</div>This is especially useful for:

<div id="bkmrk-following-up-with-cu">- Following up with customers
- Checking on job progress
- Reminding yourself to complete outstanding tasks

</div>This screen is where you **set up and manage a reminder for a job**.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/IzLimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/IzLimage.png)

<table border="1" id="bkmrk-reminder-date-select" style="border-collapse: collapse; width: 100%;"><colgroup><col style="width: 50.053%;"></col><col style="width: 50.053%;"></col></colgroup><tbody><tr><td><div>Reminder No</div></td><td><div>A unique reference number generated by the system. </div></td></tr><tr><td><div><div>**Complete?**  
</div></div></td><td>Tick once the reminder has been actioned.

</td></tr><tr><td>**Reminder Date**</td><td>Select the date you would like the reminder to trigger.</td></tr><tr><td><div>**Customer / Supplier**  
</div></td><td><div>Link the reminder if required. </div></td></tr><tr><td><div>**Created Date**</div></td><td><div>This will be the date the reminder is created</div></td></tr><tr><td><div><div>**Reminder Date**  
</div></div></td><td><div><div>Select the date you would like the reminder to trigger. </div></div></td></tr><tr><td><div><div><div>Reminder Type</div></div></div></td><td><div><div><div>Automatically links the reminder to the job (e.g. *Reminder for Job – JOB5312*). </div></div></div></td></tr><tr><td>**Reminder To**</td><td>Choose who the reminder will be assigned to (e.g. a user, team, or department).</td></tr><tr><td>**Add Recipients**</td><td>Optional – add additional people who should also receive the reminder.

Once you click **“Add Recipients”** and select a recipient:

<div>- These fields will **automatically become active**
- The system will then: 
    - Populate the **Contact Person**
    - Display or allow entry of the **Cell Number**
    - Display or allow entry of the **Email address**

</div></td></tr><tr><td>**Message Choice**</td><td>- Select how the reminder will be delivered:
    
    
    - **Normal** (system alert)
    - **SMS**
    - **Email**

</td></tr><tr><td>**Restrict View**</td><td>  
</td></tr><tr><td><div>Reminder From</div></td><td><div>The user or team creating the reminder. </div></td></tr><tr><td>**Interactive Type**</td><td>This field is used to **categorise the type of reminder or follow-up** so it can be tracked and filtered more easily.

You can select from the following options:

<div>- **Clients** – General client-related follow-ups
- **Email** – When the reminder relates to sending or responding to an email
- **General** – For standard or uncategorised tasks
- **Leads** – Follow-ups related to new business or opportunities
- **Meeting** – Reminders for scheduled meetings
- **Sales** – Sales-related tasks or follow-ups
- **Telephone Calls** – When a call needs to be made
- **URGENT** – High-priority items that require immediate attention

</div></td></tr><tr><td>**Job No. Link**</td><td>This automatically links the reminder to the job you created it from.</td></tr><tr><td>**Reference**</td><td>Enter a short title or subject for the reminder.</td></tr><tr><td>**Description**</td><td>Add detailed notes about what needs to be done or followed up.</td></tr></tbody></table>

# Sub Job Link

This section allows you to create a **sub-job** linked to a main job.

The sub-job retains the original job number, with an extension added (e.g. *.1*) to indicate that it forms part of the main job. This helps group related work under a single job structure while still tracking each component separately.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2819).png)

<span class="ts0"> </span> Follow the steps to create a **Sub Job** linked to the main job.

When created, the system will automatically assign a sub-job number based on the main job—for example:

<div id="bkmrk-main-job%3A-job15-sub-">- **Main Job:** Job15
- **Sub Job:** Job15.1

</div>This numbering structure clearly indicates that the sub-job forms part of the main job while allowing it to be managed and tracked independently.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2820).png)

# Job Expense Cashbook

Job expenses are linked directly to the **General Ledger cashbooks**, ensuring that all job-related costs are accurately recorded.

These expenses are captured through entries in the **General Ledger cashbook lines**, allowing costs such as purchases, travel, or miscellaneous expenses to be allocated to a specific job for proper tracking and reporting.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2406).png)

<span class="ts0"> </span>After clicking **Next**, you can assign the cashbook line to a specific job.

<div id="bkmrk-select-the-relevant-">- Select the relevant **Job** to ensure the expense is correctly allocated
- Ensure a **Job Service Item** is entered, as this determines how the cost is recorded against the job line

</div>This step ensures that all expenses are properly linked to the job and accurately reflected in job costing and reporting.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2407).png)

<span class="ts0"> </span>Once processed, the expense will be added to the job under the **Expense category**.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2408).png)

<span class="ts0"> </span>When reviewing the job detail line, the expense will display key information linked to the job:

<div id="bkmrk-a-note-describing-th">- A **note** describing the expense
- A **usage quantity of 1**, indicating a single expense entry
- The **cost price**, showing the value allocated to the job

</div>This provides clear visibility of how the expense has been recorded and applied within the job.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2409).png)

<span class="ts0"> </span>

<span class="ts0"> </span>

<span class="ts0"></span>

# Job Costing Sell Value

#### <span style="color: rgb(0, 0, 0);">Job Search</span>

**<span style="color: rgb(45, 194, 107);">Job Costing Module &gt; Activity &gt; Manage Job </span>**

In the past, we never used to show values on the manage job screen.

We now show values on the top bar and on the grid.

The top bar shows the total budget, Total Actual and Total Invoice

This allows you to easily manage job costing values on the job search screen.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2024-01/scaled-1680-/HKTimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2024-01/HKTimage.png)

Job values are also showing on the manage job grid as shown below:

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2024-01/scaled-1680-/UVGimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2024-01/UVGimage.png)

The job values also show on the job lines and job history making it easy to manage jobs and all the selling prices.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2024-01/scaled-1680-/eeYimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2024-01/eeYimage.png)

# Job Expense Supplier Journal

Job expenses are directly linked to the **Supplier Journal (Creditors Journal)**, allowing costs entered through supplier invoices or journals to be allocated to specific jobs.

For this functionality to work correctly, the appropriate setup must be completed in **Links Maintenance**.

<span style="color: rgb(45, 194, 107);">**System Configuration &gt; General Ledger Links &gt; Links Maintenance &gt; Groups tab**</span>

Within the **Edit GL Group Link** window, the following options must be configured:

**Allow Journal To Job**

<div id="bkmrk-this-must-be-ticked-">- This must be **ticked** to enable supplier journals to be allocated to jobs.
- If not enabled, job costing from supplier journals will not be available.

**Purchases**</div><div id="bkmrk-this-should-be-ticke">- This should be **ticked** to indicate that the group is used for purchase-related transactions.

</div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/MITimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/MITimage.png)

# Stock Recovered Costs

<span class="ts0">Stock recovered costs are created from stock items that cannot be un managed from the job.</span>

<span class="ts0">The stock item will be returned back on job via a stock level adjustment.</span>

<span class="ts0">The value of the stock item will be added to the job as a custom item called stock recovered costs.</span>

<span class="ts0">The quantity will be the same as the quantity of stock returned as a postive figure.</span>

<span class="ts0">The value of the stock item will be the recovered cost on the job as a negative value.</span>

<span class="ts0"> </span>

<span class="ts0">See </span>[stock request return to job](https://hugeerp0.co.za/csp/webhelp/topics/idh-topic11180.htm)<span class="ts0"> processes under inventory module</span>

# Job Costing stock write off and Gain and Loss balance

##### **Stock Write-Off &amp; GL Allocation**

When closing a job and writing off stock, the associated cost must be correctly allocated in the General Ledger (GL).

To ensure accurate financial reporting, the write-off should be posted to the **Cost of Sales** account using the GL code:  
**“Job Costing Stock Write Off.”**

This ensures that any unrecovered stock used on the job is properly accounted for as a cost to the business.

<span class="ts0"> </span><span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3524).png)


##### **Setup a new GL link and GL Link setup**

To correctly account for stock written off during job closure, a dedicated GL link must be configured.

<div id="bkmrk-gl-link-code%3A-jobstk">- **GL Link Code:** `JOBSTKWRITEOFF`
- **Description:** *Job Costing Stock Write-Off*

</div>This link should be assigned to the appropriate **Cost of Sales** account in the General Ledger.

Setting this up ensures that any stock written off is accurately recorded as a cost to the business, maintaining correct financial reporting and audit tracking.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3519).png)


##### **Group Link**

A Group Link must be created to support stock write-offs during job closure.

<div id="bkmrk-document-type%3A-job-c">- **Document Type:** *Job Close Stock Write Off*
- **Code:** `JOBWRITEOFF`
- **Description:** *Job Costing Stock Write Off*

</div>This setup ensures that when stock is written off during job closure, the transaction is correctly recorded and linked to the appropriate GL account for accurate costing and reporting.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3520).png)

<span class="ts0"> </span>

##### **<span class="ts0">Link GL Links</span>**

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3521).png)

##### **<span class="ts0">Create Link under SCM</span>**

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3522).png)

<span class="ts0"> </span>

##### **Job Close &amp; Stock Write-Off Process**

When closing a job and processing the final invoice, any stock write-offs must be recorded using the newly created GL link.

<div id="bkmrk-continue-to-use-the-">- Continue to use the **Stock Journal Adjustment** process
- However, ensure the GL link **JOBSTKWRITEOFF (Job Costing Stock Write Off)** is selected

</div>This ensures that any unrecovered stock from the job is correctly posted to the **Cost of Sales**, maintaining accurate financial reporting and job costing.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2294).png)

<span class="ts0"> </span><span class="ts0"> </span>

##### **Percentage Invoice – WIP Correction**

This process applies specifically to **final percentage-based job invoices**.

It is used to correct any variance between the **Work in Progress (WIP) Ledger account** and the **stock write-off value** when completing a job. These differences can occur due to timing, usage, or costing variations throughout the job lifecycle.

To support this correction, a **new GL account** must be set up and used during the final invoicing stage. This ensures that:

<div id="bkmrk-wip-balances-are-cle">- WIP balances are cleared correctly
- Stock write-offs are accurately reflected
- Financial reporting remains balanced and accurate

</div><span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3523).png)

<span class="ts0"> </span>

##### **GL Link Setup – Job Gain / Loss**

To manage any differences identified during final job invoicing, a new GL link must be created.

<div id="bkmrk-gl-link-code%3A-jobgai">- **GL Link Code:** `JOBGAINLOSS`
- **Description:** *Job Costing Gain or Loss*

</div>This link is used to account for any variance between expected and actual job costs (gain or loss), ensuring these differences are accurately recorded in the General Ledger.

This helps maintain clean financial reporting and proper reconciliation when closing jobs.

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3525).png)


##### **GL Link Group – Job WIP Correction**

A new **Document Type** must be created to support WIP corrections during job finalisation.

<div id="bkmrk-document-type%3A-job-w">- **Document Type:** *Job WIP Correction*

</div>This document type is used to group and process adjustments required to correct differences between **Work in Progress (WIP)** and actual job costs when completing percentage-based jobs.

It ensures all WIP correction entries are clearly recorded, tracked, and linked to the appropriate GL accounts for accurate financial reporting.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3526).png)

<span class="ts0"> </span><span class="ts0"> </span><span class="ts0"> </span>

##### **<span class="ts0">GL Link</span>**

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3527).png)

<span class="ts0"> </span>

##### **GL Link SCM Setup – Job WIP Correction**

A new GL link must be created within the **SCM (Supply Chain Management) setup** to support WIP corrections during job finalisation.

<div id="bkmrk-gl-link%3A-job-wip-cor">- **GL Link:** *Job WIP Correction*

</div>This link is used when processing adjustments between **Work in Progress (WIP)** and actual job costs, particularly for percentage-based invoicing.

It ensures that any corrections are accurately recorded and aligned with the correct GL accounts, supporting proper reconciliation and financial reporting.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3522).png)


##### **<span class="ts0"> </span><span class="ts0">Example</span>**

- <span class="ts0">Quote Created</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2300).png)

- <span class="ts0"> </span><span class="ts0">Do first invoice – half</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2301).png)

- <span class="ts0"> </span><span class="ts0"> </span><span class="ts0">Invoice posting</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2302).png)

- <span class="ts0"> </span><span class="ts0">T-Accounts</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2303).png)

- <span class="ts0"> </span><span class="ts0"> </span><span class="ts0">Lines are managed, but more costs are added</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2304).png)

<span class="ts0"> </span><span class="ts0">This means that the job has exceeded by R160-03</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2305).png)

**Second Invoice**

A second invoice was processed without managing the remaining lines, resulting in increased profit.

<div id="bkmrk-the-wip-account-now-">- The **WIP Account** now reflects **R800.00**
- The **Stock Write-Off** totals **R560.04**
- This creates a **difference of R239.96**, representing the variance remaining in the WIP account

</div><span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2306).png)

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2307).png)

- **WIP Balance Correction**

The balance in the **WIP account must be adjusted** when there is a difference between WIP and actual job costs. This typically occurs when the **WIP value is higher than the actual costs recorded**.

<div id="bkmrk-if-wip-is-higher-%28ad">**If WIP is Higher (Adjust Down):**</div><div id="bkmrk-debit%3A-wip-%E2%80%93-r239.96">- **Debit:** WIP – R239.96
- **Credit:** Cost of Sales – Job Gain/Loss – R239.96

**If Actual Costs are Higher (Adjust Up – Default GL Behaviour):**</div><div id="bkmrk-debit%3A-cost-of-sales">- **Debit:** Cost of Sales – Job Gain/Loss – R239.96
- **Credit:** WIP – R239.96

**Explanation**</div>To determine the correct adjustment:

<div id="bkmrk-calculate-all-estima">- Calculate all estimated values posted to the **WIP account** for the job
- Compare these to the actual costs posted to **Cost of Sales (COS)**
- Identify the difference and process the adjustment accordingly

</div>This ensures the WIP account is accurately balanced and reflects the true cost of the job compared to the original estimates.

<span class="ts0"></span>

# Take On Values for Job

### Taking on Values for a Job

<div id="bkmrk-create-a-sub-quote-g">1. **Create a Sub Quote**
    
    
    - Generate a sub-quote from the existing job, using the closing balances for both cost and selling values completed to date.
2. **Set Up an Inventory Item**
    
    
    - Create a new custom inventory item called:  
        **XJOB/OB – X Job Cost Opening Balance**
    - Use this item code on the quote lines.
3. **Structure the Quote Lines**
    
    
    - Divide the quote into two lines (using the same inventory code): 
        1. Costs and sales related to all previously invoiced documents to date.
        2. Costs and sales representing the remaining balance compared to the total job budget.
4. **Validate Totals**
    
    
    - For existing jobs, ensure that: 
        - The two calculated values above, plus any new values,  
            **equal the total estimated cost and selling value of the job.**
5. **Push Quote to Job**
    
    
    - Once the quote is created and applied to the job: 
        - Manage the quote lines so that costs and sales are correctly reflected in the Job WIP (Work in Progress) reports.
6. **Raise Customer Invoice**
    
    
    - Create a customer invoice for the opening balance lines.
    - Process the invoice to reflect completion, ensuring: 
        - No VAT/GST is applied.
7. **Post to Suspense Account**
    
    
    - Allow the invoice to prompt for posting.
    - Adjust the ledger so that it posts to the **Take-On Suspense Account**.
8. **Balance the Customer Account**
    
    
    - Create a customer journal transaction to balance the account.
    - Offset the entry against the Take-On Suspense Account.
    - Allocate the journal and invoice together.
9. **Invoice Numbering**
    
    
    - Change the invoice reference format to: **JOBOB + sequential number (starting from 100)**
10. **Processing Timing**
    
    
    - Perform this process **outside of normal production hours** to prevent interference with regular invoice processing using the temporary numbering.
11. **Restore Invoice Sequence**
    
    
    - After completion, revert the invoice numbering sequence back to the standard range.

</div>

# Creating a New Job

# New Job Button

##### **New Job Button**

The **New Job** button is used to create a job directly, without first creating or promoting a quote.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/ZAOimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/ZAOimage.png)

When this option is selected, a new job is started “on the fly,” allowing users to quickly set up and begin working on a job straight away.

<div id="bkmrk-direct-job-creation-">- **Direct Job Creation** – Create a job immediately without needing an existing quote
- **Automatic Background Process** – The system will automatically create a blank quote in the background
- **Linked Records** – This quote is linked to the job and can be accessed later under the **Quotes** section
- **Flexible Workflow** – Ideal for situations where work needs to begin quickly without following the full quote-to-job process

</div>##### Creating a New Job Process:

- Click **New Job**
- **Complete relevant forms**

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/RYuimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/RYuimage.png)

<table border="1" id="bkmrk-customer-select-the-"><colgroup><col></col><col></col></colgroup><tbody><tr><td><div>**Customer**</div></td><td><div>Select the customer the job is for</div></td></tr><tr><td><div>**Customer Name**</div></td><td><div>Displays the name of the selected custome</div></td></tr><tr><td><div>**Contact Person**</div></td><td><div>Choose the relevant contact for the job</div></td></tr><tr><td><div>**Description**</div></td><td><div>Enter a short description or title for the job</div></td></tr><tr><td><div>**Division**</div></td><td><div>Assign the job to a specific business division</div></td></tr><tr><td><div>**Reference**</div></td><td><div>Add a reference number if applicable (e.g., customer reference)</div></td></tr><tr><td><div>**Region**</div></td><td><div>Select the region or branch responsible for the job</div></td></tr><tr><td><div>**Sales Rep**</div></td><td><div>Assign the job to a sales representative</div></td></tr><tr><td>**Invoice Group**</td><td><div>Specify how the job will be grouped for invoicing</div></td></tr><tr><td><div>**Asset Item**</div></td><td><div>Link the job to a specific asset if required</div></td></tr><tr><td><div><div>**Long Description**</div></div></td><td><div><div>Enter a more detailed description of the job</div></div></td></tr></tbody></table>

<div id="bkmrk-once-you-have-added-">Once you have added your information, select how you would like to proceed.</div><div id="bkmrk--1"></div><div id="bkmrk--2"></div><div id="bkmrk--3"></div><div id="bkmrk--4"></div>- **Continue** – Proceeds to the next step and creates the job
- **Cancel** – Exits without saving

<div id="bkmrk--5"></div><div id="bkmrk--6"></div><div id="bkmrk--7"></div><div id="bkmrk--8"></div>This screen appears after clicking **Continue** when creating a new job. It is used to **finalise and approve the job setup**, converting the automatically created quote into an active job.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/SLzimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/SLzimage.png)

<div id="bkmrk-job-details-section">**Job Details Section**</div>This screen displays and confirms the key information for the job:

<div id="bkmrk-quote-number-%2F-quote">- **Quote Number / Quote Date** – Auto-generated by the system when the job was created
- **Customer** – The customer linked to the job which is Auto populated
- **Branch** – The branch the job is assigned to
- **Description / Long Description** – The job description entered earlier
- <div>**Order Number (Compulsory Field)** – The **Order Number** must be entered before proceeding. The system will not allow you to continue or complete the job setup until this field has been filled in.</div>

</div><div id="bkmrk--10"></div><div id="bkmrk--11"></div><div id="bkmrk--12"></div><div id="bkmrk-job-setup-options">**Job Setup Options**</div><div id="bkmrk--13"></div>These fields allow you to define how the job will be managed:

<div id="bkmrk-team-%E2%80%93-assigns-the-j">- **Team** – Assigns the job to a specific team
- **Employee / Department / Function** – Further allocation of responsibility
- **Estimated Start Date &amp; Hours** – Defines when the job will begin and initial time allocation
- **Group Activity** – Assigns the job to a specific workflow or activity group
- **Completion Date** – Expected job completion
- **Delivery Date** – When the job is due for delivery

</div><div id="bkmrk--14"></div><div id="bkmrk--15"></div><div id="bkmrk--16"></div><div id="bkmrk-additional-settings-">**Additional Settings (Tick Boxes)**</div><div id="bkmrk--17"></div>These options control how the job behaves:

<div id="bkmrk-allow-to-exceed-quot">- **Allow to Exceed Quote Value** – Permits costs to go over the quoted amount
- **Allow to Exceed Budget Qty** – Allows quantities to exceed planned amounts
- **Activate Report Dates** – Enables tracking of reporting dates
- **Use Build Task Defaults** – Applies predefined task templates
- **Charge Up (SC)** – Enables charge-up costing
- **Prepriced (CTC)** – Indicates the job uses predefined pricing
- **Assembly / Lock Employee** – Controls job structure and assignment restrictions

  
</div>**Other Fields**

<div id="bkmrk-warehouse-%E2%80%93-select-t">- **Warehouse** – Select the warehouse linked to the job
- **Job Link** – Links this job to another job if required
- **Create PO Drop Ship** – Option to create purchase orders for direct delivery

</div><div id="bkmrk--18"></div><div id="bkmrk--20"></div><div id="bkmrk-action-buttons">**Action Buttons**</div><div id="bkmrk-continue-%E2%80%93-confirms-">- **Continue** – Confirms and completes the job creation
- **Close** – Exits without proceeding

</div>

# Planned Time Log Schedule

# Job Schedule Activity

# Job Schedule Activity

##### Job Schedule Activity Screen Overview 

<span class="ts10">Video training manual 2021 - </span>[Click Here](https://vimeo.com/657219400)

The **Job Schedule Activity** screen provides a comprehensive, multi-view overview of all jobs, allowing you to monitor progress, manage schedules, and optimise resources from a single location.

Using the tabs available, you can view and manage jobs from different perspectives:

<div id="bkmrk-job-activities-%E2%80%93-dis">- **Job Activities** – Displays detailed task breakdowns per job, giving full visibility of the work required.
- **Job Schedule** – Provides a high-level timeline view of all jobs, helping you see when work is planned, identify overlaps or gaps, and adjust schedules to keep jobs on track for completion.
- **Employee Schedule** – Shows how work is allocated across individual employees, allowing you to identify who is busy, who may be overloaded, and who has capacity to assist.
- **Team Schedule** – Displays how teams are assigned to jobs and tasks, supporting team-based planning and workload balancing.
- **Employee Tasks** – Provides a task-level view for each employee, giving a more detailed breakdown of individual responsibilities

</div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/KYtimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/KYtimage.png)

---

##### **Job Schedule Activity – Overview Screen**

This screen provides a **comprehensive overview of all current and future jobs**, allowing you to monitor progress, track statuses, and manage workload across teams.

**Summary**

<div id="bkmrk-provides-an-overview">- Provides an overview of all job activities and task statuses
- Shows job progress, timing, and team allocation
- Highlights tasks that require attention
- Supports monitoring of current and upcoming work

</div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/HBFimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/HBFimage.png)

**- Job List Overview**

<div id="bkmrk-each-row-represents-">- Each row represents a **job task or activity** linked to a job.
- It includes key details such as: 
    - **Job Number**
    - **Quote Number**
    - **Team assigned**
    - **Estimated start date**
    - **Job description**

**- Status Tracking (Key Feature)**</div>The screen gives a clear snapshot of where each job sits using multiple status columns:

<div id="bkmrk-job-status-started-%28">- **Job Status**
    
    
    - *Started* (green)
    - *Not Started* (red)
- **Task Status**
    
    
    - Indicates whether the specific task has begun
- **T-Status (Traffic Light Indicator)**
    
    
    - 🟢 Green = On track
    - 🔴 Red = Requires attention / delay
    - Provides a quick visual health check of the job

**- Team Allocation**</div><div id="bkmrk-the-team-code-and-te">- The **Team Code and Team Name** fields show which team is assigned to each job.
- This helps identify: 
    - Who is responsible
    - Workload per team

**- Time Visibility**</div><div id="bkmrk-the-estimated-start-">- The **Estimated Start Date** shows when jobs are planned to begin.
- This allows you to: 
    - View **upcoming work**
    - Identify **current active jobs**
    - Spot overlaps or scheduling conflicts

**- Filtering &amp; Search**</div>At the top of the screen, you can filter by:

<div id="bkmrk-job-number-quote-num">- Job Number
- Quote Number
- Job Description
- Date range

</div>This helps you focus on **specific jobs, time periods, or teams**.

<div id="bkmrk---how-it%E2%80%99s-used">**- How It’s Used**</div>This screen is typically used to:

<div id="bkmrk-monitor-all-jobs-in-">- Monitor **all jobs in one place** (current and future)
- Track **progress and status at a glance**
- Identify **delays or issues quickly**
- Review **team allocations and workload**
- Support planning decisions before using detailed scheduling screens

---

</div>##### **Job Schedule Screen Overview**

This screen provides a **timeline view of current and future jobs**, helping you track when jobs are planned to start and how they are spread over time.

**Summary**

<div id="bkmrk-provides-a-high-leve">- Provides a high-level timeline view of all jobs
- Highlights workload distribution, gaps, and overlaps
- Helps identify overbooking and capacity issues
- Supports planning and rescheduling to keep jobs on track

</div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/l70image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/l70image.png)

**What the Screen Shows**

**- Left Panel – Job Details**

Each row represents a **job**, with key information including:

<div id="bkmrk-name-%E2%80%93-job-number-an">- **Name** – Job number and short description
- **Job No** – Unique job reference
- **Estimated Start Date** – When the job is scheduled to begin
- **Customer Name** – Who the job is for
- **Description** – Summary of the work

**- Right Panel – Timeline (Gantt View)**</div><div id="bkmrk-displays-jobs-visual">- Displays jobs visually across a **calendar timeline (by month/quarter)**
- Each job is shown as a **blue bar**
- The position of the bar shows:
    
    
    - When the job is scheduled
    - How long the job is expected to run
- The **“Project Start” marker** highlights the beginning of the selected timeline period

**- Key Features**</div>**Visual Planning**

<div id="bkmrk-quickly-see-current-">- Quickly see **current jobs vs upcoming jobs**
- Identify gaps, overlaps, or busy periods

</div>**Timeline Scaling**

<div id="bkmrk-the-zoom-slider-allo">- The **Zoom slider** allows you to adjust how much detail is shown (more detail or broader view)

</div>**- Job Tracking**

<div id="bkmrk-easily-monitor%3A-jobs">- Easily monitor: 
    - Jobs starting soon
    - Jobs scheduled later in the year
    - Workload distribution over time

</div>**- Quick Navigation**

<div id="bkmrk-clicking-a-job-%28via-">- Clicking a job (via the arrow icon) allows you to **drill into job details**

**- How It’s Used**</div>This screen is ideal for:

<div id="bkmrk-high-level-planning-">- **High-level planning**
- Reviewing **future workload**
- Checking **job timing and sequencing**
- Supporting scheduling decisions before assigning teams/resources

</div>---

##### **Employee Schedule Screen Overview**

This screen provides a **resource-focused view of all employees and their allocated work**, helping you understand who is working on what, when, and how busy each person is.

**Summary**

<div id="bkmrk-displays-employee-wo">- Displays employee work allocation across a timeline
- Helps identify who is busy and who has capacity
- Supports workload balancing and resource planning
- Hover over tasks to view job details

</div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/L3jimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/L3jimage.png)

**What the Screen Shows**

**- Left Panel – Employees**

<div id="bkmrk-each-row-represents--2">- Each row represents an **individual employee/resource**
- Displays: 
    - Employee name
    - Profile icon
    - Number of scheduled **events/tasks**

</div>This allows you to quickly see **who is active and how much work is assigned**.

<div id="bkmrk---right-panel-%E2%80%93-time">**- Right Panel – Timeline Schedule**</div><div id="bkmrk-jobs-are-displayed-a">- Jobs are displayed as **coloured blocks across a calendar (by day/week)**
- Each block represents a **task assigned to that employee**
- The position and length of the block shows:
    
    
    - When the work is scheduled
    - How long the task will take
- Hovering over a block shows **job details** (e.g. job number, description, dates)

**- Key Features**</div>**Resource Visibility**

<div id="bkmrk-see-exactly-where-ea">- See exactly **where each employee is allocated**
- Understand what jobs each person is working on across the timeline

**- Workload Management**</div><div id="bkmrk-identify-employees-w">- Identify employees who: 
    - Have **too many tasks scheduled (overloaded)**
    - Have **gaps or light workloads (underutilised)**

</div>This makes it easy to balance work across the team.

<div id="bkmrk---support-%26-realloca">**- Support &amp; Reallocation**</div><div id="bkmrk-quickly-determine%3A-w">- Quickly determine: 
    - Who may **need assistance**
    - Who is available to **help on other jobs**

</div>This improves team efficiency and reduces delays.

<div id="bkmrk---visual-indicators">**- Visual Indicators**</div><div id="bkmrk-multiple-coloured-bl">- Multiple coloured blocks indicate **multiple tasks or longer workloads**
- Large clusters of blocks = **busy periods**
- Minimal or no blocks = **availability**

**- Zoom Control**</div><div id="bkmrk-adjust-the-zoom-slid">- Adjust the **Zoom slider** to view: 
    - Detailed daily schedules
    - Or a broader weekly overview

**- How It’s Used**</div>This screen is ideal for:

<div id="bkmrk-daily-and-weekly-pla">- **Daily and weekly planning**
- Monitoring **individual workloads**
- Balancing work across staff
- Ensuring no one is **overbooked or underutilised**
- Improving overall **resource efficiency**

</div><div id="bkmrk--7">---

</div>#### **Team Schedule Screen Overview**

This screen is used to **plan and manage team workloads across jobs and dates**. It provides a visual schedule that helps you track where each job sits and how teams are allocated over time.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/xWJimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/xWJimage.png)

**Key Features**

**- Team-Based Scheduling**

<div id="bkmrk-each-row-represents--3">- Each row represents a **team** (e.g. Team 1, Team 2, etc.).
- Jobs are assigned to teams and displayed as **coloured bars** across the calendar.

</div>**- Timeline View**

<div id="bkmrk-the-grid-is-organise">- The grid is organised by **days and weeks**, allowing you to see: 
    - When jobs are scheduled
    - How long each job will take
    - Any overlaps or gaps in scheduling

</div>**- Drag-and-Drop Functionality**

<div id="bkmrk-jobs-can-be-easily-m">- Jobs can be easily **moved between teams or dates** by dragging and dropping.
- This allows you to: 
    - Adjust schedules if a job is **running behind or ahead**
    - Reallocate work between teams to balance capacity
    - Quickly respond to changes in production or priorities

</div>**- Visual Job Tracking**

<div id="bkmrk-each-job-is-shown-as">- Each job is shown as a labelled block (e.g. *ROOFING – JOB1083*).
- The length of the block represents the **duration of the task**.
- Colours help visually distinguish between jobs or job types.

**- How It’s Used**</div>This screen is typically used by planners or managers to:

<div id="bkmrk-allocate-jobs-to-spe">- Allocate jobs to specific teams
- Monitor daily and weekly workloads
- Adjust schedules in real time
- Keep production aligned with deadlines

</div>---

#### **Employee Tasks Screen Overview**

The **Employee Tasks** screen provides a **detailed, task-level view of work assigned to each employee**, allowing you to track individual responsibilities, progress, and timing in a structured list format.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/ULfimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/ULfimage.png)

**What the Screen Shows**

Each row represents a **task assigned to an employee**, with key information including:

<div id="bkmrk-name-%E2%80%93-the-employee-">- **Name** – The employee assigned to the task
- **Assignment Date** – When the task is scheduled
- **Task Start &amp; End Dates** – Planned duration of the task
- **Day** – The day of the week the task falls on
- **Train Level** – Indicates skill level or proficiency of the employee
- **Job Status (J-Status)** – Shows whether the job is:
    
    
    - **Started** (green)
    - **Not Started** (red)
- **T-Status (Traffic Indicator)**
    
    
    - 🟢 Green = On track
    - 🔴 Red = Requires attention
- **Action** – The specific activity being performed (e.g. Roofing, Downpipes, Finishing)

**- Key Features**</div>**Detailed Task Visibility**

<div id="bkmrk-provides-a-clear-bre">- Provides a **clear breakdown of tasks per employee**
- Allows you to see exactly **what each person is doing on specific days**

**- Progress Tracking**</div><div id="bkmrk-monitor-whether-task">- Monitor whether tasks have been **started or not started**
- Use visual indicators to quickly identify **issues or delays**

**- Resource Allocation Insight**</div><div id="bkmrk-helps-you-understand">- Helps you understand: 
    - Who is working on which tasks
    - How work is distributed across employees
    - Whether tasks align with employee skill levels

**- Daily Planning Tool**</div><div id="bkmrk-the-structured-forma">- The structured format makes it ideal for: 
    - Reviewing **daily workloads**
    - Confirming task assignments
    - Ensuring all required work has been allocated

**- How It’s Used**</div>This screen is typically used for:

<div id="bkmrk-supervisors-or-manag">- **Supervisors or managers** to review and assign tasks
- Tracking **day-to-day execution of jobs**
- Ensuring all employees are correctly allocated to tasks
- Monitoring **task progress and completion readiness**

</div>

# Task activity import

<span class="ts0">Allow for all tasks to be updated via an import</span>

<span class="ts0"> </span><span class="ts0">Template can be found in SCM&gt; Imports &gt; Templates</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3336).png)

# Task Activity Managing

<span class="ts0">Managing a task activity allows one to do the following</span>

1.<span class="ts0">Change the activity description </span>

2.<span class="ts0">Assign a team to this activity </span>

3.<span class="ts0">They are three status's: not started ,started and completed </span>

4.<span class="ts0">They are multiple task types namely: main task, split task, sub task and milestone </span>

5.<span class="ts0">A task it's specified with a start date and an end date </span>

6.<span class="ts0">You can exclude Saturdays and Sundays when creating a resource linked to this task </span>

7.<span class="ts0">The task duration days workout they end date from the start date </span>

8.<span class="ts0">Lag days workout the number of days between the tasks </span>

9.<span class="ts0">Notes can be added to a task </span>

10.<span class="ts0">Comments can be added to the task </span>

11.<span class="ts0">A task can have a sell budget which is linked to the two percentages </span>

12.<span class="ts0">Job progress percentage is defined as the percentage of the task activity completed </span>

13.<span class="ts0">Invoiced percentage to date is defined as the percentage invoiced to date</span>

14.<span class="ts0">The value to invoiced is worked out between the difference of the percentage production and percentage invoice to the total sell budget</span>

15.<span class="ts0">Linked split tasks show all tasks that are linked to a main task</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3389).png)

<span class="ts0"> </span>

<span class="ts0"> </span>

<span class="ts0"> </span>

<span class="ts22">Enforce start date on task activity</span>

<span class="ts0"> </span>

<span class="ts0">Update Task activities in Manage job includes enforce start date</span>

<span class="ts0">1. Recalculate dates will start with estimated job start date and work out task activities from sequence one</span>

<span class="ts0">2. As soon as a task has the enforce tick on, this will not change this date and leave date as is</span>

<span class="ts0">3. Following tasks after a task activity with an enforce tick on, will recalculate lag days etc from new enforced date</span>

<span class="ts0">4. With each new enforce date, the system will recalculate subsequent tasks</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3538).png)

<span class="ts0"> </span>

<span class="ts0"> </span>

<span class="ts0"> </span>

<span class="ts22">Deleting a Task</span>

<span class="ts0"> </span>

<span class="ts0">To delete a task one would need to go into the manage job window in the scheduling tab.</span>

<span class="ts0">You can only delete a task if both percentages equal zero %</span>

<span class="ts0"> </span>

<span class="ts0">A split task can be deleted from the main tab of job scheduling , if both percentage is equal to zero .</span>

<span class="ts0">A main task can only be deleted from the manage job screen.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3390).png)

<span class="ts0"> </span>

<span class="ts0"> </span>

<span class="ts0">Deleting a task from Manage Job</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3391).png)

<span class="ts0"> </span>

<span class="ts0"> </span>

### <span class="ts89">Create default settings for splitting a task</span>

<span class="ts0"> </span>

<span class="ts0">Go to System Configuration &gt; General &gt; Defaults &gt; Job Costing Tab</span>

<span class="ts0"> </span>

[Click here to view settings](https://hugeerp0.co.za/csp/webhelp/topics/idh-topic12190.htm)

<span class="ts0"> </span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3901).png)

<span class="ts0"> </span>

<span class="ts0"> </span>

<span class="ts0"> </span>

<span class="ts0"> </span>

<span class="ts0"> </span>

<span class="ts0"> </span>

<span class="ts0"></span>

# Team Schedule

<span class="ts0">Team scheduling allows for planning task activities on teams</span>

<span class="ts0">Colours can be assigned to task activites as well as Teams</span>

<span class="ts0"> </span><span class="ts12">Team Colours </span><span class="ts12">can be assigned</span>

 <span class="ts12">Recommend changing Team names from Team Kevin to T- Kevin</span>

<span class="ts12">Task colours updated based on default task activity group</span>

 <span class="ts12">Recommend changing Task activity codes from ME-01 to </span><span class="ts12">as short name up to 5 to 6 characters MEAS for Measure</span>

 <span class="ts12">This because the schedule is reflect</span><span class="ts12">s</span><span class="ts12"> the code instead of the name, there is limited space to display information</span>

 <span class="ts12">Information is display – Task code – Job number – Customer short name – Job description</span>

<span class="ts12">Teams sequence number updated to force preview of teams in a specific order</span>

 <span class="ts12">Team schedule allows for zooming in to any period you want</span>

 <span class="ts12">Zoom 10 is good to view for 2 to 3 week period</span>

 <span class="ts12">Zoom 9 is good for 2 month view showing per day</span>

<span class="ts12">Tasks can be moved to another team</span>

 <span class="ts12">Click and drag to another team</span>

<span class="ts12">Tasks can be dragged to extend time of task</span>

 <span class="ts12">Move to another day</span>

 <span class="ts12">Click end of block to extend or reduce period</span>

<span class="ts12">Tasks can now be split</span>

<span class="ts12">Edit the Task to split with new dates</span>

 <span class="ts12">There will always be a Main task and then split tasks linked to the main task</span>

<span class="ts12">Week start dates when looking at the calendar is Monday to Sunday</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3854).png)

<span class="ts0"> </span><span class="ts12">Update customers with Short Name recommended</span>

 <span class="ts12">This short name is used in the Gantt chart and scheduling</span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3334).png)

# GRV To Job

# Time Tracker Export

# Job Total Analysis

# Time Logs to Jobs

# Time Logs incorrect on Job

<span class="ts12">Any time log can be changed if it is open including the customer and job number, if it has not gone to job.</span>

<span class="ts12">This means that if you selected the wrong customer, employee or job, you are able to change this.</span>

<span class="ts12">Time logs that were processed to a job but were incorrect.</span>

<span class="ts12">The time log is locked down as an audit entry was processed to a job.</span>

<span class="ts12">Process on how to reverse this.</span>

1.<span class="ts12">Go to the job that the time log was wrongly assigned.</span>

2.<span class="ts12">Double click on the time log and enter the negative quantity amount to reverse via Manage Line</span>

3.<span class="ts12">This removes the cost allocated to the job</span>

4.<span class="ts12">However the historical audit of adding and removing on the job will remain</span>

5.<span class="ts12">The costing on the job will then be correct</span>

6.<span class="ts12">Go to the CRM &gt; Activity &gt; Time logging</span>

7.<span class="ts12">Select the expand tab</span>

8.<span class="ts12">Select to view Show All time logs status</span>

9.<span class="ts12">Select via the tick boxes the time logs you want to reopen</span>

10.<span class="ts12">Go to the drop of the process button and click Open time logs</span>

11.<span class="ts12">This will open the lock on the time logs and you can make changes</span>

12.<span class="ts12">Once you have made your changes to Customer, Job Number, Time etc</span>

13.<span class="ts12">Select and process time logs to jobs like you have done before</span>

<span class="ts0">Open up locked time logs</span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2523).png)

<span class="ts0"></span>

# Bookins

# Book In integration with Asset Tracker

Bookin Integration with asset tracker allows you to book assets within job costing.

<span style="color: rgb(45, 194, 107);">**Job Costing module &gt; Activity &gt; Bookin**</span>

- Open the Job Costing module to find the integrated booking feature.
- Within Job Costing, locate the option to book assets.
- Choose the specific asset you want to book for a job.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2024-01/scaled-1680-/X15image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2024-01/X15image.png)

# Picking Slip

# Picking Slip

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1033).png)

<span class="ts0"> </span><span class="ts0">Add to Picking Slip</span>

<span class="ts0"> </span><span class="ts0">This Picking slip form allows the user to add items onto Job</span>

<span class="ts0">Add Button - to add an item</span>

<span class="ts0">edit Button - to edit an item</span>

<span class="ts0">Add per quote button - addall the items on job and move the lines to the bottom screen</span>

<span class="ts0">Remove button - remove the lines from picking slip</span>

<span class="ts0">Edit button - amend / make changes on the line</span>

<span class="ts0">close Button - close the form</span>

<span class="ts0">print button - print the picking slip.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1036).png)

<span class="ts0"> </span>

<span class="ts0">Select All – Selects all picking slips available.</span>

<span class="ts0">Print Pick Report – Prints a Picking Slip Report according to the information you or someone</span>

<span class="ts0">prior to you has entered.</span>

<span class="ts0">Save – Saves the current form.</span>

# Picking Slip Process

<span class="ts10">Video training manual 2016 - </span>[Click Here](https://vimeo.com/357005600)

**<span class="ts0"> </span><span class="ts15">Go to Job Costing Module &gt; Activity &gt; Manage Job</span>**

<span class="ts0">Once you have search for the job to manage, highlight job and click on Manage Job.</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2198).png)

<span class="ts0"> </span><span class="ts0">When the window has loaded click on All Job Lines to display job lines.</span>

<span class="ts0">There will be a tab called Picking Slip, click on the tab in the middle of the window.</span>

<span class="ts0">The bottom tab called Picking slip will also be displayed</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(2199).png)<span class="ts0">.</span>

<span class="ts0"> </span><span class="ts0">Buttons explained</span>

<span class="ts0">Add to Picking Slip – Adds a new picking slip</span>

<span class="ts0">Print – Print the picking slip</span>

<span class="ts0">Edit – You can edit a picking slip</span>

<span class="ts0">Picked – Allows one to allocate quantities to the picking slip, quantities that are picked.</span>

<span class="ts0">Manage Items – Allows one to manage the picking slip on the quantities picked, this moves the stock from on shelf to Job WIP.</span>

<span class="ts0">Close – Closes the picking slip.</span>

<span class="ts0">To add a new picking slip, click on the button called Add to Picking Slip.</span>

<span class="ts0">Click on the Add button at the top of the window, this will allow you to create a new picking slip and allocate a picking slip number,</span>

<span class="ts0"> </span><span class="ts0">A new window will come up so that you can name the picking slip. Click on Save and Close.</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1603).png)<span class="ts0"> </span>

<span class="ts0"> </span><span class="ts0">Once the Picking slip number and name has being allocated, highlight the stock item which you want to add to the picking slip and click on the Add button.</span>

<span class="ts0">Note:</span>

<span class="ts0">Only items which have being added to the job will appear in this section.</span>

<span class="ts0">When you have clicked on Add button, a new window will come up with the quantity that is add on the job line. Should this be different make your change to what needs to be picked.</span>

<span class="ts0">The stock line will move from the top column window to the bottom window</span>

<span class="ts0"> </span><span class="ts0"> </span><span class="ts0">Should you wish to remove the stock item from the list highlight the item and click on the remove button.</span>

<span class="ts0">OR maybe you need to change the quantity, highlight the item and click on the Edit button. Change the quantity and click OK.</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1583).png)

<span class="ts0"> </span><span class="ts0">Click on the Print button to print the picking slip.</span>

<span class="ts0">Click on the Close button to close the current window.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1584).png)

<span class="ts0">Note:</span>

<span class="ts0">Once the user clicks on the print button to print the document it will register the date and time of print.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1585).png)

<span class="ts0"> </span>

<span class="ts0">The user can Edit the picking slip again and make changes before the picking slip can be picked and managed.</span>

<span class="ts0">Picked button</span>

<span class="ts0"> </span>

<span class="ts0">Click on the Picked button to have the stock picked, this will bring up a new window. You can click on the Select All button to select all quantities that have being picked. OR change the quantities to what has being picked.</span>

<span class="ts0">Once the items have being picked the system will mark a date a time which has being picked.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1586).png)<span class="ts0"> </span>

<span class="ts0"> </span>

<span class="ts0">The stock has now being picked and can be managed. Click on the Managed button to manage the items that have being picked.</span>

<span class="ts0">Note:</span>

<span class="ts0">Only at this stage will the stock be moved from On shelf to Job WIP.</span>

<span class="ts0">After clicking on Manage button a window will come up to show whether there is a problem with managing items or not, then you can go back to change the picking slip quantity.</span>

<span class="ts0"> </span>

<span class="ts0">Close button</span>

<span class="ts0">You can close a picking slip at any time except when it has being managed. When the picking slip has being managed it means the stock has already moved from on shelf to Job WIP.</span>

<span class="ts0">Current and History search of Picking slips</span>

<span class="ts0">Go to Job Costing Module &gt; Activity &gt; Picking Slip</span>

<span class="ts0">Click on the search button to search for Picking slips that have being Created, Picked, Managed or Closed. </span>

# Picking Slip Additional Procedure

<span class="ts0">This is where one can add stock onto a picking slip on a job from items already added on from a quote.</span>

<span class="ts0">OR</span>

<span class="ts0">Add new stock onto the job and picking slip.</span>

<span class="ts0">Go to Manage Job &gt; Amend Job &gt; Picking Slip Tab</span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1587).png)

<span class="ts0"> </span>

<span class="ts0">To create a new Picking slip click on the Add to Picking Slip Button</span>

<span class="ts0"> </span>

<span class="ts0">Create a new picking slip to add items to</span>

<span class="ts0">Click on the Add button to create a new picking slip</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1588).png)<span class="ts0"> </span>

<span class="ts0"> </span>

<span class="ts0">Put a new name for the picking slip</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1589).png)

<span class="ts0"> </span>

<span class="ts0">Select the new picking slip name</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1590).png)

<span class="ts0"> </span>

<span class="ts0">To add stock from the list, highlight the item and then click on the add button.</span>

<span class="ts0"> </span>

<span class="ts0">IF you want to add all the items, click on Add All button</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1591).png)

<span class="ts0"> </span>

<span class="ts0">After clicking on Add, a window will appear for you to put a quantity onto the picking slip.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1592).png)

<span class="ts0"> </span>

<span class="ts0"> </span>

<span class="ts0">The items on the lower window will be assigned to the picking slip</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1593).png)

<span class="ts0"> </span>

<span class="ts0">Now if you want to add new items onto the JOB and PICKING SLIP you can use the Add CTC button or Add SC button</span>

<span class="ts0">CTC = Cost To Company</span>

<span class="ts0">SC = Scope Creep</span>

<span class="ts0">CTC is where you are adding the item without a selling price only cost price.</span>

<span class="ts0">SC is where you will put in the selling price to charge the customer.</span>

<span class="ts0">Clicking on CTC button add</span>

<span class="ts0">This will add the item to the job and add to the picking slip</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1594).png)

<span class="ts0"> </span>

<span class="ts0">CTC item added to the picking slip and job, you can now add to the picking slip</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1595).png)

<span class="ts0"> </span>

<span class="ts0">Clicking on SC button add</span>

<span class="ts0">This will add the item to the job and add to the picking slip</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1596).png)

<span class="ts0"> </span>

<span class="ts0">As you can see the stock is added to the picking slip</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1597).png)

<span class="ts0"> </span>

<span class="ts0">You can now print out the printing slip to be issued to staff to pick</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1598).png)

<span class="ts0"> </span>

<span class="ts0">You can see the Picking slip number</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1599).png)

<span class="ts0"> </span>

<span class="ts0">When the stock is then picked from the stores, the store man will highlight the picking slip and click on Picked.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1600).png)

<span class="ts0"> </span>

<span class="ts0">Then the store man after giving the stock to the person will click on Manage Items to move the stock from on shelf to Work in Progress.</span>

# Picking Slip not processing

<span class="ts0">Processing the posted GRVs stock items to Jobs.</span>

<span class="ts0">Go to Job Costing Module &gt; Activity &gt; GRV to Job</span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1604).png)

<span class="ts0"> </span><span class="ts0">Remove the date from and click on the search button, to list all GRVs with Job allocations to them.</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1645).png)

<span class="ts0"> </span><span class="ts0">Highlight the GRV to Process, click on the Process button.</span>

<span class="ts0">Note: This does not do any General Ledger accounting transactions, these have already taken place when the GRV was posted.</span>

<span class="ts0">This Process just moves the stock from On shelf to Job WIP section.</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1606).png)

<span class="ts0"> </span><span class="ts0">If there is a problem with Posting of the GRV, it will come up in red. Click on the X in the top right hand corner to close the window.</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1607).png)

<span class="ts0"> </span><span class="ts0">The GRV to Job Picking Slip will come up. Print out document so that you can research why the stock will not move from On Shelf to Job. Some reasons are as follows:</span>

<span class="ts0">1. Job is closed and stock item cannot move onto a closed job.</span>

<span class="ts0">2. There is insufficient stock on Hand to move to a Job. (stock could have being used on another job or has already being allocated some other way in the system).</span>

<span class="ts0">3. Only one of the items on the Picking slip has one of the above problems and thus the whole process is stopped</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1608).png)

<span class="ts0"> </span><span class="ts0">Click on the print button on the report to print out the document to analysis the data.</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1609).png)

<span class="ts0"> </span><span class="ts0">Go to Job Costing Module &gt; Analysis &gt; Manage Job History.</span>

<span class="ts0">This is to check on jobs which have being closed or cancelled or completed.</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1610).png)

<span class="ts0"> </span><span class="ts0">Once in the search header do the following:</span>

<span class="ts0">1. Put the job number that you want to close in the Job Number field</span>

<span class="ts0">2. Remove your Date From – this allows one to search all jobs from beginning of time</span>

<span class="ts0">3. Click on Search button</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1611).png)

<span class="ts0"> </span><span class="ts0">Double click on the highlighted line or click on the View button at the bottom of the screen.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1612).png)

<span class="ts0"> </span><span class="ts0">When in the Manage Job</span>

<span class="ts0">1. Enter the item code in the filter for quick search</span>

<span class="ts0">2. Click on All Job Lines to show information up on the grid.</span>

<span class="ts0">3. As one can see nothing comes up which means that nothing was entered against the job for that item.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1613).png)

<span class="ts0"> </span><span class="ts0">When in the Manage Job, do the same for the other item</span>

<span class="ts0">1. Enter the item code in the filter for quick search</span>

<span class="ts0">2. Click on All Job Lines to show information up on the grid.</span>

<span class="ts0"> </span><span class="ts0">As one can see nothing comes up which means that nothing was entered against the job for that item.</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1614).png)

<span class="ts0"> </span><span class="ts0">When in the Manage Job, checking for all items entered on the job.</span>

<span class="ts0">1. Leave the item code blank in the filter to search on all items</span>

<span class="ts0">2. Click on All Job Lines to show information up on the grid.</span>

<span class="ts0"> </span><span class="ts0">You will notice that items come onto the grid, if you notice that items have values entered against the Actual column, it means it has being managed and stock has moved from On Shelf to Job WIP.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1615).png)

<span class="ts0"> </span><span class="ts0">Highlight the line so as to see what was managed and by who, date and when. Click on the History Button.</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1616).png)

<span class="ts0"> </span><span class="ts0">Notice that the line was managed on a particular date and by how many.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1617).png)

<span class="ts0"> </span><span class="ts0">Summary:</span>

<span class="ts0">This means that Based on the example we just did, the job was closed and the items were not allocated to the jobs.</span>

<span class="ts0">What does this mean:</span>

<span class="ts0">It means that the stock in the computer accounting system still reflects the stock is in the store room and has not being allocated to the Job.</span>

<span class="ts0">What one has to do is to check the store room to match what stock is actually there vs what the computer accounting system says is on Hand.</span>

<span class="ts0">Should the stock be out with those items then one would have to do a stock level adjustment Journal to reduce the stock levels on hand to match the store. This is only done if the items were not managed on the closed job and that it was not invoiced to that customer. Otherwise the stock has already left the on shelf on the accounting system.</span>

<span class="ts0"> </span><span class="ts0">Checking quantity on hand on system</span>

<span class="ts0">Go to Inventory Module &gt; Configuration &gt; Inventory Setup.</span>

<span class="ts0">Put your item in the Item Code and click on search to pick up the item you are looking for. Highlight the item which is relevant. </span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1618).png)

<span class="ts0"> </span><span class="ts0">Click on the tab called Stock Available, this will tell you how much stock is On Hand vs Stock in WIP.</span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1619).png)

<span class="ts0"> </span><span class="ts0">Check the other item as well. By checking the items</span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1620).png)

<span class="ts0"> </span><span class="ts0">Next example of problems</span>

<span class="ts0">Manually allocating of GRV to Job</span>

<span class="ts0">In this example:</span>

<span class="ts0">The first and third items, the jobs are opened but the second line the job has being closed. This means that you cannot process this document, so we will take you through the steps to allocated the stock to Job WIP</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1621).png)<span class="ts0"> </span>

<span class="ts0"> </span><span class="ts0">Go to Job Costing Module &gt; Activity &gt; Manage Job</span>

<span class="ts0">This is to check on jobs which are non started or started.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1622).png)

<span class="ts0"> </span><span class="ts0">Once in the search header do the following:</span>

<span class="ts0">1. Put the job number that you want to close in the Job Number field</span>

<span class="ts0">2. Remove your Date From – this allows one to search all jobs from beginning of time</span>

<span class="ts0">3. Click on Search button</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1623).png)<span class="ts0"> </span>

<span class="ts0"> </span><span class="ts0">Double click on the highlighted line or click on the Manage Job button at the bottom of the screen.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1624).png)

<span class="ts0"> </span><span class="ts0">When in the Manage Job checking on open jobs</span>

<span class="ts0">1. Enter the item code in the filter for quick search</span>

<span class="ts0">2. Click on All Job Lines to show information up on the grid.</span>

<span class="ts0">3. As one can see nothing comes up which means that nothing was entered against the job for that item.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1625).png)

<span class="ts0"> </span><span class="ts0">We are now going to manually allocate the stock items to the job.</span>

<span class="ts0">Click on Cost to Company to add the item.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1626).png)<span class="ts0"> </span>

<span class="ts0"> </span><span class="ts0">When the window comes up enter the item that is required.</span>

<span class="ts0">Click on the quantity needed.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1627).png)

<span class="ts0"> </span><span class="ts0">To Manage the line at the same time as entering it, click on the Manage Tab and enter the usage quantity. Also enter a note so you will know why you entered this. The GRV number will help. Then click on Save and Close button.</span>

<span class="ts0"> </span><span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1628).png)

<span class="ts0"> </span><span class="ts0">You will notice that the item has being entered onto the Job and that both the budget and Actual quantities have being update. This means that the stock has moved from On Shelf to Job WIP sections.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1629).png)

<span class="ts0"> </span><span class="ts0">You will notice that the item has being entered onto the Job and that both the budget and Actual quantities have being update. This means that the stock has moved from On Shelf to Job WIP sections.</span>

<span class="ts0">To look at the History of the line,</span>

<span class="ts0">Highlight the line and click on the History button.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1630).png)

<span class="ts0"> </span><span class="ts0"> </span><span class="ts0">Next Item</span>

<span class="ts0">Do the same for the next item.</span>

<span class="ts0">However you will notice that on this example the line already exists. It has already 2 items allocated to it.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1631).png)

<span class="ts0"> </span><span class="ts0">We will now highlight the line and click on Manage Job.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1632).png)

<span class="ts0"> </span><span class="ts0">You are now going to manage an additional quantity onto the job.</span>

<span class="ts0">Fill in the quantity in the Usage area, enter your note and click on Save and Close button.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1633).png)

<span class="ts0"> </span><span class="ts0">Notice that the line has increased to usage of 5.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1634).png)

<span class="ts0"> </span><span class="ts0">When highlighting the line and clicking on the History button, one can see the movement history on this item.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1635).png)

<span class="ts0"> </span><span class="ts0">After Analysis and adding items</span>

<span class="ts0">This procedure is shown on how to write off stock on jobs that have being closed and stock needs to be written off (note: the item used here was already allocated to a closed job and does not need to be written off, this is JUST an example of how to do this)</span>

<span class="ts0">Write off stock to the closed Job 2975 of 1 item after checking physical stock.</span>

<span class="ts0">One must check the physical stock in the store room to the stock on hand on the system.</span>

<span class="ts0">Go to Inventory Module &gt; Activity &gt; Stock Level Adjustment</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1636).png)

<span class="ts0"> </span><span class="ts0">Click on the insert button at the bottom of the screen.</span>

<span class="ts0">Fill in the information needed on what is being written off. Make clear notes so when auditors need to check why one is writing off the stock you have valid reasons.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1637).png)

<span class="ts0"> </span><span class="ts0">Inserting of the line to be written off.</span>

<span class="ts0">1. Select and search for the item.</span>

<span class="ts0">2. Select the warehouse that you are reducing the item by.</span>

<span class="ts0">3. Select the Decrease circle button.</span>

<span class="ts0">4. Enter the amount you are decreasing the item by.</span>

<span class="ts0">5. Enter a reason.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1638).png)

<span class="ts0"> </span><span class="ts0">This is what the batch will look like. Click on Close to go back to the Stock Level adjustment batch processing.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1639).png)

<span class="ts0"> </span><span class="ts0">At the bottom of the window, click on the Process tab, click on the Verify button to ensure that the stock level will process.</span>

<span class="ts0">Click on the process button to complete the transaction.</span>

<span class="ts0">This will now update the General Accounts by reducing the stock ledger account and stock adjustment account.</span>

<span class="ts0">It will also do the stock movement from On Shelf out of the system.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1640).png)

<span class="ts0"> </span><span class="ts0">Closing of GRV to Job Picking Slip</span>

<span class="ts0">Now one can remove the GRV to Job item from the list with valid reasons.</span>

<span class="ts0">Go to Job Costing Module &gt; Activity &gt; GRV to Job</span>

<span class="ts0">Highlight the line GRV to be removed.</span>

<span class="ts0">Click on the REMOVE button.</span>

<span class="ts0">Note: there is no General ledger transactions that take place, it merely removes the GRV from this list.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1641).png)

<span class="ts0"> </span><span class="ts0">Confirm you want to remove this item. Click on Yes to do this.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1642).png)

<span class="ts0"> </span><span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1643).png)

<span class="ts0"> </span><span class="ts0">Message comes up to alert the user that it was successfully removed.</span>

<span class="ts0"> </span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1644).png)<span class="ts0"> </span>

<span class="ts0">Enter a reason in the note space as to why you are removing and click on the OK button.</span>

# Job Delivery Note

# Job Delivery Note Search

<span style="color: rgb(45, 194, 107);">**Job Costing Module &gt; Activity &gt; Job Delivery Note**</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-08/scaled-1680-/EAgimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-08/EAgimage.png)

<table border="1" id="bkmrk-search-clicking-sear" style="border-collapse: collapse; width: 100%; height: 207.2px;"><colgroup><col style="width: 16.9524%;"></col><col style="width: 83.1429%;"></col></colgroup><tbody><tr style="height: 29.6px;"><td style="height: 29.6px;">Search</td><td style="height: 29.6px;">Clicking Search will bring up all the Job Delivery Notes unless a Filter is added eg: <span class="ts0">job number, DN </span><span class="ts0">number or customer name</span></td></tr><tr style="height: 29.6px;"><td style="height: 29.6px;">Add</td><td style="height: 29.6px;"><span class="ts0">Add a new Job Delivery Note</span></td></tr><tr style="height: 29.6px;"><td style="height: 29.6px;">Edit</td><td style="height: 29.6px;"><span class="ts0">Edit the currently selected Delivery Note Item.</span></td></tr><tr style="height: 29.6px;"><td style="height: 29.6px;">Cancel</td><td style="height: 29.6px;"><span class="ts0">Cancels the currently selected Delivery Note Item.</span></td></tr><tr style="height: 29.6px;"><td style="height: 29.6px;">Deliver</td><td style="height: 29.6px;">  
</td></tr><tr style="height: 29.6px;"><td style="height: 29.6px;">Process</td><td style="height: 29.6px;"><span class="ts0">Processes the currently selected Delivery Note Item to Delivered.</span></td></tr><tr style="height: 29.6px;"><td style="height: 29.6px;">Print</td><td style="height: 29.6px;">You can print the Delivery note or the Cut sheet </td></tr></tbody></table>

# Manage Job Delivery Note

# Job Invoice

# Job Costing Invoicing

#### **Invoicing**

1. As a fully Completed Job
2. Line by Line

##### Invoicing a fully completed job

Once the job is fully completed and all line items have been managed, you can click the **“Thumbs Up” icon** at the top tabs, labeled **“Ready to Invoice.”**

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/aokimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/aokimage.png)

##### Invoicing a Job by Line/s

For line-by-line invoicing, each line item includes a **dot** under the **“To Inv”** column. Clicking this dot will change it to a **“Thumbs Up” icon**, indicating that the item is **ready to be invoiced**. Once selected, the line will be moved over to the invoice.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/FvFimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/FvFimage.png)

To invoice a Job go to **Job Invoice**

**<span style="color: rgb(45, 194, 107);">Job Costing &gt; Activity &gt; Job Invoice</span>**

<span style="color: rgb(0, 0, 0);">You will see that your invoice is sitting in the "**Ready For Invoice**" tab</span>

- <span style="color: rgb(0, 0, 0);">Double click on the invoice line to open the invoice  
    </span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/hszimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/hszimage.png)

You will then need to choose what type of Invoice you are creating

- **Percentage-Based Invoicing -** Percentage invoicing enables you to specify a billing amount and include a summary description, while concealing detailed line items. This approach facilitates progressive billing over the duration of a project: for example, when a client pays 25% upfront to initiate work, followed by three equal monthly payments covering the remaining 75%. This does not look at what has or has not been managed on a job.
- **Usage/Actual Invoicing -** Usage or Actual Invoicing allows you to bill based on real-time job progress, capturing actual hours worked, materials used, or completed tasks. It displays detailed line items and supports flexible billing as the job evolves—ideal for time-and-materials work or projects with variable scope and deliverables.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/Ztzimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/Ztzimage.png)

Once an invoice type, either Usage or Percentage, is selected for a job, it becomes fixed and cannot be changed. This selection determines how the job will be invoiced through to completion. After choosing the invoice type, the next screen will display the job number and confirm the selected invoicing method

Next, indicate whether this is the final invoice by ticking the **Final Invoice** box.

- If you **do not** tick "Final Invoice," the job will remain open. You will also be able to do multiple invoices on this job.
- If you **do** tick "Final Invoice" and all work is complete, the system will automatically check for any open documents related to the job and alert you. These documents must be closed or cancelled before the invoice can be processed.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/nnLimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/nnLimage.png) [![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/RG7image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/RG7image.png)

- Click **Create Invoice**
- Click **Continue**

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/2miimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/2miimage.png)

<p class="callout info">Once you create a final invoice you will not be able to open the Job in **Manage Job**</p>

The invoice will now appear under the "**Job Invoices**" tab, having moved from the "**Ready For Invoice**" tab. In the "**Final Inv.**" column, you'll see either "**Yes**" or "**No**" based on your earlier selection. This view also confirms the invoicing method chosen, either **Usage** or **Percentage**.

- **Double Click** on the Invoice line to open the invoice

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/k0Eimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/k0Eimage.png)


At this stage, all values are set to zero, prompting you to specify what you’d like to invoice. For a straightforward job, simply click the green "**Invoice All Qtys**" button to proceed as shown in the below screenshot.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/4fcimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/4fcimage.png)

<table border="1" id="bkmrk-by-clicking-%22inv.-al" style="border-collapse: collapse; width: 100%;"><colgroup><col style="width: 21.1256%;"></col><col style="width: 78.9827%;"></col></colgroup><tbody><tr><td>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/UZdimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/UZdimage.png)

</td><td>By clicking "**Inv. All Qtys**" to add total to your invoice it will add all lines including all Cost to Company (CTC) Lines. These can be deleted in added accidently</td></tr><tr><td>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/YQximage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/YQximage.png)

</td><td>By selecting "**Inv. All Qtys &amp; Display**," you’ll be able to choose which items appear on the invoice with or without a dollar value. To configure these display settings, click on the second tab labeled "**Cost To Company.**"</td></tr></tbody></table>

The below **Manage Invoice All Qtys** window will pop up:

- You will then select "**Invoice - All Lines**"
- Click **Continue**

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/2L5image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/2L5image.png)

<table border="1" id="bkmrk-invoice---all-lines-" style="border-collapse: collapse; width: 100%; height: 59.4034px;"><colgroup><col style="width: 22.197%;"></col><col style="width: 77.9113%;"></col></colgroup><tbody><tr style="height: 29.7017px;"><td style="height: 29.7017px;">Invoice - All Lines

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/UkSimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/UkSimage.png)

</td><td style="height: 29.7017px;">You would select All Lines to be invoiced if you selected the be button to invoice your job   
</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px;">Invoice - To Invoice Lines

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/S90image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/S90image.png)

</td><td style="height: 29.7017px;">  
If you’ve marked specific lines for invoicing using the thumbs-up icon in the "To Inv" column, proceed by selecting the "To Invoice Lines" option to generate an invoice for only those approved items.

</td></tr></tbody></table>

Once you have clicked "**Continue**" you will see that the values have pulled through from the Job.

At this point you can make any necessary changes to this invoice before finalizing it.

<p class="callout warning">Reminder: If you've selected "Final Invoice," no further invoices can be generated for this job. Any managed lines that are not invoiced at this stage will be written off automatically by the system (CTC). However, if you've chosen to invoice only selected lines, you can adjust the quantities here, and any remaining balance will be available for invoicing at a later stage.</p>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/TMuimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/TMuimage.png)

Before proceeding with this invoice, please review the **Cost to Company (CTC) tab**. To display specific lines on the invoice, enter a value in the corresponding "**Display Qty**" field. Note: this will show the line items without revealing any cost or sell price.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/G6Rimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/G6Rimage.png)

To view the invoice to check how it will be displaced

- Click the "**Print**" button at the top and
- Click "**Continue**" on the "**Job Usage Invoice Print**" Screen

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/uNRimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/uNRimage.png)

You will now be able to see as shown below what the invoice will look like when sent out.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/ciiimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/ciiimage.png)

Once you are happy with it all

- Click "**Save**"
- Click "**Close**"

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/iARimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/iARimage.png)

- **Highlight** the line of the invoice you want to process and send out.
- Click "**Process**" at the top of the screen

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/3UQimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/3UQimage.png)

If an item on the invoice is marked as "Cost to Company"—meaning it's not charged to the customer—you’ll see the following prompt to confirm.

- Click "**Yes**"

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/wgwimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/wgwimage.png)

And then you will get the next screen

- Click "**Continue**"

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/gjNimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/gjNimage.png)

You'll see the screen below indicating that the system is compiling and processing all transactions related to this invoice.

- Click "**Continue**"

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/qRRimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/qRRimage.png)

This is the final screen where you can make any last adjustments to your invoice.

- Click "**Continue**"

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/jlNimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/jlNimage.png)

<table border="1" id="bkmrk-details-this-changes" style="border-collapse: collapse; width: 100%;"><colgroup><col style="width: 19.0839%;"></col><col style="width: 80.9053%;"></col></colgroup><tbody><tr><td>Details</td><td>This changes the view of your invoice when clicking print</td></tr><tr><td>Show Zero Balances</td><td>  
</td></tr><tr><td>Layout Selection</td><td>  
</td></tr><tr><td>Terms &amp; Conditions</td><td>  
</td></tr><tr><td>Layout</td><td>  
</td></tr></tbody></table>

The invoice is now finalized and ready to be sent to your customer for payment. Once issued, it will automatically close the associated job.

Click "**Print**" or "**Email**" to send this final invoice out to the customer

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/kFlimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/kFlimage.png)

---

##### Job Invoice - Split by Employee

<div id="bkmrk-this-option-uses-a-l">This option uses a Labour stock code (Service Item) to divide the total hours for a job among multiple employees. It also allows you to apply discounts to the hours worked by specific employees.</div><div id="bkmrk--1"></div><div id="bkmrk--61"></div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/scaled-1680-/Kknimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/Kknimage.png)

<div id="bkmrk-in-manage-job%2C-you-c">In **Manage Job**, you can allocate hours to the job and assign those hours to a specific employee by selecting their name from the dropdown menu.</div><div id="bkmrk--2"></div><div id="bkmrk--63"></div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/scaled-1680-/ppmimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/ppmimage.png)

When invoicing you will get the below screen. Here you will need to tick the "Split by Employee" box which will then separate the employees on the invoice.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/scaled-1680-/OfLimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/OfLimage.png)

The invoice will have a column now that will show the name of the employees and how many hours they did on the job.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/scaled-1680-/131image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/131image.png)

In order to discount the hours or change the hours for this invoice you will need to click Invoice All Quantities (Inv. All Qtys)

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/scaled-1680-/Ouzimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/Ouzimage.png)

- Click **Continue**

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/scaled-1680-/lxiimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/lxiimage.png)

<div id="bkmrk-to-reduce-or-discoun">To reduce or discount the hours for a specific employee, locate the **Process Qty** field highlighted in green. By clicking into the relevant cell, you can adjust the number of hours you wish to bill for that particular employee.</div><div id="bkmrk--69"></div><div id="bkmrk--70"></div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/scaled-1680-/Hqzimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-01/Hqzimage.png)

---

# Invoice Value Summary

Summary invoice values allow items to be grouped and displayed as totals, rather than showing each individual line on the invoice.

<div id="bkmrk-these-values-appear-">- These values appear at the **bottom of the invoice**
- Individual line items are **hidden**, while totals are grouped by item type

</div>**Item Types**

<div id="bkmrk-service-%3D-labour-cus">- **Service** = Labour
- **Custom** = Consumables
- **Stock** = Materials

</div>**Setup**

To include items in the invoice summary:

<div id="bkmrk-tick-the-relevant-it">- Tick the relevant items
- These will be **hidden from the main invoice lines**
- Their values will be **grouped and displayed as totals** in the summary section

  
</div>##### **Value Summary Setup - Inventory Item**

This screen shows how the **Invoice Value Summary** is configured at an item level within **Inventory Setup**.

By ticking the **“Invoice Value Summary”** checkbox (highlighted on the screen), the selected inventory item will **not display as a separate line on the invoice**. Instead, its value will be:

<div id="bkmrk-hidden-from-the-main">- **Hidden from the main invoice detail**
- **Grouped into the summary totals** at the bottom of the invoice (e.g. Labour, Consumables, Materials)

</div>This setting is applied **per item**, allowing you to control which items are summarised versus shown individually.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-03/scaled-1680-/tYgimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-03/tYgimage.png)

##### **Value Summary Setup - Update a Job Line**

This screen shows how to control whether a **job line** is displayed individually on the invoice or included in the **Invoice Value Summary**.

To update a job line:

<div id="bkmrk-open-the-job-and-sel">- Open the job and select the relevant line
- Go to the **Job Detail** tab (highlighted in the screen)
- Tick the **“Invoice Value Summary”** checkbox

**What this does**</div>When the **Invoice Value Summary** option is selected on the job line:

<div id="bkmrk-the-line-will-be-hid">- The line will be **hidden from the detailed invoice view**
- The value will instead be **grouped into the summary totals** at the bottom of the invoice (e.g. Labour, Consumables, Materials)

</div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-03/scaled-1680-/L87image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-03/L87image.png)

##### **Value Summary Setup - Job Invoice Line**

This screen shows how to control whether an item is displayed individually on the invoice or included in the **Invoice Value Summary**.

To update this on a job invoice line:

<div id="bkmrk-open-the-invoice-lin">- Open the **Invoice Line**
- Tick the **“Invoice Value Summary”** checkbox (highlighted on the screen)

**What this does**</div>When **Invoice Value Summary** is selected:

<div id="bkmrk-the-line-will-be-hid-1">- The line will be **hidden from the detailed invoice view**
- The **sell value is still included**, but grouped into the summary totals (e.g. Labour, Consumables, Materials) at the bottom of the invoice

</div>[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-03/scaled-1680-/MqHimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-03/MqHimage.png)

# Job Costing Percentage Invoice

#### <span class="ts15">Go to Job Costing Module &gt; Activity&gt; Quotation</span>

<span class="ts0">Click Add to create a new Quote</span>

<span class="ts0">Select the customer</span>

<span class="ts0">Enter a Reference</span>

<span class="ts0">Enter the Order Number</span>

<span class="ts0">Click Save</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/IjZimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/IjZimage.png)

<span class="ts0">Click Add</span>

<span class="ts0">Enter the required Item code</span>

<span class="ts0">Enter the quantity</span>

<span class="ts0">Check the selling price and amend if required</span>

<span class="ts0">Click Save and close</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/feOimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/feOimage.png)

<span class="ts0">Click Approval Options tab</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/2Jrimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/2Jrimage.png)

<span class="ts0">Select Approve to Job</span>

<span class="ts0">Enter a Description</span>

<span class="ts0">Check the Order number</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/Pb1image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/Pb1image.png)

<span class="ts0"> </span><span class="ts0">Click Continue</span>

<span class="ts0">Make a note of the Job number (if necessary)</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/UXDimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/UXDimage.png)

<span class="ts0">Click OK</span>

<span class="ts0">The Job has now been opened and can be found under the Managed Job Menu</span>

<span class="ts0">Go to activity&gt; Manage Job&gt; Enter the job Number&gt; Click Search</span>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/scaled-1680-/g4Rimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2026-06/g4Rimage.png)

<span class="ts0">The client/ Job Manager/ Installer can then sign the picking slip as acknowledgment of receipt of the item(s)</span>

<span class="ts0">Prior to installation, you may need the client to pay a deposit of the total order value.</span>

<span class="ts0">This is done by way of a Percentage Invoice:</span>

<span class="ts0">Go to Activity&gt; Job Invoice&gt;</span>

<span class="ts0">Click Insert</span>

<span class="ts0">Enter the Job Number and Press Enter</span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1014).png)

<span class="ts0">Select Percentage Invoice from the “Type of Invoice” Drop down</span>

<span class="ts0">NOTE: DO NOT CLICK FINAL INVOICE BOX AT THIS STAGE</span>

<span class="ts0">Click Create</span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1015).png)

<span class="ts0">Enter the Deposit amount to be invoiced</span>

<span class="ts0">Enter the estimated Cost of this invoice.</span>

<span class="ts0">Note: assuming you require a 50% deposit to be paid upfront, then the cost amount to be entered here will also be 50% of the total order cost</span>

<span class="ts0">In our example: Selling price per unit equals R 150</span>

<span class="ts0"> Cost Price per unit equals R 100</span>

<span class="ts0">Total Selling Price = R 7500 (50x R150)</span>

<span class="ts0">Total Cost Price = R 5000 (50x R100)</span>

<span class="ts0">This 50% Deposit equals R 3750</span>

<span class="ts0">And 50% Cost equals R 2500</span>

<span class="ts0">Enter a description to be printed as a invoice line on the invoice.</span>

<span class="ts0">Click Save and Close</span>

<span class="ts0">Click Close</span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1016).png)

<span class="ts0">Check that the correct invoice is highlighted</span>

<span class="ts0">Click the Process Tab</span>

<span class="ts0">Click Process button</span>

<span class="ts0">The invoice will print to screen. You can now print a hard copy and/or email the invoice as required.</span>

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1017).png)

<span class="ts0"> </span>

<span class="ts0">The ledger account entries for this invoice will be as follows:</span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1018).png)

<span class="ts0">Upon completion of the job, you will then need to create an invoice for the balance of the amount due.</span>

<span class="ts0">Go to Activity&gt; Job Invoice&gt; Click Insert</span>

<span class="ts0">Enter the Job Number and press Enter</span>

<span class="ts0">Click Final Invoice Box</span>

<span class="ts0">Click Create</span>

<span class="ts0">Enter the remaining balance to be invoiced</span>

<span class="ts0">Enter the remaining estimated Cost</span>

<span class="ts0">Enter the Description to be printed on the invoice Line</span>

<span class="ts0">Click Save and Close</span>

<span class="ts0">Click Close</span>

<span class="ts0">Click The Process Tab and then click the Process Button</span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1019).png)

<span class="ts0">Ensure that the drop down is selected as “Stock Write Off”</span>

<span class="ts0">(This is to remove the stock from the system)</span>

<span class="ts0">Click Continue</span>

<span class="ts0">The final Invoice will then print to screen and you can print a hard copy or email as required</span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1020).png)

<span class="ts0"> </span>

<span class="ts0">Click Close to close the Job</span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1021).png)

<span class="ts0">The Ledger entries for this invoice will be as follows</span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1022).png)

<span class="ts0"> </span>

<span class="ts0">Accumulatively the ledger accounts will look as follows:</span>

![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(1023).png)

<span class="ts0"> </span>

<span class="ts0">NOTE:</span>

<span class="ts0">Since the cost of the items are estimated initially, upon closure of the job, the Actual system average cost will be posted to the Work in Progress Account. </span>

<span class="ts0">This will result in the Work in progress account not being cleared out.</span>

<span class="ts0">You will then need to process a journal in order to clear the Work in progress account. The contra account being most likely the Cost of Sales Account. (in order to realise the actual cost on your financials)</span>

# Job Lines clear "To be invoiced" flag

<div id="bkmrk-each-job-line-includ">Each job line includes a **To Be Invoiced indicator**, displayed as a **thumbs-up icon** in the **To Inv** column.  
A highlighted thumbs-up icon indicates that the line is selected and will be included in the next invoice.</div>To clear all **To Be Invoiced** flags, use the **Clear All Lines To Invoice** button after completing the invoice for the job.

This will remove the thumbs-up icon from all job lines and reset them for future invoicing.

<span class="ts0"> </span>![](https://hugeerp0.co.za/csp/webhelp/topics/images/image(3897).png)

# Job Collect / Delivery

# Job Costing Case Studies

# Quote Creation

#### <span style="text-decoration: underline;">**Quote Creation**</span>

**<span style="color: rgb(45, 194, 107);">Job Costing &gt; Activity &gt; Quote</span>**

Before adding your line items to your quote, take a moment to review the key tabs across the top of your page, some of these tabs may contain important options you may want to configure or define first for a basic Quote.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/zymimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/zymimage.png)

**<span style="color: rgb(0, 0, 0);">Quote Detail Tab:</span>**

- Click **"Add"**
- Enter the Customer name and Description.
- Click **"Save"**(By clicking save you activate the button allowing you to "Add" a line item.)

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/kCeimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/kCeimage.png)

**Address Tab:**

- Use this tab to update the job address if required.
- Select the contact person for the quote from the dropdown list.
- If the contact does not exist yet, click the **View** button to add a new contact on the fly

<p class="callout info">Note: if details are edited on the quote, this will only apply to the specific quote and not update the debtor setup unless the debtor setup is access and updated as well.</p>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-10/scaled-1680-/Cltimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-10/Cltimage.png)

**Extras Tab: Select the billing method that applies to this job**

Among the top tabs, click on the "**Extras**" tab.

- Tick the box that applied to your customer.
- Click "**Save**"

<table border="1" id="bkmrk-assembly-%E2%80%9Cassembly%E2%80%9D-" style="border-collapse: collapse; width: 100%; height: 189.929px;"><colgroup><col style="width: 25.8875%;"></col><col style="width: 74.2208%;"></col></colgroup><tbody><tr style="height: 63.3097px;"><td style="height: 63.3097px;">Assembly</td><td style="height: 63.3097px;">“**Assembly**” refers to an internal process where components or materials are prepared, combined, or staged before installation or delivery. It’s not billed separately to the customer but contributes to your overall job cost.</td></tr><tr style="height: 63.3097px;"><td style="height: 63.3097px;">Charge Up (SC)</td><td style="height: 63.3097px;">**Charge Up (SC)”** means the customer is billed for actual time and materials used, including any extras beyond the initial scope. Charge Up allows you to invoice for additional costs incurred during the job.  
</td></tr><tr style="height: 63.3097px;"><td style="height: 63.3097px;">Prepaid (CTC)</td><td style="height: 63.3097px;">**"Prepaid**” refers to the quoted amount for the job, the fixed charge agreed to by the customer. You can’t invoice beyond this amount, so any extra time, materials, or costs that exceed the quote become your internal expense, or ‘**Cost to Company (CTC)**

</td></tr></tbody></table>

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-10/scaled-1680-/2uzimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-10/2uzimage.png)

[**Link Tab explained**](https://hugeerp10.co.za/hsofmanual/%7B#bkmrk-link-tab%7D)

 **Adding Line Items to a Quote.**

- Click the "**Add**" button located halfway down the page

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-10/scaled-1680-/0Dbimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-10/0Dbimage.png)

- From the dropdown menu, choose the relevant item (**Stock**, **Service**, or **Custom Items**.)

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/WUXimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/WUXimage.png)

- Once selected, check the basic fields:  
    **1** Select Item  
    **2** Check description as this can be changed at this point  
    **3** Add Quantity  
    **4** Check Cost of Item  
    **5** Check your markup  
    **6** Check Sell Price
- click **Save &amp; Close** to confirm your choice
- Add as many as items as needed

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/JU5image.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/JU5image.png)

<table border="1" id="bkmrk-selling-ex-gst-price" style="border-collapse: collapse; width: 100%; height: 631.548px;"><tbody><tr style="height: 29.7017px;"><td style="height: 29.7017px; width: 16.2446%;">**Stock Item**</td><td style="height: 29.7017px; width: 83.8637%;">Select your **stock item** from the drop-down menu

</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px; width: 16.2446%;">**Description**</td><td style="height: 29.7017px; width: 83.8637%;">At this stage you can change the **Description** if needed

</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px; width: 16.2446%;">**Qty**</td><td style="height: 29.7017px; width: 83.8637%;">Add the **Quantity** you require of this item

</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px; width: 16.2446%;">**Cost Per Unit**</td><td style="height: 29.7017px; width: 83.8637%;">Check the cost of this item

</td></tr><tr style="height: 29.7017px;"><td style="height: 29.7017px; width: 16.2446%;">**Mark up %**</td><td style="height: 29.7017px; width: 83.8637%;">At this stage you can increase your profit %

</td></tr><tr style="height: 46.5057px;"><td style="height: 46.5057px; width: 16.2446%;">**Selling Ex GST**</td><td style="height: 46.5057px; width: 83.8637%;">Price does **not include** the 15% Goods and Services Tax. You add GST on top of the listed amount.

</td></tr></tbody></table>

You can now submit this quote for customer approval.

At the top of the quote, you'll find **Approval Options.** From here, you can either send the quote for internal approval before forwarding it to the customer, or send it directly to the customer. Once customer approval is received, use the same dropdown menu to promote the quote to a Job.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/dfnimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/dfnimage.png)

Once you click **Approve to Job** you will have the below **Approve Quote to Job** screen pop us.

You will always need an Order number, here you will also make sure you have selected weather this is a Charge Up (Scope Creep) or a prepriced (Cost to company) job.

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/0Gbimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/0Gbimage.png)

- Click **Continue** to create the job

[![image.png](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/scaled-1680-/Ckaimage.png)](https://hugeerp10.co.za/hsofmanual/uploads/images/gallery/2025-11/Ckaimage.png)